| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 Accepted | |
| 2 | L2₹4.8 L+₹2.0 L (71.0%)Rejected-Finance | L2 | Rejected-Finance Being L2 rejected | |
| 3 | L3₹6.5 L+₹3.7 L (133.3%)Rejected-Finance | L3 | Rejected-Finance Being L3 rejected | |
| 4 | L4₹6.8 L+₹4.0 L (142.8%)Rejected-Finance HEAD OFFICE PLOT NO A 9 IDCO INDUSTRIAL ESTATE NEAR SAI INTERNATIONAL SCHOOL PATIA BHUBANESWAR 751024 ODISHA PATIA | KHORDHA | ODISHA | 751024 | L4 | Rejected-Finance Being L4 rejected | |
| 5 | L5₹6.9 L+₹4.1 L (147.2%)Rejected-Finance | L5 | Rejected-Finance Being L5 rejected |
Tender Value
₹9.3 L
Closing Date
24 Mar 2021, 6:00 pmClosed
AV Ramakrishna
AGM Civil, Enggineering Civil office, AAI, Begumpet Airport.
As per NIT
2021_AAI_73355_1
Consultancy services for survey and volume calcula
Open Tender
Civil Works - Bridges
Item Rate
30 days
Begumpet Airport
As per NIT
14 documents required · 14 mandatory
₹1,180
Yes
Exempted
30 Jun 2021
16 Mar 2021
26 Mar 2021
17 Mar 2021
24 Mar 2021
17 Mar 2021
17 Mar 2021 - 23 Mar 2021
Amount
Providing Contour map by conducting Topographical survey inside the operational area including taking reduced levels at 5M x 5M intervals and preparation of contour map. The levels shall also be submitted on excel spread sheet and in any other form as decided by the Engineer in Charge. The Counter map is prepared to carry out the wall to wall grading inside the operational area. The quoted rate shall include the following. 1. Carrying out site survey and taking reduced levels at 5M x 5M grid. 2. Marking of the existing structure, payment, drains & converts, roads & buildings, electricals and CNS installations, etc in the contour map. 3. Finalizations of the best profile for the wall to wall grading of the operational area as per the ICAO regulations wherever applicable and sound Engineering practices in keeping with the ground profile and prevailing drainage system. 4. Study of the existing drainage system including suggestion of improvement and agumentation plan for the smooth drainage system in operational area duly considering hydrological data. 5. Submission of 4 sets of contour map in scale (1:5000) with marking structures (3 hard copies and 1 soft copy) Note: The survey work shall be carried out inside operational area in restricted working hours. All men and vehicles shall be permitted to enter the operational area only on possession of security passes. Existing level of runway, taxiways, main Apron and remote apron will be provided by AAI and the same needs to be incorporated in contour map. Payment will be restricted to the area of operational area excluding above said pavements.
Preparation ad submission of quantity calculating of earth work in Excavation/ Excavation of Ordinary rock & Hard rock and filling needed to achieve proper wall to wall grading of required slope and gradient of operational area based on the data obtained from Topographical survey & contour map and as per the above finalized profile including submission of 6 sets of contour maps and quantity calculation sheets in hard copys and also in soft copy.
TECHNOLAND ENGINEERS AND SURVEYORS
U.C.CONSULTANCY
IDAX CONSULTING AND RESEARCH PVT. LTD.
N K Engineers
Growever Infra Private Limited
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .