| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAdmitted-Finance | ₹20.4 L | L1 | Admitted-Finance |
| 2 | L2₹20.8 LAdmitted-Finance BAGDAH NORTH 24 PARGANAS | ₹20.8 L | L2 | Admitted-Finance |
| 3 | L3₹20.8 LAdmitted-Finance 14 SURI LANE KOLKATA 700 014 | KOLKATA | KOLKATA | WEST BENGAL | 700014 | ₹20.8 L | L3 | Admitted-Finance |
| 4 | L4₹23.1 LAdmitted-Finance | ₹23.1 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | T.D.K. ENTERPRISE L3 | Messrs HI- Q - ENTERPRISE L4 | DECADON ENGINEERING L1 | MALLICK ENTERPRISE L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling the existing electrical accessories like all kinds of old wiring, batten, wooden block, conduit pipe, main switche, net guard, iron clad DB, MCB DB, Bus bar, light fittings, fans, fan clamps, power board, different sizes cable, gland, nail, fastener, damaged panel, incoming & out going cable etc. at working site and deposit the dismantles items at section store with mending good the damages as per direction. | 1 | Job | 2,750 ₹2,750 | 10,000 ₹10,000 | 6,000 ₹6,000 | 2,800 ₹2,800 |
| 2.00Supply & delivery of cubicle type 415 V, LT distribution panel board of required size, compartmentalised with maple arrangement, having rigid & self-supporting structure fabricated by 2 mm thick CRCA sheet steel with M/S angle/flat frame. The panel board consists of the following switches. Incoming: Switch dis-connector fuse unit in open execution, TPN, 50 HZ, 415 V, 315 Amp with 3 nos. 315 Amp Din type HRC fuse link - 1 no. [Make - Siemens / ABB / Schneider] Bus Section: 415 V, 500 A, electrolytic graded Al. bus bar Ph. & N. (Size of bars - 4 x 80 mm x 6 mm). The bus bar shall be fixed with FRP chairs, and all bars shall be insulated with PVC heat-shrinkable sleeves of suitable size and different colours, as per the norms and directions of E.I.C. All interconnections should be done with appropriately sized aluminium bars. Outgoing: SDFU in open execution TPN 50 HZ, 415 Volt - i) 200 Amp - 1 no., ii) 125 Amp - 4 nos. with Din type HRC fuse link as per rating of each SFUs [Make - Siemens / ABB / Schneider]. All SFUs should be connected with the required size/equivalent rating Al. flat. | |||||||
| 2.10Metering, Control & Indication Arrangement :- a) Digital display Multifunction Meter (Make - Siemens / ABB / Schneider) - 1 no. b) CT, 300/5 A (Make - Kappa) - 3 nos. c) Indicating LED lamps for Red/Yellow/Blue (Make - L&T/ABB/Siemens) - 3 nos. d) 6 A SP MCB - 3 nos. e) Danger Board 18 SWG (12" x 8") - 1 no. Cable Alley: Cable entry arrangement will be provided on the back side of the cubicle panel, positioned at the bottom end in a vertical orientation, with a 630 Amp capacity and 4-way extended Al. flat Bar. A flat terminal indicating phase & neutral for each outgoing main switch, including the gland plate, must be placed at the bottom of the panel with a detachable type, as per the direction of E.I.C. Additionally, provide 1 no. Bus Alley in vertical, 2 nos. cable alley. Painting: The complete panel board shall be painted by 2 coats of powder-coated synthetic enamel Paint over two coats of R.O. primer of Approved make, brand & color as per the direction of E.I.C. | |||||||
| 2.20 | Constructional Details: All incoming & outgoing panel-mounted cubical Switch Disconnector fuse shall be housed in a respective compartment with a hinged & gasket Door at the front. All doors shall have a Panel lock Arrangement. The panel shall be properly gasket to prevent ingress of dust & moisture & Remain. Bus bar will be properly arrange & all Switches shall be fixed by M.S. nuts & bolts and also all SFU/SDFU units should be connected with the proper size electrolyting graded tinned Al. flat / Bar / as per direction of E.I.C.
Installing the LT panel in position with the necessary items required and making a brick foundation for levelling up the LT panel, such that the incoming cable can be connected in the proper way without stress.
Proper size of panel, length of BBC, construction details, arrangements of all I/C and O/G SFUs and others with drawing should be approved by the EIC before construction of this Panel. | 1 | No | 1,95,750 ₹2.0 L | 1,50,000 ₹1.5 L | 1,25,300 ₹1.3 L | 30,000 ₹30,000 |
| 3.00Supply & delivery of cubicle type 415 V, LT distribution panel board of required size, compartmentalised with maple arrangement having rigid & self-supporting structure fabricated by 2 mm thick CRCA sheet steel with M/S angle/flat frame. The panel board consists of the following switches. Incoming: i) SDFU in open execution, TPN, 50 HZ, 415 V, 200 Amp with 3 nos. 200 Amp Din type HRC fuse link - 1 no. [Make - Siemens / ABB / Schneider], ii) 415 V, 200 Amp on load front-operated Changeover Switch-Disconnector (Conforms to IEC 60947-3, IS/IEC 60947-3) - 1 no. [Make - LK, Cat. No. - CO22000OOOA or a similar type of Siemens / ABB / Schneider] Bus Section: 415 V, 300 A, electrolytic graded Al. bus bars for Phs. & N. (Size of bars - 4 x 60 mm x 5 mm). The bus bar shall be fixed with FRP chairs, and the entire bars are insulated with PVC heat-shrinkable sleeves of suitable size and different colours, as per the norms and directions of E.I.C. All interconnections should be done with appropriately sized Copper bars. Outgoing: Switch disconnector fuse unit in open execution TPN 50 HZ, 415 Volt - i) 125 Amp - 3 nos.., ii) 63 Amp - 1 no. with Din type HRC fuse link as per rating of each SFUs [Make - Siemens / ABB / Schneider]. All SFUs should be connected with the required size / equivalent rating tinned Cu. flat bar. | |||||||
| 3.10Metering, Control & Indication Arrangement :- a) Digital display Multifunction Meter (Make: Siemens / ABB / Schneider) - 1 no. b) CT, 200/5 A, Make - Kappa - 3 nos. c) Indicating LED lamps for Red/Yellow/Blue (Make - Schneider/ABB/Siemens) - 3 nos. d) 6 A SP MCB - 3 nos. e) Danger Board 16 SWG (6" x 4") - 1 no. Cable Alley: Cable entry arrangement will be provided in the back side of the cubical panel in the bottom end vertical position, 630 Amp capacity 4-way extended Cu. flat terminal indicating phase & neutral for each outgoing main switches including gland plate must be placed at the bottom of the panel with detachable type as per direction of E.I.C. and also to be provided 1 no Bus Alley in vertical, 2 nos. cable alley. Painting: The complete panel board shall be painted by 2 coats of powder-coated synthetic enamel Paint over two coats of R.O. primer of Approved make & brand & color as per Direction of E.I.C. | |||||||
| 3.20 | Constructional Details: All incoming & outgoing panel-mounted cubical switch disconnector fuses shall be housed in a respective compartment with a hinged & gasketed door at the front. All doors shall have a Panel lock Arrangement. The panel shall be properly gasketed to prevent ingress of dust & moisture & remain. Bus bar will be properly arranged & all Switches shall be fixed by M.S. nuts & bolts, and also all SFU/SDFU units should be connected with the proper size electrolytic graded tinned Al. Flat Bar / as per direction of E.I.C.
Installing the LT panel in position with the necessary items required and making a brick foundation for levelling up the LT panel such that the incoming cable can be connected in a proper way without stress.
Proper size of panel, length of BBC, construction details, arrangements of all I/C and O/G SFUs and others with drawing should be approved by the EIC before construction of this Panel. | 1 | No | 1,56,300 ₹1.6 L | 1,50,000 ₹1.5 L | 1,24,500 ₹1.2 L | 1,20,000 ₹1.2 L |
| 4.00 | S & F of 415 V, up to 160 A capacity MCCB incomer, 63 A SP/TP MCB outgoing, double door, following ways VTPN MCB DB (Make - Legrand / Siemens) with IP-43 protection on angle iron frame on wall including mending good the damages to original finish, inter connection with suitable size of copper wire & neutral link and provision for earthing attachment. [15/D-11]
4 Way | 1 | Nos | 9,355 ₹9,355 | 8,500 ₹8,500 | 7,000 ₹7,000 | 1,36,000 ₹1.4 L |
| 4.10 | 6 Way | 1 | Nos | 8,841 ₹8,841 | 9,850 ₹9,850 | 9,100 ₹9,100 | 12,000 ₹12,000 |
| 5.00 | S & F of 415 V, 32 A per way following ways double door HTPN MCB Distribution Board with IP-43 protection (Make - Legrand / Siemens), concealed in the wall after cutting the wall & mending well the damages to original finish incl. interconnection with a suitable size of copper wire and neutral link & provision for earthing attachment. [14/D-10]
4 Way | 4 | Nos | 3,089 ₹12,356 | 6,500 ₹26,000 | 2,965 ₹11,860 | 2,908 ₹11,632 |
Tender Value
Refer Docs
EMD Value
₹47,345
Closing Date
23 Mar 2026, 1:00 pmClosed
Executive Engineer
Dist Hospital Campus Saktinagar Krishnagar Nadia
Renovation of Electrical Installation at First Floor of the Administrative Building, Govt. ITI. Kalyani.
2026_WBPWD_1018064_1
WBPWD/EE/NED/NIQ/e-T/69/ (1st Call)25-26
Open Tender
ELECTRICAL WORKS ORG
30 days
Dist Hospital Campus Saktinagar Krishnagar Nadia
Please refer Tender documents.
6 documents required · 6 mandatory
₹47,345
Nadia Electrical Division
29 May 2026
5 Mar 2026
25 Mar 2026
5 Mar 2026
23 Mar 2026
9 Mar 2026
9 Mar 2026
Dismantling the existing electrical accessories like all kinds of old wiring, batten, wooden block, conduit pipe, main switche, net guard, iron clad DB, MCB DB, Bus bar, light fittings, fans, fan clamps, power board, different sizes cable, gland, nail, fastener, damaged panel, incoming & out going cable etc. at working site and deposit the dismantles items at section store with mending good the damages as per direction.
Supply & delivery of cubicle type 415 V, LT distribution panel board of required size, compartmentalised with maple arrangement, having rigid & self-supporting structure fabricated by 2 mm thick CRCA sheet steel with M/S angle/flat frame. The panel board consists of the following switches. Incoming: Switch dis-connector fuse unit in open execution, TPN, 50 HZ, 415 V, 315 Amp with 3 nos. 315 Amp Din type HRC fuse link - 1 no. [Make - Siemens / ABB / Schneider] Bus Section: 415 V, 500 A, electrolytic graded Al. bus bar Ph. & N. (Size of bars - 4 x 80 mm x 6 mm). The bus bar shall be fixed with FRP chairs, and all bars shall be insulated with PVC heat-shrinkable sleeves of suitable size and different colours, as per the norms and directions of E.I.C. All interconnections should be done with appropriately sized aluminium bars. Outgoing: SDFU in open execution TPN 50 HZ, 415 Volt - i) 200 Amp - 1 no., ii) 125 Amp - 4 nos. with Din type HRC fuse link as per rating of each SFUs [Make - Siemens / ABB / Schneider]. All SFUs should be connected with the required size/equivalent rating Al. flat.
Metering, Control & Indication Arrangement :- a) Digital display Multifunction Meter (Make - Siemens / ABB / Schneider) - 1 no. b) CT, 300/5 A (Make - Kappa) - 3 nos. c) Indicating LED lamps for Red/Yellow/Blue (Make - L&T/ABB/Siemens) - 3 nos. d) 6 A SP MCB - 3 nos. e) Danger Board 18 SWG (12" x 8") - 1 no. Cable Alley: Cable entry arrangement will be provided on the back side of the cubicle panel, positioned at the bottom end in a vertical orientation, with a 630 Amp capacity and 4-way extended Al. flat Bar. A flat terminal indicating phase & neutral for each outgoing main switch, including the gland plate, must be placed at the bottom of the panel with a detachable type, as per the direction of E.I.C. Additionally, provide 1 no. Bus Alley in vertical, 2 nos. cable alley. Painting: The complete panel board shall be painted by 2 coats of powder-coated synthetic enamel Paint over two coats of R.O. primer of Approved make, brand & color as per the direction of E.I.C.
Constructional Details: All incoming & outgoing panel-mounted cubical Switch Disconnector fuse shall be housed in a respective compartment with a hinged & gasket Door at the front. All doors shall have a Panel lock Arrangement. The panel shall be properly gasket to prevent ingress of dust & moisture & Remain. Bus bar will be properly arrange & all Switches shall be fixed by M.S. nuts & bolts and also all SFU/SDFU units should be connected with the proper size electrolyting graded tinned Al. flat / Bar / as per direction of E.I.C. Installing the LT panel in position with the necessary items required and making a brick foundation for levelling up the LT panel, such that the incoming cable can be connected in the proper way without stress. Proper size of panel, length of BBC, construction details, arrangements of all I/C and O/G SFUs and others with drawing should be approved by the EIC before construction of this Panel.
Supply & delivery of cubicle type 415 V, LT distribution panel board of required size, compartmentalised with maple arrangement having rigid & self-supporting structure fabricated by 2 mm thick CRCA sheet steel with M/S angle/flat frame. The panel board consists of the following switches. Incoming: i) SDFU in open execution, TPN, 50 HZ, 415 V, 200 Amp with 3 nos. 200 Amp Din type HRC fuse link - 1 no. [Make - Siemens / ABB / Schneider], ii) 415 V, 200 Amp on load front-operated Changeover Switch-Disconnector (Conforms to IEC 60947-3, IS/IEC 60947-3) - 1 no. [Make - LK, Cat. No. - CO22000OOOA or a similar type of Siemens / ABB / Schneider] Bus Section: 415 V, 300 A, electrolytic graded Al. bus bars for Phs. & N. (Size of bars - 4 x 60 mm x 5 mm). The bus bar shall be fixed with FRP chairs, and the entire bars are insulated with PVC heat-shrinkable sleeves of suitable size and different colours, as per the norms and directions of E.I.C. All interconnections should be done with appropriately sized Copper bars. Outgoing: Switch disconnector fuse unit in open execution TPN 50 HZ, 415 Volt - i) 125 Amp - 3 nos.., ii) 63 Amp - 1 no. with Din type HRC fuse link as per rating of each SFUs [Make - Siemens / ABB / Schneider]. All SFUs should be connected with the required size / equivalent rating tinned Cu. flat bar.
Metering, Control & Indication Arrangement :- a) Digital display Multifunction Meter (Make: Siemens / ABB / Schneider) - 1 no. b) CT, 200/5 A, Make - Kappa - 3 nos. c) Indicating LED lamps for Red/Yellow/Blue (Make - Schneider/ABB/Siemens) - 3 nos. d) 6 A SP MCB - 3 nos. e) Danger Board 16 SWG (6" x 4") - 1 no. Cable Alley: Cable entry arrangement will be provided in the back side of the cubical panel in the bottom end vertical position, 630 Amp capacity 4-way extended Cu. flat terminal indicating phase & neutral for each outgoing main switches including gland plate must be placed at the bottom of the panel with detachable type as per direction of E.I.C. and also to be provided 1 no Bus Alley in vertical, 2 nos. cable alley. Painting: The complete panel board shall be painted by 2 coats of powder-coated synthetic enamel Paint over two coats of R.O. primer of Approved make & brand & color as per Direction of E.I.C.
Constructional Details: All incoming & outgoing panel-mounted cubical switch disconnector fuses shall be housed in a respective compartment with a hinged & gasketed door at the front. All doors shall have a Panel lock Arrangement. The panel shall be properly gasketed to prevent ingress of dust & moisture & remain. Bus bar will be properly arranged & all Switches shall be fixed by M.S. nuts & bolts, and also all SFU/SDFU units should be connected with the proper size electrolytic graded tinned Al. Flat Bar / as per direction of E.I.C. Installing the LT panel in position with the necessary items required and making a brick foundation for levelling up the LT panel such that the incoming cable can be connected in a proper way without stress. Proper size of panel, length of BBC, construction details, arrangements of all I/C and O/G SFUs and others with drawing should be approved by the EIC before construction of this Panel.
S & F of 415 V, up to 160 A capacity MCCB incomer, 63 A SP/TP MCB outgoing, double door, following ways VTPN MCB DB (Make - Legrand / Siemens) with IP-43 protection on angle iron frame on wall including mending good the damages to original finish, inter connection with suitable size of copper wire & neutral link and provision for earthing attachment. [15/D-11] 4 Way
S & F of 415 V, 32 A per way following ways double door HTPN MCB Distribution Board with IP-43 protection (Make - Legrand / Siemens), concealed in the wall after cutting the wall & mending well the damages to original finish incl. interconnection with a suitable size of copper wire and neutral link & provision for earthing attachment. [14/D-10] 4 Way
S & F of 240 V, 6 to16 A per way 2+10 Way double-door SPN MCB Distribution Board (Make - Legrand / Siemens) with IP-43 protection, concealed in wall after cutting the wall & mending good the damages to original finish incl. inter connection with suitable size of copper wire and neutral link & provision for earthing attachment. [13/D-10]
S & F of single door 240 V, 4 way SP MCB SS enclosure (powder coated) with IP-30 protection (Make - Legrand / Siemens), concealed in the wall after cutting the wall & mending the damages to the original finish incl. painting, connection & provision for earthing attachment. [11/D-9]
S & F of single door 240 V, 2 way SP MCB SS enclosure (powder coated) with IP-30 protection (Make - Legrand / Siemens), concealed in the wall after cutting the wall & mending the damages to the original finish incl. painting, connection & provision for earthing attachment. [11/D-9]
Supplying and fixing double door sheet steel (16 SWG), powder coated cable end box for horizontal / vertical TPN DB enclosure with IP-43 protection, on angle iron frame on wall & mending good the damages to original finish with nuts bolts etc incl. provision for earthing attachment. [16/D-12]. i) for 6 way HTPN MCB DB
ii) for 4/6 way VTPN MCB DB
Supply, delivery & installation of 240 V, 12-way, double door, SS enclosure, powder coated, IP-43 protection MCB DB as a Timer DB with neutral bar, Din Rail comprising with 1 no. 20/25 A DP MCB ('C' Curve, 10 kA,), 1 no. 24-hour digital Time Switch, 1 no. 20/25 A 2 pole contactor (Make - ABB / Schneider / Legrand) with internal wiring by 2.5/4/6 sq. mm single core stranded 'FR' PVC insulated & unsheathed copper wire (Make - Finolex / Havells / RR Kabel) including 1 no. Auto Manual bypass Toggle Switch, provision for earthing attachment, LED indication lights on the on-off condition. (For Compound Light /RAC)
Supply and delivery of the following sizes: 1.1 kV Gr., 3/4 Core, XLPE insulated & sheathed, armoured, Aluminium Conductor Cable (Make - Havells / Finolex / RR Kabel). 3 core 10 sq. mm cable
4 core 70 sq. mm cable
4 core 95 sq. mm cable
4 core 120 sq. mm cable
Supplying & fixing medium gauge GI pipe (ISI medium - Jindal/Bansal/Tata) protection with necessary fittings and jointing materials as required (Zindal / Bansol) 40 mm dia [11(c)/F-6]
50 mm dia [11(d)/F-6]
65 mm dia [11(e)/F-6]
Charges for cutting of Pitch Road (100 mm wide and 150 mm depth) for installation of GI Pipe and mending the damages to the original finish, incl. removing the rubbish
Boring (Micro Tunnelling) below the Pacca/Concrete Road with necessary tools & tackles for installation of GI pipe, including filling the vacant space between pipe and road with soil and mending the damages as per direction of EIC.
S & F of perforated 300 mm x 50 mm x 1.25 mm (18 SWG) GI cable tray with perforation not more than 17.5% suspended from ceiling incl. S&F GI connector, 6 mm dia MS suspender, bolts & nuts, steel fastener etc. as required incl. Al painting (two coats) of MS support with 25 mm x 25 mm x 3 mm angle iron support. [34(a)(ii)/D-14]
Laying of following sizes Ar. Al. the cable on wall/surface incl. S & F MS saddles/clamps with earthing attachment in 2 x 10 SWG GI (Hot-Dip) wire, making holes etc. as necy. mending good damages and painting - 3 core 10 sq. mm cable [2(b)/F-1]
4 core 70/95 sq. mm cable [2(d)/F-1]
4 core 120 sq. mm cable [2(e)/F-1]
Laying of 3/4 core cable as below, after cutting floor/ pavement/wall and making holes, including embedding the cable at an average depth as below and mending the damages to the original finish, incl. removing the rubbish ----- 10 sq. mm at an average depth of 75 mm in floor / pavement / wall etc. [5(i)/F-3]
Laying of 4 core 70/95/120 sq. mm cable through existing GI Pipe/open masonry trench. [3(b)/F-1]
Laying of two nos. 4 core 95/120 sq. mm cable in an underground trench in single tier formation (horizontal), the trench size: 680 mm x 760 mm average depth, with brick protection on the top of each cable [8 (eight) nos. bricks per Mtr. and 4 (four) nos. bricks per Mtr. as a separator between the bricks and cables], and also trench to be filled up with shifted soil, leveling up, restoring surface duly rammed. 2(b/F-2 ]
Laying of 4 core 70/95/120 sq. mm cable on existing Cable Tray and binding with suitable size GI wire. [6(ii)/F-3]
Supplying and fixing compression type gland complete with brass gland, brass ring, rubber ring for dust & moisture proof entry of following XLPE/PVÇ insulated armoured Cables as below: 3 core 10 sq. mm cable [7(b)/F-4]
4 core 70 sq. mm cable [7(c)/F-4]
4 core 95 sq. mm cable [7(c)/F-4]
4 core 120 sq. mm cable [7(c)/F-4]
Finishing the end of following XLPE/PVC armoured cables by cimping method incl. supplying and fixing solder less socket (Dowels make), tapes, anticorrosive paste & jointing materials. [8(b)/F-5] 3 core 10 sq. mm cable
4 core 70 sq. mm cable
4 core 95 sq. mm cable
4 core 120 sq. mm cable.
S & F of 415 V, FP MCCB (Make - Legrand / Siemens) of breaking capacity 36 kA with adjustable thermal and fixed magnetic setting in VTPN DB and necessary connection. [10/D-8] 100 A
S & F of 240/415 V, DP/FP MCB type Isolator (Make - Legrand / Siemens) on din rail of SPN/HTPN DB and necessary connection. [6/D-5] 240 V, 32 A DP
S & F of 240/415 V, SP/DP/TP MCB of Breaking capacity 10 kA & 'C' - characteristics (Make - Legrand / Siemens) on din rail of VTPN DBs and necessary connection. [7/D-6] 240 V, 6 to 32 A SP MCB
240 V, 32 A DP MCB
415 V, 32 A TP MCB
415 V, 32 A FP MCB
415 V, 63 A FP MCB
Distribution wiring in 1.1 KV grade 3 x 1.5 sq. mm single core stranded 'FR' PVC insulated & unsheathed copper wire (Make - Finolex / Havells / RR Kabel) partly in 20 mm size MMS PVC rigid conduit 'FR' (Precision make) [for ceiling portion only] and in 19 mm bore, 3 mm thick polythene pipe [for horizontal & vertical run embedded in wall] to light/fan/call bell points with Switch (Anchor) fixed on MS CRC sheet metal (16 SWG) switchboard on wall complete with 3 nos. suitable sizes “Ph, N & E” copper bars incl. bakelite top cover (3 mm thick) incl. 175 mm x 100 mm x 65 mm inspection box, making earthing attachment, painting the MS box and mending the damages to the original finish (only PVC Rigid Conduit on the ceiling and the remaining portion concealed). Average run - 8 Mtr. [5(c)/E-15]
Distribution wiring in 1.1 KV grade 3 x 1.5 sq. mm single core stranded 'FR' PVC insulated & unsheathed copper wire (Make - Finolex / Havells / RR Kabel) to 6 A flush type plug socket & switch (Anchor) fixed on MS CRC sheet metal (16 SWG) switchboard cum JB on wall incl. bakelite top cover (3 mm thick) incl. painting the MS box, mending good the damages to original finish. On Board - [4a(i)/E- 15]
Supplying & fixing socket and step type electronic Fan Regulator (Anchor make) on existing sheet metal switchboard with bakelite top cover by screws after making housing for regulator knob by cutting bakelite top cover including making necessary connections etc. [18(a) /E-6]
S & F of MS fan clamp of two piece type for RC ceiling as per approved specification, fabricated from 40 mm x 9 mm MS flat including making good damages to building roof with satisfactory finishing and painting – (As per Drawing no. 475 of PWD Specification Book – May 1991). [29/D-14]
Supply & Fixing 240 V, 6 A plug socket with separate 6 A switch (Anchor) on sheet metal switchboard embedded in wall, incl. S & F 150 mm x 100 mm x 65 mm MS (16 SWG) switchboard and bakelite/perspex top cover of 3 mm thick by brass screws after making housing for switch by cutting bakelite/ perspex cover and making necessary connections as required. (21/E-6)
S & F of 240 V, 6 A plug socket - 2 nos. with separate 6 A switch (Anchor) - 2 nos. on SM switchboard embedded in wall incl. S & F 175 mm x 100 mm x 65 mm MS (16 SWG) switchboard and bakelite top cover of 3 mm thick by brass screws after making housing for switch by cutting bakelite cover and making necessary connections as required. [10(b)/E-4] & [14(a),15(a)/E-5]
S & F of 240 V, 20 A plug socket with separate 20 A Piano key type switch (Anchor) on sheet metal switchboard embedded in wall incl. S & F 150 mm x 100 mm x 65 mm MS (16 SWG) switchboard and bakelite top cover of 3 mm thick by brass screws after making housing for switch by cutting bakelite cover and making necessary connections as required. E-6/22)
S & F of 240 V, 3 nos. 6 A & 1 no. 20 A plug socket with separate 3 nos. 6 A & 1 no. 20 A switch with indicator & 16 A kit-kat fuse unit (Anchor) on sheet metal switchboard embedded in wall incl. S&F of 240 mm X 200 mm X 65 mm MS (16 SWG) switchboard and bakelite top cover of 3 mm. thick by brass screw and making necessary connection as required. E-7/25
Supply & Fixing 240 V, 20 A Socket (Anchor) on sheet metal switchboard incl. S & F 100 mm x 100 mm x 65 mm MS (16 SWG) switchboard and bakelite top cover of 3 mm thick by brass screws after making housing for switch by cutting bakelite cover and making necessary connections as required. [17(b)/E-6]
Supply & Fixing 240 V, 25 A, Modular type starter (Make - ABB/Legrand/ Schneider) with 25 A Modular switch type SP MCB (C-Curve) and 4 Module GI Modular type switchboard with 4 Module top cover plate flush in wall incl. S&F switchboard and cover plate and making necy. connections with PVC Cu wire and earth continuity wire etc. [17/E-19].
Cutting Channel of 40 mm x 40 mm on masonry wall by electrically operated cutting machine incl. S & F 19 mm dia 3 mm thick heavy gauge polythene pipe using anchoring chemical (Hilti/Sika), GI 'U' hooks of 8 SWG, 18 SWG GI wire as fish wire and mending good damages to original finish by using own tools and tackles. [6(a)/E-3 ]
Cutting Channel of 43 mm x 43 mm on masonry wall by electrically operated cutting machine incl. S & F 25 mm dia 3 mm thick heavy gauge polythene pipe using anchoring chemical (Hilti/Sika), GI 'U' hooks of 8 SWG, 18 SWG GI wire as fish wire and mending good damages to original finish by using own tools and tackles. [6(b)/E-3 ]
S & F of sheet metal inspection box (16 SWG) of the following sizes flushed in wall by housing the same after cutting brick wall incl. making earthing attachment, painting and mending good damages to building works. 100 mm x 100 mm x 65 mm [11(a)/E-4]
150 mm x 100 mm x 65 mm [11(b)/E-4]
175 mm x 100 mm x 65 mm [11(c)/E-4]
S & F of PVC Rigid Conduit 'FR' [Precision Make] on wall, ceiling with saddles and other accessories as required and mending good damages to building works. [7/E-16] 20 mm size
25 mm size
Making 25 mm dia holes on 125 mm depth RCC ceiling. [9(a)/E-3]
Excavation of soil for installation of Earth Electrode and filling & ramming for soft soil. [1(a)/G-1]
Earthing with 50 mm dia GI pipe (Tata Medium), 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level. [2(a)/G-1]
S & F of earth bus bar of galvanized (Hot Dip) MS flat 40 mm x 6 mm on wall having clearance of 6 mm from wall including providing drilled holes on the bus bar complete with GI bolts, nuts, washers, spacing insulators etc. as required. [4(b)/G-2]
Connecting the equipment body to the earth bus bar, including S&F 25 mm x 6 mm galvanised (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipment incl. drilling holes, with bolts, nuts, washers etc. [5(d)/G-3]
Supplying and Drawing of 1.1 KV Gr. single core stranded 'FR' PVC insulated & unsheathed stranded copper wire (Make - Finolex/ RR Kabel/ Havells) of the following sizes in the pre-laid polythene pipe as per GS. 3 x 1.5 sq. mm [1(b)/E-9]
2 x 2.5 sq. mm + 1 x 1.5 sq. mm [1(s)/E-9]
2 x 4 sq. mm + 1 x 2.5 sq. mm [1(v)/E-9]
2 x 6 sq. mm + 1 x 4 sq. mm [1(y)/E-9]
4 x 10 sq. mm + 2 x 4 sq. mm [1(d1)/E-9]
4 x 16 sq. mm + 2 x 10 sq. mm [1(g1)/E-9]
S & F of bakelite / perspex top cover on existing inspection box by Brass screws- 100 mm x 100 mm x 65 mm [13(a)/E-5]
150 mm x 100 mm x 65 mm [13(b)/E-5]
175 mm x 100 mm x 65 mm [13(c)/E-5]
Finishing of the following PVC insulated wire ends by socketting with pin/ring type copper sockets and insulated tapes etc., including supplying sockets, tapes. [9/F-5] 2 x 2.5 sq. mm + 1 x 1.5 sq. mm
2 x 4 sq. mm + 1 x 2.5 sq. mm
2 x 6 sq. mm + 1 x 4 sq. mm
4 x 16 sq. mm + 2 x 10 sq. mm
Supply of 240 V, 48 " (1200 mm) sweep A.C. Ceiling Fan complete with all accessories without regulator and down rod (Make - Crompton, HIGH SPEED (HS) / Orient New Breeze).
Supply of 240 V, 56 " (1400 mm) sweep A.C. Ceiling Fan complete with all accessories without regulator and down rod (Make - Crompton, HIGH SPEED (HS) / Orient New Breeze).
Supply of 240 V, 18" (450 mm) dia whole metal body and metal blade (4-blade) wall bracket fan (Make - EPC Electrical Pvt. Ltd/ Crompton Strom-SS.). NS
Supply of 240 V, 18" (450 mm) dia whole metal body and metal blade (4 blade) Air-Circulator Pedestal Fan complete with all accessories such as Regulator, Cord and 3-pin Top (Make - EPC Electrical Pvt. Ltd., Heavy Duty).
Supply of box type, 4 ft. long, single T-8 LED tube light fittings complete with all accessories [Make - Phillips, Cat No. - TMC 502 P 1 x T-LED 22 W / Wipro, Cat No. WIO921208]. [NS]
Supply of box type, 4 ft. long, double T-8 LED tube light fittings complete with all accessories [Make - Phillips, Cat No. - TMC 502 P 2 x T-LED 22 W / Wipro, Cat No. WIO922208]. [NS]
Supply of 4 ft. long 18/20 Watt, polycarbonate LED T-8 lamp (Make - Philips Master LED tube model no. 18W 865 T8 I 2100 lm / Wipro, Cat No. LL13-181-65SESL]. [NS]
Supply of 240 V, 1420 RPM, 300 mm (12") dia A. C. Exhaust Fan (Make - E.P.C. Electrical Pvt. Ltd., Heavy Duty).
Supply of 240 V, 1370 RPM, 225 mm (9") dia A. C. Exhaust Fan (Make - E.P.C. Electrical Pvt. Ltd., Heavy Duty).
Supplying & Fixing 240 V AC/DC superior type Ding-Dong Call Bell (Anchor) on HW board incl. S&F HW board. [20(a)/D-13].
Fixing only the exhaust fan after making a hole in the wall, making good the damages, and providing a smooth cement finish, as practicable as possible, providing the necessary length of PVC insulated wire and making a connection for the exhaust of the following diameter: [28(b)/C-4] 30cm (12")
S & F aluminium louvre shutter on the wall with necy. bolts & nuts (6 mm dia x 62 mm long) for the following size exhaust fan. [32(a)/D-14] 30 cm (12")
Fixing only cabin fan on wall/ceiling by S&F rag bolts, nuts & washers (6 mm dia x 62 mm long) or as reqd. incl. S&F 24/0.20 PVC insulated flexible copper wire 0.5 mt. length. [29/C-4]
Fixing only the ceiling fan complete with blades, canopy, fork, rubber bush etc. incl. S&F 3x1.5 sq. mm PVC insulated copper wire and making necessary connections as required. [21(a)/C-3]
Fixing only single/twin LED light fitting complete with all accessories directly on wall/ceiling by “Z” type (50 + 25 + 25) mm x 25 mm x 3 mm thick MS clamp whose one side would be fixed on wall/ceiling by 4 nos. fastener & other side with the fitting by 2 nos. nut-bolt and making connection by 3 x 1.5 sq. mm PVC insulated stranded copper wire through the polythene pipe, with mending good damages to original finish incl. S&F the fixing materials. NS
Fixing only single/twin LED light fitting suspended 25 cm bellow the ceiling with 2 nos. 20 mm dia EI conduit (16 SWG) supports fixed with “L” type (65 +75) mm (length) x 25 mm (width) x 3 mm (thick) MS clamp whose one side would be fixed on ceiling with sutable size 4 nos. fastener and other side connected with the conduit with suitable size 4 nos nut-bolt and making connection by 3 x 1.5 sq. mm PVC insulated stranded copper wire through the polythene pipe, mending good damages to original finish incl. S&F the fixing materials, panting etc. as required. NS
S & F additional 2 nos. 20 mm dia EI conduit (16 SWG) supports, PVC insulated stranded copper wire (3 x 1.5 sq. mm through the polythene pipe) & panting etc as required for extra suspension of fitting exceeding 25 cm. NS
Supply & Fixing of 240 V, 12 W B22 CDL LED Lamp incl S&F Batten Holder as required. (Make - Philips / Crompton / Wipro).
Supply of 230/240 V, outdoor-type, minimum 90 Watt, LED, Industrial, street light fitting/luminaire, potted driver, IP 66 protected, minimum luminous efficacy -140 lm/watt, colour temp. - 5700 K with 10 KV SPD (Make - Philips / K-Light / Wipro), complete with all accessories.
S & F of 2 mm thick, stainless steel sheet fabricated, water proof type looping cable box (200 mm x 150 mm x 100 mm deep) comprising of one 240 V, 16 A kit-kat fuse unit, one neutral link, 4 nos. 16 A stud type connectors lined with rubber gasketted hinged top cover, mechanical locking arrangement etc., earthing terminal with lug embedded in wall.
Fixing only outdoor type LED light fitting complete with all accessories to be fixed/projected from the wall of the building by making holes, providing clamping arrangement, S&F 40 mm dia and 1.5 Mtr. long GI pipe (ISI-Medium) having suitable bend, necy. GI reducer, making connections with 3 core 1.5 sq. mm PVC insulated stranded copper cable from loop box, mending good damages to wall incl. painting etc. as required. [18/C-3]
Supplying & Fixing 2ft x 2ft LED fittings (Cat No. - Philips-RC380B LED36S-6500 G6 L60W60 PSU OD S1 / Crompton - LCTLRNE-36-FO-CDL) with necessary connection as required.
Supply & Fixing 240 V, 20 A Piano key type switch (Brand approved by EIC) on sheet metal switch board incl. S & F 100x100x65mm MS (16SWG) switch board and bakelite/perspex top cover of 3mm thick by Brass screws after making housing for switch by cutting bakelite/perspex cover and making necessary connections as required
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_2501835.xls
BOQ • 0.35 MB
form2911.pdf
Tender Documents • 0.50 MB
Download all tender documents and submit your bid