| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 CrAdmitted-Finance | ₹4.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.9 Cr+₹43,397.18 (0.09%)Admitted-Finance | ₹4.9 Cr+₹43,397.18 (0.09%) | L2 | Admitted-Finance |
| 3 | L3₹5.0 Cr+₹8.0 L (1.63%)Admitted-Finance | ₹5.0 Cr+₹8.0 L (1.63%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AAYKAYCONSTRUCTIONS L1 | SABANI ENGINEERS L3 | P. M Abdul kareem L2 |
|---|---|---|---|---|---|---|
| 1.00CIVIL WORKS | ||||||
| 1.01 | 2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 2,000 | sqm | 7.5 ₹15,000 Lowest | 7.5 ₹15,000 Lowest | 7.5 ₹15,000 Lowest |
| 1.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 3,690 | cum | 210 ₹7,74,900 Lowest | 215 ₹7,93,350 | 215 ₹7,93,350 |
| 1.03 | 60.65 : Providing Z steel sheet pile of size 400x185x7.5/8.5 driving down vertically in lines and levels interlocking with adjacent piles with suitable pile driving unit and all accessories including all labour hire charges etc. complete and as per the directions of departmental officers at site. | 300 | sqm | 13,960 ₹41,88,000 Lowest | 14,000 ₹42,00,000 | 14,100 ₹42,30,000 |
| 1.04 | 20.2.4 : Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).500 mm dia piles | 729 | metre | 2,700 ₹19,68,300 | 2,550 ₹18,58,950 Lowest | 2,600 ₹18,95,400 |
| 1.05 | 20.2.5 : Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).600 mm dia piles | 648 | metre | 3,450 ₹22,35,600 Lowest | 3,450 ₹22,35,600 Lowest | 3,450 ₹22,35,600 Lowest |
| 1.06 | od222306/2024_2025 : Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). 700mm dia pile | 135 | metre | 4,750 ₹6,41,250 Lowest | 4,775 ₹6,44,625 | 4,800 ₹6,48,000 |
| 1.07 | 20.9 : Integrity testing of pile using Low Strain / Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in-charge. Note:- The inclusion of the above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata & importance of the project. | 11 | per test | 1,100 ₹12,100 Lowest | 1,150 ₹12,650 | 1,200 ₹13,200 |
| 1.08 | 20.6.2.1 : Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge.Single pile above 50 tonne and upto 100 tonne capacityInitial test | 2 | per test | 75,000 ₹1,50,000 | 71,000 ₹1,42,000 Lowest | 71,150 ₹1,42,300 |
| 1.09 | 20.6.2.2 : Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge.Single pile above 50 tonne and upto 100 tonne capacityRoutine test | 2 | per test | 37,500 ₹75,000 | 36,300 ₹72,600 Lowest | 36,500 ₹73,000 |
Tender Value
₹4.9 Cr
Closing Date
28 Feb 2025, 5:00 pmClosed
BaijuT P
Forest Industries Travancore Limited , Aluva
Construction of Bus station cum Shopping Complex
2025_FITL_737547_1
FIT/CP-69/2024-25
Open Tender
Civil Works - Others
Item Rate
365 days
Kalady Grama Panchayath
Refer Tender Document
8 documents required · 8 mandatory
₹11,800
Exempted
Forest Industries Travancore Limited Thaikkattukar
4 Mar 2025
13 Feb 2025
1 Mar 2025
13 Feb 2025
28 Feb 2025
13 Feb 2025
13 Feb 2025 - 22 Feb 2025
22 Feb 2025
Amount
CIVIL WORKS
2.32 : Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.65 : Providing Z steel sheet pile of size 400x185x7.5/8.5 driving down vertically in lines and levels interlocking with adjacent piles with suitable pile driving unit and all accessories including all labour hire charges etc. complete and as per the directions of departmental officers at site.
20.2.4 : Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).500 mm dia piles
20.2.5 : Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).600 mm dia piles
od222306/2024_2025 : Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). 700mm dia pile
20.6.2.1 : Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge.Single pile above 50 tonne and upto 100 tonne capacityInitial test
20.6.2.2 : Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge.Single pile above 50 tonne and upto 100 tonne capacityRoutine test
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.33.1 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.34.1 : Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum).
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.37.2 : Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All work above plinth level upto floor V level
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
P. M Abdul kareem (BID ID -2123820)
SABANI ENGINEERS (BID ID -2128824)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1183672.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .