| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹8.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹9.0 L+₹15,916.85 (1.80%)Rejected-Finance | ₹9.0 L+₹15,916.85 (1.80%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.2 L+₹32,939.04 (3.72%)Rejected-Finance | ₹9.2 L+₹32,939.04 (3.72%) | L3 | Rejected-Finance L3 |
| 4 | L4₹11.6 L+₹2.8 L (31.1%)Rejected-Finance | ₹11.6 L+₹2.8 L (31.1%) | L4 | Rejected-Finance L4 |
| 5 | L5₹11.7 L+₹2.9 L (32.5%)Rejected-Finance HIMACHAL PRADESH HP | ₹11.7 L+₹2.9 L (32.5%) | L5 | Rejected-Finance L5 |
Tender Value
₹11.1 L
EMD Value
₹22,200
Closing Date
8 Aug 2026, 10:00 amClosed
EXECUTIVE ENGINEER HPPWD DIVISION SANGRAH
EXECUTIVE ENGINEER HPPWD DIVISION SANGRAH
Restoration of Rain Damages on link road from Shillahan to Hudiyari Bharmash Dolna Korag km. 0/00 to 4/500 (SH C/O PCC Breast Wall from RD. 0/330 to 0/400).
2026_PWD_140288_9
SANGRAH 3414-38 DATED 30.07.2026
Open Tender
Civil Works
Percentage
90 days
SANGRAH
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
₹22,200
18 Aug 2026
31 Jul 2026
8 Aug 2026
31 Jul 2026
8 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excatation in soil in hilly area in all depths using manual means as per drawing and technical specification ministry of Rural Development for rural roads August 2004 (Two thousands four) clause 305.1 (three hundred five point one) including setting out, coustruction of shoring and bracing, removal of stumps and other deleterious materials including dressing of sides and bottom and back filling in trenches with excavated suitable materials and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials by all modes of transportations in all leads and lifts at specified places in specified manner, systematically with level consideration to avoiding a diverse effects on environment, trimming filling of uneverness blind age and finishing of the road to specified dimension or as directed by the Engineer-in-charge. any loss to the public or private property during the course of excavation shall be the whole responsibility of the contractor which shall have to be duly compensated by him at his on cost in all cases including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. | 84 | PerCum | 389.8 | ₹32,743.2 |
| 2 | Excavation in foundation,trenches etc. in earth work in all heights and depths in all kinds of soil, including saturated soil comprising of pick work,jumper work and blasting work both in soft and hard rock with chiselling and wedging out of rock (where blasting is prohibited) and their intermediate classification of soil including dewatering where ever required,setting out to required lines,levels as shown on the drawings and as directed by the Engineer-in-Charge at site, according to the HPPWD specification of 1990-Volume-I, and shorting out useful and un-useful materials and stacking the same in all leads,lifts and transportations of the usefull materials for filling in roadways embankments for grades improvements and levelling to required grades and then disposing of surplus excavated earth in acquired width of road on or approved dumping sites through all modes of transpsportation including head load animal load or mechanical means alongwith its levelling fine dressing and all labour, mechnieries materials,tools,equipments and incidental necessary to complete the work by mechanized means and labouor(if any required).All useful materials such as stone single, aggregate and slates shall be sorted out and stacked along road side to the maximuim possible extends in all leads,lifts through all modes of transportation and all others incidental charges any loss to the public and private properities during the course of execution and disposal of serviceable and un-serviceable materials shall be the absolute responsibility of the contractors and shall have to be duly compensated by him in all respect including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. | 32.2 | PerCum | 573 | ₹18,450.6 |
| 3 | Providing concrete for plain/reinforced concrete in open foundation complete as per drawing and technical specification clause 802,803,1202 and 1203 1:4:8 (One Cement : Four Sand: Eight Graded Stone aggregate) 40mm (Forty milimetre) and curing complete including cost of form work and hauling/ carriage of all labour equipments and materials to various locations through all modes of transportations in all leads and lifts to the entire satisfaction as per direction of Engineer- in-Charge . | 167.3 | PerCum | 5,825.9 | ₹9,74,673.07 |
| 4 | Providing weep holes in brick masonry/stone masonery plain/reinforced concrete abutment wing wall ruturn wall with 100mm dia pvc pipe extending throught the full width of the structure with slopes of i(V):20(H) towards drawing face complete as per drawing and technical specification clause 614,709,1204.3.7 . including haulaging/ carriage of all labours, equipments and materials to various locations through all mode of transportations in all leads, lifts to the entire satisfaction and direction of the Engineer- in - Charge. | 120 | Each | 306 | ₹36,720 |
| 5 | Hiring of excavator-cum-loader for removal of land slide, slip clearance including cutting and trimming of slops and disposal of cut materials of all kinds of soil with minimum capacity 18 to 25.00 cum/ per hour & minimum 6 hours per day including services of operating staff as required including full time chowkidar for guarding the machine, POL charges & maintenance. Any loss or damage causes to machinary during transit or at site of work shall be borne by the contractor at his own cost. Any type of damage to private and Govt. property is the whole rsponsibility of the contractor. No breakdown will be included in hire charges due to any kind of hinderance.The work shall be executed as per the HP.PWD specifications within all leads,lifts and carriage of materials as per the entire satisfaction & direction of the Engineer-in-charge. | 45 | Per Hour | 950 | ₹42,750 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.66 MB
BOQ_208079.xls
BOQ • 0.28 MB
SBD.pdf
Tender Documents • 3.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .