| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Finance | ₹3.7 L | L1 | Admitted-Finance |
| 2 | L2₹5.0 LAdmitted-Finance | ₹5.0 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JAIMAN Construction and Consultants LLP L1 | Apensia consultancy services LLP L2 |
|---|---|---|---|---|---|
| 1.01 | Consultancy services for Stage-5 (Pre-Opening) Road Safety Audit with detailed Reports for under construction ROB and nearby RUB/ LHS work with approaches and service roads at above location, including all ancillary works as per scope of work mentioned in term of reference (TOR) and bid document attached.
Major head of the works includes
(1) Detailed road safety audit covering review of design and traffic movement plan after traffic studies including past studies, current pattern and possible changes in traffic flow, site inspection (Day and night time inspections including Wet-Weather Simulation) and analysis of road safety features, focusing on aspects like road and bridge geometrics, drainage, lighting, signage with traffic and pedestrian safety.
(2) Review of traffic movement plans, traffic lighting plan, road marking and road furniture layout and safety aspects of traffic merging/turning at various location related with the project area, including submission of suggestive drawings for the same, as per available space and structure constructed already, incorporating recommendations given by various Committee during execution of project.
(3) Submission of comprehensive report (with sketch and drawings) with geo-tagged photographs and chainage-wise observations and recommendations for safety improvements with prioritizing hazards by risk level using a formal Risk Matrix including Submission of a Decision Tracking Form that allows the client to record their response to each recommendation.
(4) All necessary correction in drawings & design (if required) till completion of work and commecement of traffic through it, as desired by Engineer-in-charge.
(5) All other relevent works as desired and as mentioned in TOR and Bid documents, up to full stisfaction of Engineer in Charge.
(Note:- Payment Schedule shall be as mentioned in Bid Documents.) | 1 | Job | 3,74,000 ₹3.7 L | 4,95,000 ₹5.0 L |
Tender Value
₹4.8 L
EMD Value
₹9,500
Closing Date
25 Feb 2026, 2:00 pmClosed
Executive Engineer PWD Division Hanumangarh
Executive Engineer PWD Division Hanumangarh
Consultancy work for Road Safety Audit (RSA) of ROB Construction at LC-66 in Hanumangarh (Satipura)
2026_CEPWD_540266_1
EEH_NIB_NO_28_Year_2025-26
Open Tender
Consultancy
15 days
Hanumangarh
As Per Tender Document
4 documents required · 4 mandatory
₹500
Executive Engineer PWD Division Hanumangarh
₹9,500
Yes
26 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
25 Feb 2026
19 Feb 2026
Consultancy services for Stage-5 (Pre-Opening) Road Safety Audit with detailed Reports for under construction ROB and nearby RUB/ LHS work with approaches and service roads at above location, including all ancillary works as per scope of work mentioned in term of reference (TOR) and bid document attached. Major head of the works includes (1) Detailed road safety audit covering review of design and traffic movement plan after traffic studies including past studies, current pattern and possible changes in traffic flow, site inspection (Day and night time inspections including Wet-Weather Simulation) and analysis of road safety features, focusing on aspects like road and bridge geometrics, drainage, lighting, signage with traffic and pedestrian safety. (2) Review of traffic movement plans, traffic lighting plan, road marking and road furniture layout and safety aspects of traffic merging/turning at various location related with the project area, including submission of suggestive drawings for the same, as per available space and structure constructed already, incorporating recommendations given by various Committee during execution of project. (3) Submission of comprehensive report (with sketch and drawings) with geo-tagged photographs and chainage-wise observations and recommendations for safety improvements with prioritizing hazards by risk level using a formal Risk Matrix including Submission of a Decision Tracking Form that allows the client to record their response to each recommendation. (4) All necessary correction in drawings & design (if required) till completion of work and commecement of traffic through it, as desired by Engineer-in-charge. (5) All other relevent works as desired and as mentioned in TOR and Bid documents, up to full stisfaction of Engineer in Charge. (Note:- Payment Schedule shall be as mentioned in Bid Documents.)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.01 MB
Agreemenr_RPWA.pdf
Tender Documents • 0.38 MB
BOQ_963210.xls
BOQ • 0.28 MB
General_Condition.pdf
Tender Documents • 0.08 MB
BID_DocLC66.pdf
Tender Documents • 0.15 MB
Cover_page.pdf
Tender Documents • 0.07 MB
Department_Circular.pdf
Tender Documents • 1.66 MB
Download all tender documents and submit your bid