Loading…
Loading…
Tender ID
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
27 May 2026, 11:00 amClosed
Deputy Chief Engineer
Kerala Agro Industries Corporation Limited Kavumbhagom P.O, Thiruvalla.
Constuction of Honda show room at KAIC Thiruvalla
2026_KAIC_851361_1
KAIC/2026-2027/1
Open Tender
Civil Works - Buildings
Item Wise
45 days
Kavumbhagom Thiruvalla
Please refer Tender documents.
5 documents required · 5 mandatory
₹200
₹2,000
Thiruvalla
16 May 2026
16 May 2026
28 May 2026
16 May 2026
27 May 2026
16 May 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF HONDA SHOW ROOM | |||||
| 1.01 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 1,050 | Kg | 5.98 | ₹6,279 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 2.16 | cum | 263.35 | ₹568.84 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 8,109.18 | - |
| 1.04 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cementAll work upto plinth levelConcrete of M25 grade with minimum cement content of 330 kg /cum | 1 | cum | 11,131.56 | ₹11,130.45 |
| 1.05 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 300 | Sqm | 394.74 | ₹1,18,422 |
| 1.06 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 55 | Kg | 114.92 | ₹6,320.6 |
| 1.07 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation
5.0 in superstructure above plinth level up to floor V level in all shapes and sizes in: cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | 6,528.68 | ₹6,522.15 |
| 1.08 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished seamless type tubes | 305.5 | Kg | 216.59 | ₹66,168.25 |
| 1.09 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation
5.0 in superstructure above plinth level up to floor V level in all shapes and sizes in: cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 10,192.57 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
Tendernotice_2.pdf
PDF • 0.21 MB
BOQ_1438492.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .