Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC | L1 | Accepted-AOC in order | |
| 2 | L2₹11.5 L+₹12,390.83 (1.09%)Rejected-AOC | L2 | Rejected-AOC in order | |
| 3 | L3₹11.7 L+₹27,328.98 (2.40%)Rejected-AOC KERALA KL | ALAPPUZHA | KERALA | 688548 | L3 | Rejected-AOC in order |
| Sl No | Description | Qty | Unit | Aji L3 | BINU T L2 | RAMASWAMI.V L1 |
|---|---|---|---|---|---|---|
| 1.00building work | ||||||
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 90 | sqm | 126.07 ₹11,346.3 | 124 ₹11,160 | 123.12 ₹11,080.8 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 46.87 | cum | 337.93 ₹15,837.43 | 333 ₹15,606.38 | 330.03 ₹15,467.19 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9.99 | cum | 7,452.34 ₹74,419.07 | 7,370 ₹73,596.82 | 7,277.99 ₹72,678.01 Lowest |
| 1.00 | OD254337/2025-2026:60.7.1 DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels cost and
conveyance of all materials labour charges etc. | 33.51 | cum | 3,751.55 ₹1,25,699.43 | 3,630 ₹1,21,626.78 Lowest | 3,663.78 ₹1,22,758.61 |
| 1.00 | OD254325/2025-2026:Random rubble masonry in Cement mortar 1:6 (1 cement : 6 coarse sand) with hard
stone in foundation and plinth as per direction of engineer incharge at site. Modified 7.1.1 | 13.08 | cum | 6,315.18 ₹82,621.5 | 6,252 ₹81,794.92 | 6,167.43 ₹80,688.49 Lowest |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.68 | cum | 9,853.39 ₹26,446.5 | 9,756 ₹26,185.1 | 9,622.87 ₹25,827.78 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 4.92 | sqm | 362.77 ₹1,784.83 | 358 ₹1,761.36 | 354.28 ₹1,743.06 Lowest |
| 1.01 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 37.13 | cum | 5,953.13 ₹2,21,027.81 | 5,894 ₹2,18,832.43 | 5,813.85 ₹2,15,856.62 Lowest |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 5.43 | cum | 7,182.14 ₹38,977.47 | 7,110 ₹38,585.97 | 7,014.12 ₹38,065.63 Lowest |
Tender Value
₹12.7 L
EMD Value
₹31,778
Closing Date
3 Nov 2025, 4:00 pmClosed
ASSISTANT ENGINEER
ASSISTANT ENGINEER O/O Assistant Engineer LID EW section Pothencode
Annual Plan-151/26-Construction of Kochaalumood Anganawadi-POTHENCODE GP-General Civil Work
2025_LSGD_815591_1
07/TEND/AE/LIDEW/PCD/25-26
Open Tender
Civil Works - Roads
Item Rate
270 days
POTHENCODE
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹31,778
Yes
12 Nov 2025
27 Oct 2025
4 Nov 2025
27 Oct 2025
3 Nov 2025
27 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
151sbd.pdf
Tender Documents • 3.37 MB
BOQ_1365423.xls
BOQ • 0.31 MB
151viewnit.pdf
Tender Documents • 0.03 MB
Tender7.rar
Other Document • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .