| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L6₹46.1 L+₹4.8 L (11.6%)Accepted-AOC | L6 | Accepted-AOC Being valid bonafide reason | |
| 2 | L1₹41.3 LRejected-Finance WZ 1391 31 B NANGAL RAYA NEW DELHI 110046 | NEW DELHI | NEW DELHI | DELHI | 110046 | L1 | Rejected-Finance Rejected due to rates quoted below minimum wages | |
| 3 | L2₹44.7 L+₹3.4 L (8.33%)Rejected-Finance | L2 | Rejected-Finance Rejected due to rates quoted below minimum wages | |
| 4 | L3₹46.1 L+₹4.8 L (11.6%)Rejected-Finance 195 MAHESH NAGAR AMBALA CANTT 133001 | AMBALA | HARYANA | 133001 | L3 | Rejected-Finance Rejected due to rates quoted below minimum wages | |
| 5 | L4₹46.1 L+₹4.8 L (11.6%)Rejected-Finance | L4 | Rejected-Finance Rejected due to rates quoted below minimum wages |
Tender Value
₹47.4 L
EMD Value
₹94,880
Closing Date
1 Apr 2020, 6:00 pmClosed
GE UTILITY AMBALA CANTT
GE UTILITY AMBALA CANTT PIN-133001
MANNING AND OPERATION OF WATER SUPPLY INSTALLATION IN SECTOR A UNDER GE UTILITY AMBALA CANTT
2020_MES_318941_2
GE(U)/AMB-55/2019-20
Open Tender
Civil Works
Item Rate
330 days
GE UTILITY AMBALA CANTT
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE UTILITY AMBALA CANTT
₹94,880
Yes
9 Apr 2020
21 Mar 2020
3 Apr 2020
21 Mar 2020
1 Apr 2020
26 Mar 2020
21 Mar 2020 - 25 Mar 2020
Amount
SCHEDULE 'A' (SECTION-I) Manning and Operation of complete water supply System By Technically qualified Teams for round the clock ( 01 FGM Skilled per shift of 8 hrs) including Sunday and Holidays .The installation comprises of 50 HP submersible pump set and DG set 50 KVA and electric control panel etc. at TW-23 Sec A Area complete all as specified and directed by Eng-in-Charge. The scope of work primarily comprises of :-
(a) Running of pump set and to fill connected over head tanks complete round the clock all as directed by Engr -in-charge otherwise a panelty of Rs 500/- per day will be imposed for not running pump sets without any fault or over running the pump set resulting in overflow of OHT and wastage of water.
(b) Operation of chloronome plants.Contractor will be responsible for proper chlorination of water i.e 2 ppm at installation and maintain the register of daily results otherwise a panelty of Rs 250/- per day will be imposed for non operation of chloronome plants and Rs 350/- per day penalty will be imposed for not maintaining the results of 2.00 ppm at installation.
(c ) Minor repair Such as gland packing ,Nut Bolts if reqd at site otherwise a panelty of Rs 100/- per day will be imposed for not providing gland packing/ leakage of valves within the installation.
(d) Rectifying any electric complaints within the installation which is essential to run installation will be carried out by the contractor otherwise a panelty of Rs 500/- per day will be imposed for not rectifying the electric complaints within the installation.
(e) The contractor will submit Log Sheet of pump set, generator and chloronome plant per month to Engr-in -Charge. In case of non submission of log sheets a panelty of Rs 250/- per day will be imposed.
(f) Area of installation will be Kept neat & clean by removing growth of vegetation ,grass and bushes at of installation, at the path of installation and upto whole installation .Suitable endorsement for this will be made daily in a register kept at installation.Panel recovery at the rate of Rs 250/- per day will be recovered in case of installation and surrounding area found unsatisfactory.
(g) Proper accounting and security of Govt Assets. Any loss will be made good by the contractor. All the pumpsets installed in pump house will be sole responsibility of the contractor.Any damage or loss of the govt property will be made good by the contractor.
(h) All type of Stationary ,T&P for maintenance & operation will be provided by contractor .
(j) All safety provision contained in IE rules will be followed by the contractor.
Description all as per srl item No 1.00 here In before but 40 HP Submersible Pump set and DG set 50 KVA at TW -20 Sec B area complete all as specified and directed by Engr-in-Charge.(Note- Execution of this item will be considered in B Sect)
Description all as per srl item No 1.00 here In before but in centrifugal pump sets and Generating set at Booster Alfa-1 Zonal sump instt booster of Sec A Area complete all as specified and directed by Engr-in-Charge.
Description all as per srl item No 1.00 here In before but in centrifugal pump sets and Generating set at Booster Alfa-2 Panipat line Zonal sump booster of Sec A Area complete all as specified and directed by Engr-in-Charge.
Manning and operation of water supply distribution system by technically qualified teams for round the clock including Sunday and holidays for OHT No.5, 6, 8, 11, 32, 33, 38, 40, swimming pool of sector A and their dependent area by controlling of sluice valves in the area the contractor will deploy 01 Skilled person per shift round the clock (03 person daily) will be deployed by the contractor. The scope of work comprises of :-
a) M & O of sluice valve and regulation of drinking water. Rs.200 per OHT per shift will be imposed for non opening the sluice valve and non supply of water.
b) Cleaning of valve pit. Rs.100 will be imposed for not cleaning of valve pit, a register will be maintained for the same.
c) Minor repair such as gland packing, tightening of nut bolts etc if required Rs.100 will be imposed for leaking of valve.
d) Area of installation below and upto 3 mtr surrounding over head tank , its path Rs.250 per overhead per day will be charged .will be kept neat & clean
e) Log sheet to be maint and submitted at the month end for Panelty of Rs.200
f) Proper accounting and security of Govt assests.
g) All type of stationary by contractor.
h) All safety provn to be maint by cont.
Note- (a) The Contractor shall qoute his rates not less than minimum wages as applicable including all taxes, ESI, contractor's profit etc. In this connection please refer Note 20 of Sch A/BoQ Notes mentioned in tender documents.
Rates required to be quoted for executing the work as described in Item Srl.No. 01 to 05 here-in-before:-
Worker's wage per person (Minimum Rs. 700.00 per day )
Employees state insurance as per existing rules @ 3.25% on Rs. 700.00
Contribution of Bonus @ 8.33 % on Rs. 700.00
GST as per existing rules @ 18 % on Srl No 7.00 to 9.00
LWC as per existing rules @ 1 % on Srl No 7.00 to 10.00
Over head & profit on Srl No 7.00 to 11.00
NOTE No 1 :- (i) Contractor is required to quote upto two digits after decimal place or otherwise it will be considered by rounding off to two digits after decimal place. (ii) 'NIL' or 'Zero' quoting against OH & Profit will be treated as 'Non-bonafide'. (ii) In case two or more firms quote the same rates, the preference will be given to the firm based on the past records and factors like Class of contractor, financial soundness, work experience for last two years etc. (iv) The rate quoted shall not be less than minimum wages as notified by Government of India / State Government / Local body whichever is higher including all statutory provisions such as EPF,ESIC,Bonus, taxes etc as applicable. In case the rates quoted are less than the minimum wages as notified by the Government of India / State Government / Local body whichever is higher including all statutory provisions such as EPF,ESIC, Bonus,taxes etc as applicable, his tender will be treated as non bonafide and will not be considered for Acceptance. In such case, the lowest tender shall be determined by the lowest amount amongst valid/bonafide bids only .
(v) Any increase in minimum wages of labour as fixed by the Govt of India/ State Gove/Union Territory, whichever is higher shall be paid to the contractor as difference between the wages as on last date of bid submission and the increased minimum wages as mentioned here-in-before. Increased wages including all other benefits in compliance of statutory provisions shall be paid to the workers by the contractor. No other claim whatsoever shall be admissible on this account and the bidders shall note this aspect and quote their rates accordingly. It must be noted that in compliance of the statutory provisions, the increase will be passed over to the workers. (vi) The Firm's claims in bills regarding ESI, EPF, Service Tax should be accompanied by documentary proof pertaining to the previous month's bill. A requisite portion of the bill i.e RAR / final bill amount shall be held up till such proof is furnished, at the discretion of the Accepting Officer.
(vii) The firm shall submit proof of payment given to workers and endorse a copy to Engineer-in-charge, showing the details of payments, deductions (including all statutory deductions) & net amount with requisite challans in each case/person indicating PF number, ESI card detail etc.
( viii) Engineer-in-Charge will maintain the record of attendence in respect of the persons deployed by the Firm on the basis of which wages/ remuneration will be decided in respect of the person at the approved and agreed rates. The firm shall be responsible to keep all records of payment, attendence, leaves etc. duly signed by the Engr- in- Charge and endorse a copy of all the documents with RAR/ Final Bill as applicable.
(SCHEDULE 'A' (SECTION-II) Disconnecting all electrical connections from electric motor 25 to 40 HP and decoupling from pump assembly and dismantling from foundation and transporting to local workshop approved by Accepting Officer for opening the motor taking out of burnt winding and thorough cleaning of the slotes, rewinding the complete motor with supper enamaled copper wire of same size and provn of supper quality insulating materials, warnishing and drying and taking back from wksp including laths and other any type of machine work such as rotor work, welding, metalling, machining and grinding for bearing sheet etc and mounting, connecting all electrical connections alongwith reassembling pump set and testing complete all as directed by Engr-in-Charge.
Taking out US Centrifugal pump set of capacity 30HP and deposit to MES Store and supply and fixing new centrifugal pump set including motor as per existing motor and connections, connected items with suitable 3 Phase star delta starter complete set (Motor Horizondal Split casing pump model DSM 100/36 ) including CI connection with CI impeller 40 C8- shaft complete set of capacity 25 to 30 HP including all connected items and foundation allignment all as specified and directed by the Engr in Charge Make- Kirloskar or equivalent
M&L against leakage run lead joints suitable for 80 mm bore CI/DI/GI pipe including jointing meterial such as lead, spun yarn etc complete all as specified and directed by Engineer in charge
Description all as per item No. 15 above but 100mm bore
Description all as per item No. 15 above but 150mm bore
m/s parmod kamar
Raman Electric Trading Co
Micky Traders
M/s badrinath Traders
R N Enterprises
POWER ELECTRONICS ENGINEERS
MAYANK ENTERPRISES
singh traders
DIAMOND ELECTRICALS
M/s Super Trading Corporation
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .