| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹25.8 L+₹2.0 L (8.34%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹25.8 L+₹2.0 L (8.38%)Rejected-Finance WARD NO 4 NETA NAGAR SULTANPUR PATTI TEHSIL BAZPUR U S NAGAR RAMNAGAR | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | L3 | Rejected-Finance Reject |
Tender Value
₹25.8 L
EMD Value
₹75,000
Closing Date
23 Mar 2023, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Annual Maintenance and Operation work of 33 and 11 KV Substation Deghat under EDD Bhikiyasain
2023_UPCL9_55825_1
EDD(R)-40/2022-23
Open Tender
Electrical Works
Item Rate
365 days
Bhikiyasain
As per Tender Document
3 documents required · 3 mandatory
₹2,360
EDD
₹75,000
25 Sept 2023
3 Mar 2023
24 Mar 2023
3 Mar 2023
23 Mar 2023
3 Mar 2023
Amount
(A) Maintenance and preventive maintenance of 33/11 KV S/s, 33 KV, Genration line 11KV, LT/HT line and ditribution T/f's Replacement of IDF/Mechanical meter 50 per month as per JE/SDO instructions; replacement of damaged distribution T/f's and timely release of new service connections & disconnection work for revenue realisation purpose as per JE/SDO instructions and consumers complaints handling as per UERC supply code 2020 (NOTE-Amount calculated on per day basis will be deducted from total amount for the month if any one or more Skilled/Unskilled persons made available for work/duty, found absent as per JE/SDO Report & attendance register, which will be maintained by the contractor): also, if any panlety of any Solar Plant in imposed on UPCL due the non-maintainance of timely supply, then total panelty amount will be deducted from the monthly bill of the Contractor) (No of Skilled Lineman = 06 Nos) (B) Operation work in shifts (4 Shifts) for operation of 33/11 KV S/s (including contractor's profit)(Note:- Amount calculated on per day basis will be deducted from total amount for the month if any one or more skilled/Unskilled person made available for work/duty, found absent as per JE/SDO Report) (No of S.S.O = 04 Nos)
Description of Work / Item(s)
Amount
Replacement of damaged/rotten or erection of midspan poles (HT/LT) including cartage from S/s Deghat/ESC Masi (NOTE- Amount per pole will be paid as per this rate but amount equal to double the cost of replacement of pole will be deducted from the bill of the month in which complaint of such damaged/rotton pole, recieved)
Replacement of IDF/Mechanical meter 50 per month
R&R of damaged transformer 5% of 150 = 8. Excess damaged transformers will be replaced free of cost by the contractor.
amitrajmanpowersupplier
Gani Engineering and construction company
Gani Engineering and construction company
amitrajmanpowersupplier
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .