Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.2 LAdmitted-Finance | ₹60.2 L | L1 | Admitted-Finance |
| 2 | L2₹60.5 L+₹33,217.52 (0.55%)Admitted-Finance | ₹60.5 L+₹33,217.52 (0.55%) | L2 | Admitted-Finance |
| 3 | L3₹60.9 L+₹69,260.86 (1.15%)Admitted-Finance KARALIKKATTIL HOUSE WANDOOR | WANDOOR | MALAPPURAM | KERALA | ₹60.9 L+₹69,260.86 (1.15%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AKBAR MANCHERRY L1 | MUNEER P P L2 | Noorul Hassan K T L3 |
|---|---|---|---|---|---|---|
| 1.00Second Floor | ||||||
| 1.01 | 15.3
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 9.43 | cum | 3,319.65 ₹31,300.98 Lowest | 3,372.7 ₹31,801.19 | 3,372.7 ₹31,801.19 |
| 1.02 | 5.2.2
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 gradedmstone aggregate 20 mm nominal size derived from natural sources) | 14.29 | cum | 11,731.49 ₹1,67,619.53 Lowest | 11,731.49 ₹1,67,619.53 Lowest | 11,731.49 ₹1,67,619.53 Lowest |
| 1.03 | 5.3
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 84.84 | cum | 12,346.86 ₹10,47,482.91 Lowest | 12,346.86 ₹10,47,482.91 Lowest | 12,346.86 ₹10,47,482.91 Lowest |
| 1.04 | 50.4.1.1
Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc. | 4.2 | cum | 8,394.03 ₹35,254.93 Lowest | 8,394.03 ₹35,254.93 Lowest | 8,394.03 ₹35,254.93 Lowest |
| 1.05 | 5.9.6
Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 213.82 | sqm | 926.37 ₹1,98,076.43 Lowest | 926.37 ₹1,98,076.43 Lowest | 926.37 ₹1,98,076.43 Lowest |
| 1.06 | 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 297.91 | sqm | 700.72 ₹2,08,748.69 Lowest | 700.72 ₹2,08,748.69 Lowest | 700.72 ₹2,08,748.69 Lowest |
| 1.07 | 5.9.3
Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 320.9 | sqm | 882.92 ₹2,83,325.5 Lowest | 882.92 ₹2,83,325.5 Lowest | 882.92 ₹2,83,325.5 Lowest |
| 1.08 | 5.9.16.1
Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 127.4 | metre | 209.54 ₹26,695.4 Lowest | 209.54 ₹26,695.4 Lowest | 209.54 ₹26,695.4 Lowest |
| 1.09 | 5.9.19
Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 71.35 | sqm | 938.67 ₹66,972.23 Lowest | 938.67 ₹66,972.23 Lowest | 938.67 ₹66,972.23 Lowest |
Tender Value
₹75 L
Closing Date
3 Mar 2026, 5:00 pmClosed
Baiju T.P
Forest Industries Travancore Limited , Aluva
Construction of Building
2026_FITL_839446_1
FIT/CP-178/2025-26
Open Tender
Civil Works - Buildings
Item Rate
365 days
Pandikkad
Refer Tender Document
8 documents required · 8 mandatory
₹2,950
Exempted
Forest Industries Travancore Limited
11 Mar 2026
23 Feb 2026
4 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
23 Feb 2026 - 27 Feb 2026
27 Feb 2026
Second Floor
15.3 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 gradedmstone aggregate 20 mm nominal size derived from natural sources)
5.3 Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
50.4.1.1 Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc.
5.9.6 Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.1 Centering and shuttering including strutting, etc. and removal of form for: Edges of slabs and breaks in floors and wallsUnder 20 cm wide
5.9.19 Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges
5.9.7 Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases)
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.7.3 Laterate masonry with neatly dressed laterate stone of size 40x20x15 cm or nearest size in cement mortar 1:6 for superstructure above floor two level upto floor five level including all cost of materials, labour charges etc.
13.4.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
50.13.1 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
22.23.2 Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineerincharge. The product performance shall carry guarantee for 10 years against any leakage.For horizontal surface one coat @1.10 kg per sqm.
10.25.2 Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
10.5.2 Providing and fixing 1 mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer.Using flats 30x6 mm for diagonal braces and central cross piece
10.26.3 Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approves steel primer.G.I. pipes
13.43.1 Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.60.1 Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work
13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
50.18.8.8.1 Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 75 mm pipe 6 Kgf/cm2
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_1414515.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .