Loading…
Loading…
Tender ID
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
2 Mar 2026, 6:00 pmClosed
DEPUTY CITY ENGINEER-3 SOUTH ZONE
Cleaning of water tanks at various water distribution stations and other places in Maninagar ward of South Zone (ARC)
280364
Tn Nt No 18 2025 26 Tn No 920
Open
Miscellaneous Works
Works
Ahmedabad
₹900
Municipal Commissioner, Ahmedabad
₹6,000
26 Feb 2026
26 Feb 2026
26 Feb 2026
2 Mar 2026
26 Feb 2026
Name of work :- Cleaning of water tanks at various water distribution stations and other places in
Maninagar ward of South Zone
I. No. Qty Description Rate Unit Total Amount
I. No. Qty Description Rate Unit Total Amount
Labour charges for cleaning of UGWT sump / GL
cistern including cleaning and removing algae,
calcinations, sludg dirt deposition from bottom and
as well as from wall af container, disinfection by
bleaching powder with all necessary tools and plants,
labours and cost of disfentanc etc complete,
Capacity of sump in Ltrs
2 Conveyance charge of earth murrum, building -
rubbish, manure, garbage, sludge, excavated rock,fly
ash, aggregates of any kind etc.comp
2 a) Lead up to 1 Km. 256.16 Cmt.
2 b) Lead From 1Km to 2 Km. 278.18 Cmt.
2 c) Lead From 2 Km to 3 Km. 296.43 Cmt.
5 d) Lead From 3 Km to 4 Km. 312.45 Cmt.
5 e) Lead From 4 Km to 5 Km. 326.73 Cmt.
3 15837.32 Providing and constructing, Underground (U/G) water 6.50 Litre
tank of specified capacity, on specified location, for
all depths, in controlled CC of M-200 grade with
bottom slab, top slab and RCC walls, including cost of
form work and reinforcement,with inside and outside
plaster in CM 1 :3 and water proofing treatment as
per IWP specification,including injection, grouting,
etc. complete. The rate includes for providing and
fixing two nos. 0.6m. x 0.6 m. size medium duty CI
manhole cover/s at top, including wash out pipe line
and inlet and outlet connections etc. complete.
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Addl.City Engineer
mobile no. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar,
Ahmedabad - 380
Municipal Commissioner invites online Percentage Rate sealed tenders from
interested contractors for the work mentioned below.
1 Name of work દ ણઝોન મ ણનગર વોડમાં આવેલ ુદ ુ દ વોટર ડ ુ ન ટશન
2 Time Limit 12 Months (ચોમાસા િસવાય)
3 Tender Validity Period 120 days from the date of submission of the tender
4 Eligibility Criteria Register “E2” class in PWD in Govt. R&B/CPWD/AMC
orequivalent registration with any other state Govt. or
5 Estimated Cost put to Rs.6,00,00.00
6 Earnest Money Deposit Rs.6,000/-Demand Draft Or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad to be submitted as
prescribed in tender.
7 Security Deposit 5 % of the Tender Amount in form of Bank Guarantee /
Demand Draft in favour of Municipal Commissioner,
Ahmedabad to be submitted as prescribed in tender.
8 Tender fees Rs.900/-Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees
Tender Fees along with Tender as described in the invitation of tender
and submitted to Assistant Manager(South zone), South
zone office, Rambaug, Maninagar Ahmedabad.
10 Tenders issue date Tenders from the amc.nprocure.com website shall be
downloaded from AS PER TENDER NOTICE INVITED
11 Last date of receiving As per Notice inviting Tender / Addendum /
Tenders. Corrigendum.The tenders received after latest schedule
date and time will not be entertained under any
12 Date of Opening As per Notice inviting Tender / Addendum / Corrigendum to
Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South
Zone Office, Opp. Fire Station, Maninagar, Ahmedabad-
13 Mode of sending the Document shall be submitted in sealed envelope systems By
TenderDocuments RPAD/Speed post/ Hand Delivery in sealed covers in
Duplicate ( One Original & One Duplicate) duly sign & seal
by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall
Specification be applicable.
15 Defect &Liability Period The contractor shall be responsible to make good and
remedy at this own exppence any defect which may
developed or may be noticed before the period mentioned
here under from the certified date of complition, The within
15 days of recipts of the notice. In the case of failure on the
part of the contractor, the Engineer incharge may rectfy or
remove or reexecute the work at the risk & cost of the
contractore. The Engineer incharge shall be entitled to
appropriate the whole or any part of the amount of cicurity
deposit towrdes they expences, If any, incurred by him in
rectification, removal or re- execution. The defect liability
period shall be as under (a) for all works costing up to Rs.
50,000 (amount put to tender), the period shall be three
months from the cirtified date of complition. (b) for all
workscosting more than Rs. 50,000 and upto Rs. 1 crore
(Amount put to tender) ,the period shall be six (6) month
from the cirtified date of compition or one monsoon , which
ever letter.(c) the major project costing more than Rs.
crore , the period shall be 12 months from the cirtified date
of complition which should include one monsoon.(d) For
building works , the period specified in (a) ,(b) & (c) above or
elapse of monsoon period following cirtifide date of
complition.,whichever is letter . For the purpose of deciding
the monsoon period, the 30 september may be treated as
16 Compansation for Delay 0.1% per day delay of remaining work after the completion
date but not more than 10% of cost of remaining works.
17 Deduction of Retention Retention @ 2% of the value of work done will be deducted
Money from each RA Bill from each RA bill. It will be released along with release of
payment of Final Bill.
18 Addendum/Corrigendum Addendum/Corrigendum If any Shall be Published 48 Hrs.
Price To the Final Submission Time And Date. The Same
Shall From a part Of Tender And The Same As to be
Attached Along With The Tender Document.
19 For E.P.F. Act. As per Account department circular no.37, date-09/08/2018
& Circular no.27, date-07/01/2026
20 GST As per AMC Finance Department Circular No. 38 dated 21-
11-2022. The Rates are Exclusive of GST. Prevailing GST will
be paid separately.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to
reject any or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl City Engineer
Finance dept. circular No-03 Dt.13-05-14
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent
(1) All Nationalized Banks including the Public Sector Bank-IDBI LTD
(2) Private Sector Banks authorized by RBI to undertake State Government
Business (at present : AXIS Bank, ICICI Bank, HDFC Bank)
(B) Guarantees issued by following Banks will be accepted as SD/EMD for the
period up to March 31,
(1) Commercial Banks :
(1) Kotak Mahindra Bank
(3) IndusInd Bank.
(4) IndusInd Bank
(5) karur Vysya Bank
(7) ING Vysya Bank
(2) Co-Operative Banks of Gujarat
(1) The Kalupur Commercial Co-Operative Bank Ltd.
(2) Rajkot Nagarik Sahakari Bank Ltd.
(3) The Ahmedabad Mercantile Co-Operative Bank Ltd.
(4) The Mehsana Urban Co-Operative Bank Ltd
(5) Nutan Nagrik sahakari Bank Ltd.
Seal and Signature of the Bidder Addl City Engineer
General terms & conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent registration
with any other state Govt. or institutions. Copy of registration should be attached with tender document.
Tenderer who was not registred in AMC must be get registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the correction slips made up to 15-08-1999 may be referred. (only English version) Clause
No. -2 liquidated damages for delay shall be overrule by A.M.C.’s M.C.circular no.- 9 dt. 18/05/2012.
3. In the specification “as directed" / "approved" shall be taken to mean "as directed / "approved"
by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken to
mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards shall be referred
6. All measurement and computations, unless otherwise specified shall be carried out nearest to
the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or thickness shall be
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective materials brought
on site or materials used in the work found defective at a later date. The contractor shall have no claim to
any payment or compensation whatsoever on account of any such materials being rejected by the Engineer
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be removed
from the site of work within 24 hours.
12. All work shall be carried out in a manner as per standard engineering practice.
13. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works & all precautionary measures during execution shall have to be
kept in sufficient numbers and in good working condition at the site of the work. All excavated trench shall
be kept covered with barricade and caution tap.
14. Special modes of the construction not adopted in general Engineering practice, if proposed to be
adopted by the contractor shall be considered only if the contractor provided satisfactory evidence that
such special mode of construction and completion of work to the required strength and quality. Acceptance
of the same by the Engineer in charge shall not however, absolve the contractor from the responsibility of
any adverse effect and concordance of adopting the same in the course of exaction or completion of the
15. The contractor shall be responsible for observing the rules and regulation imposed under the
"Minor Mineral Act", and such other laws and rules prescribed by the Government from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on the work and also
of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required or as per need of AMC.
19. The work in general shall be carried out as per standard specifications of the relevant items to
be executed & as per the instruction of Engineer in charge & as per the guidance of AMC's Consultant for
20. The general terms & conditions of the contract shall be applicable & shall be binding on the
contractor. The contract agreement shall have to be executed between AMC & the agency to which work is
awarded for execution.
21. For Tender amounting below 10 lakh LOI shall be issues within 3 days after received of
sanctioned tender and resolution.Within 10 days contractor has to submit SD and after reciveing SD Work
order shall be issue to contractor and the time limit shall be start from the date of issue of the written work
order to the contractor.
For Tender amounting above 10 lakh LOI shall be issues within 3 days after received of sanctioned
tender and resolution .Within 15 days contractor has to submit SD and after reciveing SD work order shall be
issue to contractor and the time limit shall be start from the date of issue of the written work order to the
Security Deposit of 5% of sanctioned tender amount shall be deposited by pay order /
demand draft / cheque or Bank Guarntee of nationalized bank/scheduled bank only. Contractor
shall have to sign contract paper with AMC.The contractor shall be fined 4% of interest per year
for delay in submission of S.D and shall be deducted from contractor’s bill.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation given by
Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the Contractor.
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as necessary to
fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement, steel or labour shall be
27. Contractor is requested to see the site physically before tendering. He is also requested to quote
the rates keeping in view of all the points mentioned in relevant pages of tender documents.
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped water for
the construction of the works and provide a satisfactory supply of potable water for drinking, washing,
sanitation and cleaning down. The contractor will be responsible for all the costs where applicable of
connection, meter installation, water consumed, water required for testing purposes, disconnection and the
laying, maintenances and ultimate removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the contractor
must make his own arrangements with the Corporation and Electricity Supply Authorities and with other
contractors to connect and to take a supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for purpose of the
work and shall pay such charges as is fixed by the appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the power during the work.
No compensation shall be paid for idle labor staff, machineries and for use of diesel operating sets etc. as
the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility criteria
mentioned above along with the bid. They shall have also to submit the income tax clearance certificate and
solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or materials
advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision what so
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on the
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any respect
will be rejected. Municipal Commissioner reserves the right to increase/decrease the scope of work. No any
claim to that effect shall be entertained. The Municipal Commissioner also reserves the right to reject any or
all the tenders without assigning any reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement after received work order.
Even though in special case, If work is not started because of monsoon or any other special reason
(like site is not available), after evaluation of situation the actual date of starting of work will be consider
after approval of Dy.M.C. (South zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the item or the scope
40. The payment shall be made as per the A.M.C policy for the work done by the contractor.
41. Conditional tenders will not be accepted.
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmadabad Municipal Corporation
13. કો ાકટર ારા ESIC અને EPFO ર શન ગે ના અ. .ુ કોપ . નાણાં ખાતા સર ુ ર નં-
લ ુ બ ESIC અને EPFO
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the latest correction slips may be referred for quality
of construction & standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall
be taken to mean as reference to the latest edition of the same of force on the date
4. In "Mode of measurement" in the specifications wherever a dispute arises in the
absence of specific mention for a particulars point / aspect, the same in the
relevant Indian Standards shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out
nearest to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height
(Depth) or thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or
elucidate in its specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or
AMC's Consultant shall not absolve the contractor from the responsibility of
replacing defective materials brought on site or materials used in the work found
defective at a later date. The contractor shall have no claim to any payment or
compensation whatsoever on account of any such materials being rejected by the
Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all
9. All materials including those of electrical shall be got approved by the Engineer in
charge/ Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant
shall be removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work
as well as for checking lines, levels, alignment of the works & all precautionary
measures during execution shall have to be kept in sufficient numbers and in good
working condition at the site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and
completion of work to the required strength and quality. Acceptance of the same
by the Engineer in charge shall not however, absolve the contractor from the
responsibility of any adverse effect and concordance of adopting the same in the
course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed
under the "Minor Mineral Act", and such other laws and rules prescribed by the
Government from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the
various relevant Indian Standard) shall be taken to engrave the safety of men,
materials and machinery on the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease
looking to the quantum of actual work for which no any claim shall be entertained
17. Contractor shall have to execute extra item if required only after necessary
permission from AMC.
18. The work in general shall be carried out as per standard specifications of the
relevant items to be executed & as per the instruction of Engineer in charge & as
per the guidance of AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be
binding on the contractor. The contract agreement shall have to be executed
between AMC & the agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the
written work order to the contractor after fullfillng the formality life SD &
Agreement. No time extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the
interpretation given by Additional City Engineer /Dy.M.C of A.M.C. will be final
and binding to the Contractor.
22. The contractor shall take no advantage of any apparent error or omission in
drawing or specification and the Engineer -in-charge shall make such corrections
and interpretations as necessary to fulfill the intent of the plants and
specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the
Municipal Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or
labour shall be paid.
26. Contractor is requested to see the site physically before tendering. He is also
requested to quote the rates keeping in view of all the points mentioned in relevant
pages of tender documents.
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of
piped water for the construction of the works and provide a satisfactory supply of
potable water for drinking, washing, sanitation and cleaning down. The contractor
will be responsible for all the costs where applicable of connection, meter
installation, water consumed, water required for testing purposes, disconnection
and the laying, maintenances and ultimate removal of any distribution system
around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor
and the contractor must make his own arrangements with the Corporation and
Electricity Supply Authorities and with other contractors to connect and to take a
supply from such services, paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on
the site for purpose of the work and shall pay such charges as is fixed by the
appropriate supply Authorities.
In case there is any delay in supply of power site of any interruption or fault in the
power during the work. No compensation shall be paid for idle labor staff,
machineries and for use of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their
initial/eligibility criteria mentioned above along with the bid. They shall have also
to submit the income tax clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized
Government approved licensed electrical person or firm in appropriate category in
accordance to contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives
issued by Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work
changes & thereby total amount of work increases/ decreases.
changes & thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical
decision what so ever.
34. In case of any dispute, decision of Municipal Commissioner shall be final and
binding on the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete
in any respect will be rejected. Municipal Commissioner reserves the right to
increase/decrease the scope of work. No any claim to that effect shall be
entertained. The Municipal Commissioner also reserves the right to reject any or
all the tenders without assigning any reason thereof.
36. The contractors are requested to quote their rates considering above tender
37. The contractor shall have to paid balance Security Deposit within 15 days from
the date if issue of Letter of Interest (LOI). And after paying the balance S.D. the
time limit will be started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 15 days penalty at
the rate of 0.01% of sanction tender amount per day will be deducted from the
Eventhough in special case, If work is not started because of monsoon or
any other special reason (like site is not available), after evaluation of situation
the actual date of starting of work will be consider after approval of Dy.M.C.
38. The Contractor shall not claim for increase or decrease in the quantity of the item
or the scope of work.
39. The payment shall be made as per the A.M.C policy for the work done by the
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per
guidelines published by WHO/ Center government/State government /Ahmadabad
municipal Corporation.
Signature of contractor with seal Addl.City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad
MunicipalCorporation, A'bad specified up to his first written demand, without demur without
delay andwithout the necessity of a previous of judicial or administrative procedures and
without thenecessity to prove to the Bank the defects or short comings or debits of the
contractor any sumwithin the limit of Rs.....................................................
2. We further agree that the Guarantee herein contemned shall remain in full force and
effectduring the period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before
(Date to be specified will not he less than 180 days from the stipulated date of receiving the
tender)we shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous
consentof the Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tendereror of the Bank.
Date: Signature & Seal of
5. The contractors shall have to furnish income tax clearance certificate before his tender
isaccepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Addl.City Engineer (S.Z) Dy. Muni.Commissioner (S.Z)
Date Ah. Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR.ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex Che ðgth ctœ&e dKJtbtkk
ytJNu. <ubs ðgth ctœ Jfo ytuzoh R~gw&gu&e mbtg bgtoœt NY &guje dKtNu.<&t <u mt&u fhthvºt fhJtltu hnuNu.
ylu<u bwsc ftb NÁ fhJtle <theF dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -
15 fh<tk J^w rJjkc ltk rfMmt btk <ubs Jfo ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh xuLzh hfbltk
0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk rJrNÐ rfMmt btk atubtmt ltk fthKu y&Jt yrlJtgo
fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk gtuøg<t aftme zu.Bgw.frb©h (œ.Ítul) le bkswhe bu¤Je ftb NÁ
fhJtle <theF dKJtbtk ytJNu.
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe fhJuht ChJtle sJtc>the
ftuLx[tfxhle hnuNu.
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u bwsc ftuLx[tfxlt cejbtk&e
fvt< fhJtbtk ytJNu.
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk ytJNu.
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk ytJNu.
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu
le gtœebtk hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su BGþrl.ftuvtuohuNl Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk ytJNu.
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu rlKog ytFhe hnuNu.
14. >huf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl MxtLzzo ftuz ytuV «ufxem ltkk
btLg ^tht ^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus
J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ
WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf s c<tJuj søgtyu fhJwk
vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl lu LþfNtl &Nu <tu <ule
mkÃËKo sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh ftb œhBgtl bswh fu sl<t lt ftuE btKmlt
òlbtjlu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu. vtujem Vhegt>&tg <tu <ule sJtc>the vK ftuLx[tfxhle
hnuNu. CuFz ^me l vzu <ule sJtc>the vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu mjtb<elt
vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu
<tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu ylu BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu
lrn. ytxÕþk mbSlu s xuLzh ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu<ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015bwsc <btb juch / bsqhtulwk dwsht<
rcÕzekd yuLz y^h fLMx[[fNl Jfombtkk VhSgt<hSMx[uNl fhtJJt ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u
vK sKtJJtLþk hnuNu. juch yufx «btKu ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu<ulu
vubuLx ytvJtbtk ytJNu lrn <ubs ct¤ bswhtulu ftb Wvh htFe NftNu lrn.<ubs JF<tu JF< Bgw. frBNlh©e îtht
fhJtbtkk ytJuj mh¾gwjhtule Nh<tu ftuLx[[tfxhlu ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu LþfNtle- J¤<hltu n¬ >tJtu
fhe NfNu lrn fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl VuhVth &Jtle N¾g<t hnuje
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u ykdu ftuLx[tfxh îtht
ftuEvK «fthle J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe
MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE sJtltu hnuNu. yLg&t
ftuvtuohuNl îtht <u hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve NfNu.
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele
sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu.
bswhtulu dbçËx, nuÕbux nt<k btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu
rJbtu vK W<thJtltu VhSgt< hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj
hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt<&tg <tu <ule vtujem ftgoJtnele fu juch yufx bwscle ftgoJtnele
sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu.
bswhtulu dbçËx, nuÕbux nt<k btuò rJduhu ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu
rJbtu vK W<thJtltu VhSgt< hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh ck^tguj
hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc yLþmhJtltk hnuNu. Mt>h
ÃþM<eft øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21, dtk^eldh&e b¤e hnuNu. su Juc mtEx
www.ahmedabadcity.gov.inWvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt hnuNu. yt ykdultu mkÃËKo
Fao <&t Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu <ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb atÕþ > vnujt, atÕþ ftbu
<&t ftb ÃËKo >ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu <u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV
MËalt ytvu <tu fubuhtbtk&e ftuBÃGþxhbtk Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu J¤<hle btkdKe fhe NfNu
lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult jtJJtlt hnuNu. sgtk
ftuE atuFJx l &E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk <&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu
muBvj yu«wÔz fhtÔgt ct> ftb NY fhtJJtLþk hnuNu.
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu òu yum.ytu.yth.btk
ytExb l ntug <tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t <hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt
mbSlu s xuLzh ChJtLþk hnuNu. J^tht le ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt, CgMËaf ctuzo, jtj xul
cuhefuxekd xuv, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu mtaJJtLþk hnuNu. ylu ftuEvK yfMbt<&Nu <tu <ule mkÃËKo
sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus ytme.mexe yuLSlegh©ele
<ubtk mne juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt, fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu
«tud{um J^thJt ltuk^ fhuj ntug <tu <uLþk ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh
ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE Jtk^tu jE NfNu
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe BGþrl.ftuvtuohuNllu
åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf<<btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe Rsluh
btuctEj lkch mt&u (œrûtK Ítul)
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft<
je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le
ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
>M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
" yb>tJt> BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt >huf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu
CtJ J^thtu ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe >huf
ytExbbtk J^^x &tg fu ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle
btkdKe fhJtle hnuNu lrn fu CtJ J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu
ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu
dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, r>Jt¤e, jøl meÍl fu yLg <nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t
l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t htuslt Yt.250.00le
J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu.”
ftuLx[tfxhle mne yuze.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 (Twelve)( ચોમસા િસવાય )months after the order to start the works.
Progress of work should be in proportion to time limit. The details of reinforcement of R.C.C. work
shall be as per design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be
brought by him on site. This account shall be regularly maintained and kept open for inspection by
Municipal Staff. Watering of all the items shall be as per instructions otherwise no payment shall be
made to contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of
binding vibrator for R.C.C. works if required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic.
He shall be responsible for any damage to public. If any incident happen, during the execution of
work. In case of dispute for unseen or overlooked items the decision of the Dy. City Engineer shall
be final. The contractor shall have to give site clean of all rubbish during the work and at the time of
completion of work and hand over the site with final finishing of the work as directed. All the rejected
materials shall be removed from site within 24 hours by contractor at this risk and cost. Debris shall
have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor
shall have to prepare through of bigger size and mix the mortar in the required proportion. In
on case he shall be allowed to mix the mortar either on floor or any finished surfaces. The
contractor shall have to make his own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor
and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if
item is not available in SOR than based on current market rates. In case of extra item decision of Add.
City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the
propose work the contractor shall carry out the same at his quoted rates without charges any extra
and the contractor will have to carry out the works and he will be paid at the rate quoted by him. No
claim for extra rate for subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall
have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be
fully responsible for compliance of the various provisions under contract Act. 1970 and the Rules
framed the to under.
The tender for the work shall remain open for a period (180) days from the date of opening of the
tenders for this work and that the tenderer shall not be allowed to withdraw on modify the offer on his
own during the period. If any tenderer withdraw or makes any modifications or addition in the terms
and conditions of his tender not acceptable to the Municipal Corporation the Municipal Corporation
shall without prejudice to any right or remedy be at liberty to forfeit in full the said earnest money and
black list the contractor.
If work is not completed within specified time limit the penalty shall be recovered as per Municipal
circular no-9 dated.18/05/12 separately. Contractor has to make his own arrangement for
procurement of steel and cement.
Contractors should note the following conditions carefully:-
Conditional tender shall not be accepted.
tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
i) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand draft
ii) Condition of Form - B1 Standard Specification of material & code of practice will be
applicable. Form B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt.
of Gujarat booklets of Building Works & and Road Works Specifications published by Gujarat Book
Depot, Sector-21. Gandhinagar.
CONTRACTOR'SSIGNATURE
ADDL.CITYENGINEER
& STAMP (South Zone)
AHMEDABAD MUNICIPAL CORPORATION ENGINEERING DEPARTMENT
STANDARD DETAILED TECHNICAL SPECIFICATION OF ITEMS
Name of work:- દ ણઝોનના મ ણનગર વોડમાં આવેલ ુદ ુ દ વોટર ડ ુ ન ટશન અને
ITEM No. 1 Labour charges for cleaning of UGWT sump / GL cistern including cleaning and removing
algae, calcinations, sludg dirt deposition from bottom and as well as from wall af container,
disinfection by bleaching powder with all necessary tools and plants, labours and cost of disfentanc etc
ITEM No. 2 Conveyance charge of earth murrum, building rubbish, manure, garbage, sludge, excavated
rock,fly ash, aggregates of any kind etc.comp
ITEM No. 3 : Providing and constructing, Underground (U/G) water tank of specified capacity, on specified
location, for all depths, in controlled CC of M-200 grade with bottom slab, top slab and RCC walls,
including cost of form work and reinforcement,with inside and outside plaster in CM 1 :3 and water
proofing treatment as per IWP specification,including injection, grouting, etc. complete. The rate
includes for providing and fixing two nos. 0.6m. x 0.6 m. size medium duty CI manhole cover/s at top,
including wash out pipe line and inlet and outlet connections etc. complete.
Contractor signature Addi. City Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender no. 920.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .