Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 CrRejected-Finance MOH SHER MOHAMMAD PILIBHIT | PILIBHIT | UTTAR PRADESH | 262001 | ₹1.4 Cr | L3 | Rejected-Finance L3 |
Tender Value
₹1.4 Cr
EMD Value
₹9.1 L
Closing Date
7 May 2026, 12:00 pmClosed
SE BADAUN/PILIBHIT CIRLCLE PWD BLY
SE BADAUN/PILIBHIT CIRLCLE PWD BLY
Construction work of Box Culvert Kataiya Nawada Near Pangahli river purak nale 5x5x5 Mtr span Box culvert approach road and surakshatam work
2026_CEBLY_1138121_3
2822/533C(E.T.)-08/2025-26 Date 30-03-2026
Open Tender
Civil Works - Bridges
270 days
Bareilly
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹9.1 L
Yes
21 May 2026
28 Apr 2026
7 May 2026
28 Apr 2026
7 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing cost of dewatering including cost of boaring laying of 4" dia PVC pipe hire charges of 7.50 KV deisal pumping set hire charges of PVC pipe & cost of 4" dia plastic pipe for desposal of water as required distance also including wages of pumping set oprator its fuel etc. As per DSR 12.45.4 (a) | 336 | Hour | 117 | ₹39,312 |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per MORTH specification No 12.01 & 304 | 496.8 | Cum | 95 | ₹47,196 |
| 3 | Construction of granular subbase by providing Well grade material, spreading in uniform layers with Motar grader/tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with rotarater at OMC and compacting with smooth wheel roller to achieve the desired density complete as per Technical Specification Clause 401. | 197 | Cum | 3,258 | ₹6,41,826 |
| 4 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per MORTH specification No 12.40 & 2100 M-10 | 42.4 | Cum | 6,514 | ₹2,76,193.6 |
| 5 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.RCC Grade M25 using batching plant transit mixer & manual placing | 351.4 | Cum | 9,221 | ₹32,40,259.4 |
| 6 | providing and fixing of PVC pipe for raft, wall and slab etc. | 60 | Rm | 132 | ₹7,920 |
| 7 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications As per MORTH specification No12.41, 1600 & 2200 | 34.48 | MT | 76,931 | ₹26,52,580.88 |
| 8 | Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces.As per MORTH specification No 14.16 & 800 | 761.8 | Sqm | 92 | ₹70,085.6 |
| 9 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification As per MORTH specification 13.9, 710.1.4.of IRC:78 & 2200 | 47.76 | Cum | 3,870 | ₹1,84,831.2 |
| 10 | Providing for laying Boulder apran for bed protection with stone boulders of minimum size and weight as per table 1300.1 no fragment weighting not les than 25 kg. laid dry Complete as per drawing and technical Specification clause 1301 | 132.4 | Cum | 3,590 | ₹4,75,316 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.86 MB
BOQ_2135423.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid