Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.2 CrAdmitted-Finance HOUSE NO C 21 GATE NO 2 NAVJEEVAN SANG COLONY NAINWA ROAD BUNDI RAJ | BUNDI | BUNDI | RAJASTHAN | 323001 | L1 | Admitted-Finance | ||
| 2 | L2₹13.5 Cr+₹30.1 L (2.28%)Admitted-Finance NEAR DOODHADHARI TEMPLE LADPURA KOTA | KOTA | KOTA | RAJASTHAN | L2 | Admitted-Finance | ||
| 3 | L3₹14.2 Cr+₹1.0 Cr (7.93%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹14.4 Cr+₹1.2 Cr (9.15%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹14.4 Cr
EMD Value
₹28.8 L
Closing Date
5 Jun 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ACE PWD ZONE KOTA
ACE PWD ZONE KOTA
Widening and Strengthening of Kota Kaithoon Sangod Bapawar Chhabra Dharnavada Road Kilometer 7/800 to 13/700 (SH-51) (Two Lane with Paved Shoulder carriageway, Width 10 Meter) in District Kota
2023_CEPWD_326404_13
ACE PWD ZONE KOTA NITNO-22-2022-23
Open Tender
Civil Works
Percentage
300 days
KOTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
10000 EE PWD DISTT. DIV. KOTA
₹28.8 L
Yes
ACE PWD ZONE KOTA
16 Jun 2023
28 Mar 2023
7 Jun 2023
28 Mar 2023
5 Jun 2023
28 Mar 2023
6 Apr 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, brush, shrubs, saplings and trees of girth upto 300mm, removal of stumps, disposal of unserviceable Material and stacking of serviceable Material upto 1000m from road boundary. (MoRTH Specification : Clause 201). BY MECHANICAL MEANS In area of Thorney Jungle | - | hectare | - | - |
| 2 | Construction of sub-grade and earthen shoulders with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to require slope and compacted by vibratory roller 8-10 tonne to meet requirement of Table 300-2 as per MoRTH specification : Clause No. 305. | - | Cum | - | - |
| 3 | Providing, laying and spreading and compacting specified graded crushed stone in sub-base course including premixing the Material at OMC in mechanical mixer (Pug mill), carriage of mixed Material, laying in uniform layers with Motor Grader, F.E. Loader, on a prepared surface and compacting with Vibratory Compactor to achieve the desired density including all Material, labour, machinery, lighting barricading and maintenance of Driversion complete. (MoRTH specification clause 401). with all lead & lift | - | Cum | - | - |
| 4 | Filling pot holes and patch repair with Wet Mix Macadam specifications including premixing the Material with water to OMC in mechanical mixer (Pug mill) as per design mix, carriage of mixed Material by tipper to site laying in uniform layers, with motor grader/F.E. loader/Paver Finisher, in sub-base/base course on a well prepared under-base and compacting with Vibratory Roller to achieve the desired density including lighting, guarding, barricading and maintenance of Driversion etc. (MoRTH specification : Clause 406). with all lead & lift | - | Sqm | - | - |
| 5 | Providing and applying tack coat on the prepared surface, with bitumen emulsion as per IS:8887 & manufacturer’s specifications @0.275 kg/sqm with a self propelled or towed bitumen pressure sprayer equipped for spraying the Material uniformly at specified rates and temperatures (including cleaning of road surface) as per MoRTH specification Cl. 502, 112. | - | Sqm | - | - |
| 6 | Filling pot-holes and patch repairs with open-graded premix surfacing, 20mm thick compacted with bitumen binder VG10 @14.60 kg/10 sqm and aggregate in Hot Mix Plant, transporting the mixed Material with tipper and laying manually to the required level and grade, rolling with power roller, 8-10 tonne, removal of all failed Material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot-holes with hot bituminous Material as per Clause 511, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 including cost of tack coat and excluding cost of seal coat with lead for mix of Material 1 km. (MoRTH specification : Clause 3004.2) | 1 | Sqm | - | - |
| 7 | Providing and laying Dense Bituminous Macadam on prepared surface with specified graded crushed aggregates (as per table 500-9, 500-10 and design mix) for base/binder course including loading of Material with F.E. loader, heating of binder (including cost of anti stripping compound, wherever required) aggregates and filler in hot mix plant (40-60 TPH), transporting the mixed Material by tippers and laying with sensor paver finisher as per clause 504.3.5 to the required level and grade, rolling by self propelled power rollers and vibratory rollers or pneumatic tyred roller, 150-250 KN. TP=0.7 Mpa, to achieve the desired density (approved by the department) but excluding primer/tack coat. (MoRTH specification : clause 505, 112). with all lead & lift (a) 50-75mm compacted thickness with 4.5% bitumen content VG30 grade | 1 | Cum | - | - |
| 8 | Providing and laying Bituminous Concrete as per Design Mix on prepared surface with specified graded stone aggregates as per Table 500-17, for wearing course including loading of aggregates with F.E. loader and hot mixing of binder (including cost of anti-stripping compound, wherever required) and 3% cement filler with aggregates in Hot Mix Plant 40-60 TPH, transporting the mixed Material with tipper to paver and laying with sensor paver finisher (as per clause 504-3.5) to the required level, grades and rolling with vibratory compactor and pneumatic tyred roller 150-250 kN, TP = 0.7 Mpa, to achieve the desired density (approved by the department as per job mix) excluding cost of primer/tack coat. (MoRTH specification : clause 507). with all lead & lift 30-45mm compacted with 6% binder (a) With straight run bitumen grade VG30 | 1 | Cum | - | - |
| 9 | Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with lead upto 1 km as per MoRTH Specification : Clause No. 305. | 1 | Cum | - | - |
| 10 | Carriage of sand bajri, ballast, stone, boulders, kankar and gravelly, Earth Material including loading and unloading stacking etc. complete. [MoRTH specification : 514.5 Table 500.28] For a lead upto 4 km | 1 | Cum | 1 | ₹1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.87 MB
Tendernotice_2.pdf
PDF • 16.67 MB
Tendernotice_3.pdf
PDF • 7.92 MB
POST-QUALIFICATION.pdf
Tender Documents • 0.13 MB
BOQ_579745.xls
BOQ • 0.29 MB
RATE-ANALYSIS.pdf
Tender Documents • 5.39 MB
COMPONENT.pdf
Tender Documents • 4.72 MB
TENDER-DOCUMENT.pdf
Tender Documents • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .