Tender Value
₹70 L
EMD Value
₹50,000
Closing Date
4 Oct 2022, 2:00 pmClosed
Ex Engg 400KV TLD BHEP
Office of the Ex Engg 400KV TLD BHEP Chanderkote
Annual Maintenance contract of breakdown / emergency works and planned works pertaining to 400 KV D/C Baglihar Kishenpur transmission line including LILO line
2022_SPDC_187558_1
E Nit No 03 of 2022
Open Tender
Electrical Works
Percentage
365 days
Baghlihar-Kishanpur 400KV Line
As per SBD
3 documents required · 3 mandatory
₹2,000
CP and AO BHEP Chanderkote
₹50,000
Office of the Ex Engg 4ooKV TLD BHEP Chanderkote
21 Oct 2022
12 Sept 2022
5 Oct 2022
12 Sept 2022
4 Oct 2022
17 Sept 2022
12 Sept 2022 - 17 Sept 2022
16 Sept 2022
Amount
Breakdown Works/Emergency Works
Replacement of burnt/ damaged jumpers and tightening of remaining Jumpers on the same tower.
Replacement of damaged disc insulators of Tension string.
Replacement of damaged disc insulators of Suspension string.
Restoration of snapped power conductor. Complete job including mid-span compression joint, laying of conductor, rough sagging, tensioning of conductor dead-end assembly etc upto span of 500 meter tension to tension point.
Restoration of snapped earth wire Complete job including mid-span compression joint, laying of earth wire, rough sagging, tensioning of earth wire dead-end assembly etc up to span of 500 meter tension to tension point.
Removal of trees if dropped on the transmission line in case the fault occurred.
Repairing of damaged moose conductor by using helical sleeve or bolted or by shorting method without lowering the conductor.
Emergency tower top checking in case if the fault not located in ground.
Providing of stay wire to the towers for its strengthening including (complete job)
Planned works
Checking and tightening of jumper including inserting/removal of temporary local earthing. (Complete Job).
Checking and tightening of vibration dampers (12 Nos. per circuit per tower) including inserting/removal of temporary local earthing. (Complete job).
Checking and tightening of corona rings (12 Nos. per circuit per tower) including inserting/removal of temporary local earthing. (Complete Job).
Replacement of damaged disc insulators of Tension string.
Replacement of damaged disc insulators of Suspension string.
Tightening of nuts and bolts of tower superstructures having tower weight from upto 20 tonnes.
Tightening of nuts and bolts of tower superstructures having tower weight more than 20 tonnes.
Replacement of damaged corona ring.
Replacement of Damaged or missing line spacers.
Fixing of anti-climbing device/Bird Gaurd over tower.
Checking and tightening of tower footing earthing bolt and measuring tower footing resistance.
Fixing of new vibration dampers on earthwrie/ACSR moose conductor (including inserting/removal of temporary local earthing).
Replacement of damaged or missing tower members.
Branch cutting: Under the corridor of 400 KV D/C Baglihar Kishanpur transmission line 48 metre wide and under tower structure.
Global Construction
M/S PRESTIGE ALLOCHI BAGH SRINAGAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .