Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹50.7 L
EMD Value
₹51,000
Closing Date
23 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Gujarat High Court (R&B) Division, Ahmedabad.
(2216-SR) S.R. to 30 Judges Bungalow, Bodakdev, Ahmedabad. [Replacing parking tiles, fixing new parking tiles in garden area, fixing FRP door for electric metre in Bunglow No 1, applying inside and outside painting in Bunglow no 13, applying waterproofing on terrace, fixing cool roof terrace tiles, bamboo partition, inside and outside painting, FRP shed and misc civil work as required in other bunglows.]
356600
11 of 2026-2027 (Short Notice)
Open
Civil Works - Buildings
Works
Ahmedabad
6 documents required · 6 mandatory
₹2,400
Executive Engineer, Gujarat High Court (R and B) Division, Ahmedabad
₹51,000
19 Oct 2026
19 Oct 2026
19 Oct 2026
23 Oct 2026
19 Oct 2026
90 days
Estimated Rate Total Amount
2 198.15 Cum. Demolition and disposal of unserviceable materials with all lead and 609.26 Cum.
And TwentySix Paise Only
lift.(i) Cement concrete.
Scrapping oil paint / emulsion paint from steel and other plastered Rupees FourtyNine And
surface and making the surface even [With hand scrapping]. ThirtyTwo Paise Only
Rupees One Hundred
Excavation for foundation upto 1.5 m depth including sorting out
4 70.17 Cum. 117.08 Seventeen And Eight Paise Cum.
and stacking of useful materials and disposing off the excavated stuff
upto 50 Meter lead. (A) Loose or soft soil.
Providing and laying cement concrete work 1:2:4 [1- Cement : 2- Rupees Three Thousand Nine
Coarse sand : 4- graded stone aggregates 20mm nominal size] and
5 172.52 Cum. 3962.77 Hundred SixtyTwo And Cum.
curing complete excluding cost of formwork and reinforcement for
SeventySeven Paise Only
reinforced concrete work in [A] Foundations, footings, Base or
columns and Mass concrete.
Applying protection layer on sunk slab surface of a 3mm thick
priming cum waterproofing 1 coat of Techoxy – 3 two component
epoxy resin based and 2 coats of Colour Membrane on top layer Rupees One Thousand
6 656.82 Sqm. acrylic base only Choksey Brand or as approved by High Court of 1032.65 ThirtyTwo And SixtyFive Sqm.
Gujarat, Choksey Techoxy – 3 One-part epoxy resin and the other
part of curing agent diluted with water in proportion as per
manufacturers specification including material, labour &
equipment’s etc. complete. For all Floor.
Providing and laying Acid, Alkali and chemical resistant Full Body
High Strength [Strength Minimum > 38 N/mm²] Vitrified tiles [AS
per IS 4457 of 2007 & ISO: 14001] of size 300 mm x 300 mm or
mm X 400mm and 12 mm or more thick of approved make [H & R
Jhonson [India], NITCO Limited, Kajaria Ceramics Limited,
Oreintbell Limited, Nexion International] shade and size for flooring
and skirting of 100mm high laid on bed of 12mm thick cement
mortar 1 : 3 [1 cement: 3 coarse sand], using PVC tile spacer, flush Rupees One Thousand Four
7 493.23 Sqm. pointing with white cement using colour pigment, protecting the 1401.88 Hundred One And Sqm.
tiles with POP until completion and handing over and cleaning EightyEight Paise Only
subsequently before handing over, including cost of all materials,
labour, curing, complete HOM of equipment’s and machineries, all
leads and lift, loading and unloading charges, transportation cost
and conveyance of all materials, and all other incidental charges at
all floor levels etc., complete for successful completion of work as per
drawings & specifications and as directed by the Engineer-in-charge
and approved by High Court Authority.
Providing and laying Thermal Shock Resistance [Cool Roof Tiles],
Abrasion Resistance, Skid Resistance and chemical resistant High
Strength [Strength Minimum > 35 N/mm²] Vitrified tiles [AS per IS
mm of 10 mm or more thick of approved make [H & R Jhonson
[India] or Nexion International Make Only] shade and size for
flooring and skirting of 100mm high laid on bed of 12mm thick
cement mortar 1:3 [1 cement: 3 coarse sand], using PVC tile spacer,
making groove finished using by Epoxy grout, flush pointing with
Rupees One Thousand Two
8 656.82 Sqm. white cement using colour pigment, protecting the tiles with POP 1239.27 Hundred ThirtyNine And Sqm.
until completion and handing over and cleaning subsequently before TwentySeven Paise Only
handing over, including cost of all materials, labour, curing,
complete HOM of equipment’s and machineries, all leads and lift,
loading and unloading charges, transportation cost and conveyance
of all materials, and all other incidental charges at all floor levels etc.,
complete for successful completion of work as per drawings &
specifications and as directed by the Engineer-in-charge and
approved by High Court Authority.
Providing and fixing of designer or Bhalla pattern bamboo partition
/ structure made from minimum 1/3 part of 55mm dia. natural
bamboo stick and binding with help of teak wood Patti on the top
surface of wall including applying Three coat of paint with priming Rupees One Thousand Two
9 249.36 Smt. coat or natural polished on both side surface of bamboo partition, 1290.68 Hundred Ninety And Smt.
fixing the partition on to the top surface of the wall with required
SixtyEight Paise Only
nails, screw, G.I. Rope all labour, tools, plants, equipment & other
material related to the work as per requirement etc. complete.
Bamboo Partition shall be prepared as per detailed design
given/directed by Engineer in charge.
Steel work in built up section framed work including cutting,
welding, hosting, fixing in position with buffing & smooth finishing,
all fixtures, fastening, welding rod, face shield, gloves, welding Rupees EightySeven And
machine, other required safety measures, nuts, bolts and required EightySeven Paise Only
material, labour, transportation, tools etc. complete as per approved
by High Court Authority & direction given by Engineer in Charge.
Providing and fixing 2 mm thick F.R.P. sheet made from Fibre-
reinforced polymer plastic composite material with sandwich type
and bamboo chips pattern or as approved by High Court Authority
for roofing system with fixing on M.S. fabrication structural grid Rupees One Thousand
11 264.01 Sqm. using by self-tapping screw including resin- hardener vata on joint & 1095.85 NinetyFive And EightyFive Sqm.
edge of wall, F.R.P. sheet of common edge side shall be embedded in Paise Only
the wall surface as and where required, joint filling by silicon or
required material, all material, equipment, labour, scaffolding etc.
complete as directed by Engineer in charge.
Applying One coats of Formulated with PU hybrid polymers and
reinforcing acrylic fibres smart care Damp Proof Ultra of Asian Rupees Five Hundred
Brand or as approved make by High Court Authority on existing
12 415.57 Sqm. 578.73 SeventyEight And Sqm.
wall surface to give protection from moisture content including all
SeventyThree Paise Only
materials, scrubbing of surface, labour and equipment charges etc.
complete as approved by High Court Authority and directed by
Engineer in Charge.
All the steel should be thoroughly cleaned free of rust and painted
with one coats of approved anti corrosive primer after fabrication
but before erection. After erection the entire steel fabricated structure
shall be painted with two coats enamel paint [One Coat Primer + Rupees One Hundred
13 839.41 Sqm. Two Coats of enamel Paint] of approved shade by sprayer and 122.49 TwentyTwo And FourtyNine Sqm.
finished to satin / matt finish. The coated rates shall include the cost Paise Only
of all materials, labour, tools, scaffolding, during the paint work all
floors and walls shall be covered by plastic paper, cleaning the
surface of all dirt, dust and other foreign matter.
Wall painting three coats of plastic emulation paint [In addition to
two coats of Lappy-Putty + two coats of primer] of approved Asian Rupees One Hundred
Paint, Indigo Paint, Dulux Paint [Asian Paint Appcolite Category
14 2770.47 Sqm. 153.54 FiftyThree And FiftyFour Sqm.
Minimum] and manufacture on undecorated wall surface to give an
even shade including thoroughly brushing the surface free from
mortar dropping and other foregine matter and sand papered
Finishing wall with weather proof exterior emulsion paint on wall Rupees One Hundred
15 3589.97 Sqm. surface [two coats] to give an required shape an even shade after 114.53 Fourteen And FiftyThree Paise Sqm.
thoroughly brushing the surface to remove all dirt, and remains of Only
loose powdered material etc, complete.
Amount Put to Tender Without G.S.T. [Total Rs.]
Net Amount Without G.S.T. [Total Rs.]
Rupees Fifty Lakh SixtySeven Thousand One Hundred Seven And Nine Paise Only
I / We am / are willing to carry out the work at _______________ % Above / Below percent (Should be written in figures and words) of the estimated rates
mentioned above. Amount of my / our tender works out as under.
Estimated Amount Estimated Amount
Put to Tender ₹ 50,67,107.09 Put to Tender ₹
The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-in-Charge for Which no Extra payment
Note: 2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note: 3 GST and Income tax TDS will be deducted at a source while making payment of bills.
In all RCC Items in Rate Analysis Standard Cement Consumtion has been taken as per Govt. G.R.: PRC-10-2017 Cement Consumption/16/C Date:
Note: 4 11/05/2017 as stated in S.O.R. therefor in R.C.C. items where there is a Change as per Actual mix Design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of Input rate mentioned in all the tender.
Note: 5 Dismentaling Credit amount of Rs.8,669.25 for dismentalled items as per dismentaling credit statement will be deducted from Bill Amount.
Dated Signature of the
Deputy Executive Engineer Executive Engineer
Gujarat High Court [R & B] Sub Division No. 2 Gujarat High Court [R & B] Division
Ahmedabad Ahmedabad
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001-SBD (SR to 30 Judges Bunglow).pdf
002-Sch-B (SR to 30 Judges Bunglow).pdf
003-Dismental Credit St.pdf
004-Specification (SR to 30 Judges Bunglow).pdf
005-Testing Schedule.pdf
006-Extra Security Deposit Statement.pdf
007-GR as per SBD (12-01-2024)-Guj High Court.pdf
008-Standards for Cement Con. Dt.11-5-2017.pdf
009-Single Tender GR Dt.18-2-2017.pdf
010-Tender Negotiation Dt.08-06-2018.pdf
011-Testing Schedule Dt.24-10-1994.pdf
012-GR Regarding Laplength in Reinforcement Dt.15-2-2017.pdf
013-FD Circular No 1097 GST Dt.15-9-2018.pdf
014-Registration Mandatory Dt.3-9-2016.pdf
015-Mix design condition.pdf
016-Tender Reinvite Guideline Dt.25-8-2015.pdf
017-E-Tendering-Tender Fee and EMD Dt18-1-2008.pdf
018-E-Tendering-Tender Fee and other doc Dt.27-11-2008.pdf
019-Payment through RTGS-NEFT Dt.30-4-2018.pdf
020-Bond-Anti-Termite.pdf
021-Bond-Colour Work.pdf
022-Bond-FRP Door.pdf
023-Bond-Wateer proofing.pdf
024-COMPUTERISED MB GR Dt.1-2-2017.pdf
025-RMC (Dt.15-07-2023)for above 5 cr works.pdf
026-Performance Bond and Bitumen date (1).pdf
027-Tender Negotiation Dt.17-3-2026.pdf
028-15 year lift amc GR.pdf
029-Bank Guarantee as SD-EMD Dt.01-04-2026.pdf
030-Mix Design GR 16.10.25.pdf
031-GTS Booklet-192 Pg.pdf
032-Tender Notice No.11 of 2026-27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .