| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-Finance | ₹2.5 L | 1 | Accepted-Finance lowest amount quoted than estimate |
| 2 | 2₹2.6 LRejected-Finance | ₹2.6 L | 2 | Rejected-Finance higher amount quoted |
| Sl No | Description | Qty | Unit | VG CONSTRUCTION L2 | VGM CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of Toilet at Burma Colony PUES in Navalpattu Panchayat. Earth work excavation for Foundation in all clauses of soils and sub soils to full depth etc., ordinary soil complete | 15.41 | cum | 274.56 ₹4,230.97 | 264 ₹4,068.24 |
| 2.00 | Supplying and filling in foundation, basement,etc with filling M-sand in layers of not more than 15cm thick well watered rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.97 | cum | 2,142.4 ₹6,362.93 | 2,060 ₹6,118.20 |
| 3.00 | Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate ) using 40mm guage hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15cm thick, well rammed conso | 2.97 | cum | 6,206.72 ₹18,433.96 | 5,968 ₹17,724.96 |
| 4.00 | Brick workusing country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (one cement and five M.sand) including curing neat finishing. Etc., complete complying with standard specification. | 9.22 | Sqm | 6,490.64 ₹59,843.70 | 6,241 ₹57,542.02 |
| 5.00 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting us | 16.11 | Sqm | 568.88 ₹9,164.66 | 547 ₹8,812.17 |
| 6.00 | Cement Concrete 1:1 - 1?2:3 (one cement, one and a half crushed stone M. Sand and Three hard broken stone Jelly ) using 20mm guage hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill fabricating charges center | 6.08 | Sqm | 10,262.72 ₹62,397.34 | 9,868 ₹59,997.44 |
| 7.00 | Supplying ,fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I binding wire in all floors etc. complete complying with standard specification | 0.2 | Sqm | 95,593.68 ₹19,118.74 | 91,917 ₹18,383.40 |
| 8.00 | Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site and all labour charges etc complete. | 21.89 | Sqm | 344.24 ₹7,535.41 | 331 ₹7,245.59 |
| 9.00 | Plastering with Cement Mortar 1:5 (One Cement and Five M.sand ) 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 75.22 | Sqm | 300.56 ₹22,608.12 | 289 ₹21,738.58 |
| 10.00 | Providing granolithic floor floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M. Sand and Four aggregate) using 10 to 12mm guage hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl etc complete complying with standard | 10.49 | Sqm | 182 ₹1,909.18 | 175 ₹1,835.75 |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
23 Feb 2026, 3:00 pmClosed
BDO
BDO BP Tiruverumbur
Construction of Toilet at Burma Colony PUES in Navalpattu Panchayat
2026_RDTN_662062_1
A2/1393/2025 Burma colony
Open Tender
Civil Works
180 days
Tiruverumbur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,000
Yes
6 Mar 2026
20 Feb 2026
23 Feb 2026
20 Feb 2026
23 Feb 2026
20 Feb 2026
Construction of Toilet at Burma Colony PUES in Navalpattu Panchayat. Earth work excavation for Foundation in all clauses of soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation, basement,etc with filling M-sand in layers of not more than 15cm thick well watered rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:4:8 mix ( one cement four sand and eight aggregate ) using 40mm guage hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15cm thick, well rammed conso
Brick workusing country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (one cement and five M.sand) including curing neat finishing. Etc., complete complying with standard specification.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting us
Cement Concrete 1:1 - 1?2:3 (one cement, one and a half crushed stone M. Sand and Three hard broken stone Jelly ) using 20mm guage hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill fabricating charges center
Supplying ,fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I binding wire in all floors etc. complete complying with standard specification
Plastering with cement 1:3-10mm thick including cost and conveyance of al materials to site and all labour charges etc complete.
Plastering with Cement Mortar 1:5 (One Cement and Five M.sand ) 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Providing granolithic floor floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M. Sand and Four aggregate) using 10 to 12mm guage hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl etc complete complying with standard
White washing two coats with freshly burnt whiteshell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including through scrapping, clean removal of dirt, and including neceesary plaster of pairs putty, whenever required etc., complete complying with standard specification.
Cost and Supply of IWC
Cost and supply of EWC
Cost and supply of PVC door
Cost and supply of RCC jolly
90mm PVC pipe 4KSC
90mm PVC Elbow
90mm PVC TEE
90MM pvc Gate valve
90mm PVC Reducer
Provision for Leach pit Arrangement
Towards Name board charges
Towards Photographic Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
Techbidtoilet.pdf
Tender Documents • 0.42 MB
pricebidtoilet.pdf
Tender Documents • 0.29 MB
BOQ_794751.xls
BOQ • 0.33 MB