Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAccepted-Finance ROSHA PALACE EX COLONY PO PALODE PACHE TRIVANDRUM | TRIVANDRUM | KERALA | ₹3.5 L | L1 | Accepted-Finance First Lowest |
| 2 | L2₹3.6 LAccepted-Finance | ₹3.6 L | L2 | Accepted-Finance Second Lowest |
| 3 | L3₹4.0 LRejected-Finance | ₹4.0 L | L3 | Rejected-Finance Third lowest |
| 4 | L4₹4.0 LRejected-Finance | ₹4.0 L | L4 | Rejected-Finance Fourth lowest |
Tender Value
₹4.1 L
EMD Value
₹10,400
Closing Date
20 Jun 2026, 5:00 pmClosed
Executive Engineer,TDB Trivandrum
Office of the Executive Engineer TDB Nanthancode Trivandrum
Kottarakkara Padinjattinkara Devaswom in Kottarakkara Group-Providing temporary pandal infront of Belitharpanakkadavu, Stage and associated works in connection with Karkkidakavavu festival in 1201ME -reg
2026_TDB_855980_1
EET/eT-07/2026-27
Open Tender
Civil Works - Others
10 days
Kottarakkara Padinjattinkara Devaswom
Please refer Tender documents.
6 documents required · 6 mandatory
₹979
₹10,400
22 Jun 2026
17 Jun 2026
22 Jun 2026
17 Jun 2026
20 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.001 | OD58223/2026-2027:Cutting and clearing the grass and other over growth of vegetation and small trees from the temple compound-coolie | - | each | 1,082.18 | - |
| 1.002 | OD58214/2026-2027:Hire and labour charges for putting up temporary pandal up to a span of 8 m using with 50 mm Gl pipe post in three rows of 2.5m spacing 3.00 m height in longitudinal sides and 5m height in centre Including 50cm below ground level and rafters, ridge and Bressummer using 40mm dia Gl pipe and providing purlins by using 32 mm dia Gl pipes 1.20 m spacings at both sides (Top and bottom to prevent the sheet from being blown away by the wind) and the above are fixed by using clamps/ nut and bolt or Gl tying wire,coir yarn etc. Roofing with 0.30m Gl corrugated sheet including over laps and linishing etc. The above one dismantling and removing and the areas cleared after the period including all labour charges etc. complete for 10 days. | - | sqm | 201.63 | - |
| 1.003 | OD58216/2026-2027:Hire and labour charges up to a period of 10 days for providing GI Barricade with GI post using 40 mm GI pipe 2 Nos horizontal and verticals 1.5m apart 1m height above GL and 0.50m below
GL including excavation cutting pipe and tying firmly to verticals and horizontal with plastic or coir and dismantling site after use* | - | metre | 198.01 | - |
| 1.004 | OD58222/2026-2027:Providing Earthern bund of an average size 50x20cm for preventing the entry of rain water in to the shed | - | metre | 27.06 | - |
| 1.005 | OD58217/2026-2027:Hire and labour upto a period of 10 days for screening with Mull cloth upto a height of 2.00 m including all labour charges for fixing , dismantling after use. | - | sqm | 20.52 | - |
| 1.006 | OD58215/2026-2027:Hire and labour up to a period of 10 days for mull cloth ceiling to pandal including red frills | - | sqm | 95.74 | - |
| 1.007 | OD65642/2026-2027:Hire and labour charges for providing carpet upto 10 days,the rate including hire charges of carpet, conveyance ,labour charges for spreading and removing after use | - | sqm | 41.79 | - |
| 1.008 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | 345.54 | - |
| 1.009 | OD58230/2026-2027:Engaging Coolie for clearing algae,water lentils ,waste,etc., from the temple tank | - | each | 1,082.18 | - |
| 1.01 | OD58233/2026-2027:Hire and labour charges for fixing green net at the kadavu portion for restricting the entry of moss and other waste materials beyond a certain limit, thereby creating a bathing space for devotees, as per the direction of the Engineer-in-Charge.The rate including the hire charges of casuarina pole as vertical members for the framework, hire charges of green net, casuarina poles, coir yarn, and labour charges, etc., complete for a period up to 3 days. | - | sqm | 71.5 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
priliminaryagrementcorrected.pdf
Tender Documents • 0.02 MB
BOQ_1447176.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid