Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹2.3 L+₹650 (0.28%)Rejected-Finance DATMA MORE KUJU DIST RAMGARH JHARKHAND 825316 | RAMGARH | JHARKHAND | 825316 | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹2.3 L+₹2,451 (1.06%)Rejected-Finance | L3 | Rejected-Finance Due to L3 |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
15 Jun 2024, 6:00 pmClosed
Project Engineer (Excv), Tapin North OCP
Office of Project Engineer (Excavation), Tapin North OCP, Hazaribagh Area
Repairing of Air conditioning system, lighting and auto electrical system CAT988H Front End loader sl. no. 261 at Tapin North OCP, Hazaribagh Area.
2024_CCL_309823_1
PE(X)/Tapin (N) OCP/NIT/24-25/06 Dated 05.06.2024
Open Tender
Excavation Department Work
Item Rate
10 days
Tapin North OCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,400
8 Sept 2024
5 Jun 2024
17 Jun 2024
5 Jun 2024
15 Jun 2024
5 Jun 2024
5 Jun 2024 - 9 Jun 2024
Amount
Part A: Repairing of AC System Repairing and chemical cleaning of condenser.
Replacement of all ‘O’ Ring.
Replacement of AC Belt(1906560)
Replacement of Dryer(2573226)
Replacement of Thermostat switch(3E5464)
Replacement of Pressure switch(1145333)
Replacement of Hose(2462293)
Replacement of Hose(2462294)
Replacement of Hose(2664234)
Replacement of Hose(3294997)
Replacement of Hose(3474784)
Repairing of Blower motor assly.
Repairing of Compressor.
Filling of Compressor Oil(250ml)
Filling of R134 gas.
Flushing, leakage testing & system vaccum charges
Highly skilled person(01 person per shift x 03 days)
Semi skilled person –( 02 person per shift x 03 days)
Part B: Repairing of Lighting and Auto electrical system Adapted PVC Tape
Light Switch 24V
L T Wire 5mm
L T Wire 6mm
Head Light assembly(Square size)24V
Battery Terminal
Cable lug 95 mm sq.(Cu)
Audio visual backup alarm
T. T. Horn 24V
Cabin Fan 24V
Conduit (PVC Cover)
Battery Relay 24V
Battery Cable(Standard size)
Highly skilled person(01 person per shift x 03 days)
Skilled person –( 01 person per shift x 03 days)
Semi skilled person –( 02 person per shift x 03 days)
Total impact of GST for the purpose of CTC
NATIONAL ENGINEERING WORKS
M/S PARVEJ ENTERPRISES
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .