| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.3 LAccepted-AOC | L1 | Accepted-AOC being L1 bidder | |
| 2 | L2₹52.1 L+₹2.2 L (4.35%)Rejected-AOC | L2 | Rejected-AOC being L2 bidder |
Tender Value
₹43.4 L
EMD Value
₹50,000
Closing Date
11 Dec 2019, 6:00 pmClosed
Executive Engineer
Executive Engineer Inland Navigation Division,kollam
CSINDConstruction of Canal drop instead of Super passage at Ch 46220m of TS canal
2019_Irrig_325900_1
05/EE/2019-20
Open Tender
Civil Works - Others
Item Rate
365 days
Thazhevettoor
Please refer Tender documents.
5 documents required · 5 mandatory
₹11,300
online
₹50,000
Yes
2 Mar 2020
29 Nov 2019
17 Dec 2019
29 Nov 2019
11 Dec 2019
29 Nov 2019
Amount
DETAILED ESTIMATE
APPENDIX - A- Demolishing of supper passage
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.9.2 : Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
Appendix - B
CONSTRUCTION CANAL DROP and side protection works
60.1.1 : RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete.as per direction of Engineer -in- Charge
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc completeas per direction of Engineer -in- Charge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil as per direction of Engineer -in- Charge
60.7.2 : DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of Engineer -in- Charge.
16.95 : Providing & making Gabion structure with Mechanically Woven Double TwistedHexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVCcoated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitionsat every 1m interval and shall have minimum 10 numbers of openings per meter ofmesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD),supplied @3% by weight of Gabion boxes, filled with boulders with least dimensionof 200 mm, as per drawing, all complete as per directions of Engineer-in-charge.
60.7.4 : DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc.as per direction of Engineer -in- Charge.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)etc.as per direction of Engineer -in- Charge
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.as per direction of Engineer -in- Charge
4.2.5 : Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:3:6 ( 1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size) etc.as per direction of Engineer -in- Charge
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)as per direction of Engineer -in- Charge
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more etc.as per direction of Engineer -in- Charge
13.9.1 : Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.12 mm cement plaster etc.as per direction of Engineer -in- Charge
D JAYACHANDRAN
Bidder Name
KUNNATH CONSTRUCTIONS
D JAYACHANDRAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_451421.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .