Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹9,998
Closing Date
10 Aug 2026, 6:00 pm
add.city.engineer (amc met/Hospital, East Zone)
Repairing Maintainance and other related works in Different Municipal Buildings, Anganvadis at different places in Old Gomtipur Area of Gomtipur Ward of EAST ZONE in AMC. (A.R.C.)
326081
EZ 03/34-2026-27
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹9,998
20 Jul 2026
20 Jul 2026
20 Jul 2026
10 Aug 2026
20 Jul 2026
2 TOTAL ESTIMATED COST ₹
3 EARNEST MONEY ₹
In DEMAND DRAFT FROM
BANK ACCEPTABLE TO THE AMC
4 VALIDITY PERIOD 120 DAYS FROM THE DATE OF
OPENING OF THE TENDER.
5 SECURITY DEPOSIT 5% OF SANCTIONED TENDER AMOUNT
IN FORM OF CASH / DEMAND DRAFT /
BANK GUARANTEE.
6 RETENTION MONEY 2% FROM EACH RUNNING BILL WILL BE
RETAINED AND WILL BE RELEASED
AT THE TIME OF FINAL BILL
7 TIME ALLOWED FOR
COMPLETION OF THE WORK 12 Months
FROM THE DATE OF WRITTEN
ORDER TO COMMENCE WORK
8 TENDER FEE Rs. -- ₹ 900 TENDER CLASS -- E2
In DEMAND DRAFT / PAY ORDER FROM
BANK ACCEPTABLE TO THE AMC
Contractor's Name :-
Contractor's Address :-
Contractor's Register Number / Renewal Year / class :-
Contractor's Bank, Branch Name :-
Bank Account Number :- Banks MICR Number-
9 DOWN LOAD DATES FOR
TENDER FROM WEB SITE - TO 10-Aug-26
www.nprocure.com
www.amc.nprocure.com
10 LAST DATE OF SUBMISSION
OF E-TENDER ON LINE 10/Aug/26 6.00 PM
11 DATE ON OR BEFORE WHICH THE
TENDER FEE,EMD,DOCCUMENTS 11/Aug/26 4.00 PM
MUST REACH THE OFFICE
11 DATE OF OPENING OF
E- TENDER ON LINE 11-Aug-26 5.00 PM
12 LOCAL COMPETITIVE BIDDING
-- TENDER CLASS -- E2
13 MODE OF SENDING THE ONLINE
TENDER EMD, TENDER FEE AND OTHER
ESSENTIAL DOCCUMENTS IN SEALED
COVER BY REGISTERED POST OR IN
CONDITIONAL TENDER WILL BE
REJECTED OUTRIGHT.
14 DESCRIPTION ESSENTIAL TO NAME OF THE WORK.
BE MADE ON SEALED COVER TENDER No.--
DATE OF RECEIVING TENDER BY
15 MODE OF QUOTING RATES IN PERCENTAGE RATE IN FIGURES AS
SCHEDULES OF RATES. WELL AS IN WORDS.
TENDER SHALL BE SUBMITTED IN
DUPLICATE.(EXCEPT E-TEDER)
NAME OF WORK --
Repairing Maintainance and other related works in Different Municipal Buildings,
Anganvadis at different places in Old Gomtipur Area of Gomtipur Ward of EAST
ZONE in AMC. (A.R.C.)
TENDER NOTICE No. -- 3 TENDER No. --
LOCAL COMPETITIVE BIDDING -- TENDER CLASS -- E2
Time Limit (Months)
of e-Tender from --- to 10-Aug-26
Last Date of reciveing of e-Tender --- 10-Aug-26 6.00 PM
Last Date of reciveing of EMD --- 11-Aug-26 4.00 PM
Opening Date of e-Tender --- 11-Aug-26 5.00 PM
The Municipal Commissioner of Ahmedabad Municipal Corporation, invites Percentage
rate tender for the above works from the contractors registered with Municipal
Corporation of Ahmedabad in Class E2 or registered with Government of Gujarat
in Class E2 or from contractors registered in similar class with any other
State Government of India who have the financial capability and technical ability to
carry out the work. Also Private pre qualified reputed experience builders can also
apply. Experience in carrying out works of comparable nature is essential.
Essential Tender documents Including the tender Fee, EMD shall be accepted by
Asst. Manager East Zone, East - Zone Office Harubhai Maheta Bhavan Viratnagar
Char Rasta -- Nikol Ahmedabad - 382415 On or before = 10-Aug-26 6.00 PM
Tender Fee and E.M.D.Submitted on or before 11-Aug-26 4.00 PM
will be accepted in the form of Pay Order or Bank Guarantee or Demand Draft from
bank acceptable to the Corporation Only.
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
SPECIAL GENERAL INSTRUCTIONS TO TENDERERS
NAME OF WORK --
Repairing Maintainance and other related works in Different Municipal Buildings,
Anganvadis at different places in Old Gomtipur Area of Gomtipur Ward of EAST
ZONE in AMC. (A.R.C.)
1 The work is to be completed in all respects within 12 months reckoned
from the date of written order to commence the work.
2 The tender shall be valid for acceptance for a period of 120 days from the date of
opening of tenders.
3 Each tender must be accompanied by a receipt for a deposit as Earnest Money
of ₹ 9998.00 in Pay order, Demand Draft, Bank Guarantee or Cheque from
bank acceptable to the AMC.
4 Tender deposit is accepted as detailed out in Ahmedabad Municipal Corporation,
Section B-1, Engineering Department, percentage Rate Tender and General condition's
of Contract for Works here in afterwards referred as Form- B-1.
5 An overall schedule of the "Work Plan "of the project based "Network Technique
Method" Programmer Evaluated and Review Technique (PERT) / Critical Path
Method (CPM) for appreciating his method of planning, scheduling and control of
project execution should be submitted by the contractor.
6 After the demand of R.A. Bills by contractors, work shall be verified by the Engineer in
charge of AMC or the Architect / Consultant will give his certificate, whether the work
has been executed according to the standard norms and approved designs and
the workmanship is of acceptable quality. Also the progress of work shall be
according to the construction programme approved by AMC or the Architect
/Consultant. On recommandations of Engineer in charge of AMC or Architect /
consultant , R.A. Bills will processed for the payment.
7 2% FROM EACH RUNNING BILL WILL BE RETAINED AND SHALL BE RELEASED
AT TIME OF FINAL BILL
8 In the circumstances of dispute, the decision of Add. City Engineer ( Zones) shall
be final & bound for the contractor. In case, in the detailed specifications of materials
and code of practice specifications of Index Nos. are found missing thus they must be
referred to the of specification of materials and code of practice.
PAYMENT CONDITIONS TO CONTRACTOR
9 Without proper Refilling, compaction and watering no payment shall be given
to contractor for excavation, refilling and or earth filling items.
10 Contractor shall have to submit a demand letter for running bill as well as final bill..
11 If progress of work is not in proportion to the time limit, otherwise penalty will be
MATERIAL PROCUREMENT
12 All material like Cement, M. S. Bars / Tor steel reinforcement and structural
steel, Bitumen etc. required for this work shall be procured by the contractor from
the open market.
13 No difference in rates of cement and steel prevailing in the market in Ahmedabad at a
later date shall be paid /Recovered by A.M.C.(as the case may be) to / from contractor
for the procurement of Cement and Steel from open market in Ahmedabad. Contractor
will not be paid for any transport, handling & storage expenses separately and he
should quote for the works accordingly.
14 Test certificate for all materials like Cement , Steel, Bitumen and other important
materials shall be obtained and submitted by contractor. Contractor shall have to
produce test certificates for all procurement of Cement , Steel, Bitumen and other
important materials
INSTRUCTION TO THE TENDERER
15 ALL INSTRUCTIONS TO TENDERERS, SPECIAL INSTRUCTIONS FOR
CONTRACTORS, DOCUMENTS, RULES FOR GRANT OF ADVANCES, CLAUSE FOR
ARBITRATION, GENERAL SPECIFICATIONS, PROJECT INFORMATION
GENERAL,PAYMENT CONDITION TO THE CONTRACTOR, DEFINITION OF TERMS
EARNEST MONEY, SUBMISSION OF TENDERS, GENERAL RULES AND
DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS TERMS AND
CONDITIONS OF CONTRACT AS PER FORM B-1. ETC. SHALL BE AS PER
STANDARD PERFORMA OF AHMEDABAD MUNICIPAL CORPORATION OF
ENGINEERING DEPARTMENT AND SHALL BE APPLIED TO THIS TENDER
CONTRACTOR MUST HAVE THIS DOCUMENT AND SHALL BOUND FOR THE SAME.
I HAVE READ AND VERIFIED ABOVE DOCUMENT AS WELL AS P.W.D.
GENERALTECHNICAL SPECIFICATIONS , CONDITIONS, CLAUSES,
INSTRUCTIONS ETC. AND AGREE TO ABIDE BY THEM.
I HAVE ALSO GONE THROUGH CONDITIONS AND CLAUSES OF FORM B -1
AND AGREE TO ABIDE BY THEM.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE
ITEMS AND AGREE TO ABIDE BY THEM.
IN THIS TENDER THERE ARE MANY POSSIBILITIES OF ADDITIONAL AND
ALTERATION ITEMS HENCE MANY ITEMS ARE LIKELY TO BE DROPPED OR THERE
QUANTITIES ARE LIKELY TO BE VARY UP TO ANY EXTENT AND HENCE FOR
THIS CONTRACTOR WILL NOT CLIAM FOR ANY EXTRA AMOUNT OR
COMPENSATION FOR THE SAME I AGREE TO ABIDE BY THEM.
GENERAL RULES & DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS TERMS
AND CONDITIONS OF CONTRACT AS PER FORM B-1. ETC. SHALL BE AS PER
STANDARD PROFORMA FOR TENDER OF AHMEDABAD MUNICIPAL CORPORATION
OF ENGINEERING DEPARTMENT AND SHALL BE APPLIED TO THIS TENDER .
CONTRACTOR MUST HAVE THIS DOCUMENT.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
16 DECLARATION FORM :- TENDER No
Name of the work for which the Tender is under consideration-
Repairing Maintainance and other related works in Different Municipal Buildings,
Anganvadis at different places in Old Gomtipur Area of Gomtipur Ward of EAST
ZONE in AMC. (A.R.C.)
1 I / We hereby declare that I / We have visited the above site & fully acquainted my self
/ our selves with the local situation regarding materials, labour and other factors
pertaining to the work before submitting this tender.
2 I / We hereby declare that I / We have carefully studied the conditions of
contract, sections and other tender documents of this work and agree to execute
the same accordingly.
3 I / We hereby declare that I / We shall not charge any costs towards the visit of site
for preparing the tender for submission accordingly.
4 I / We hereby declare that My / Our near relatives are not working in A.M.C. as
City Engineer, Add. City Engineer, Dy. City Engineer, Asst. City Engineer,
Assistant Engineer, Add. Assistant Engineer, Technical Supervisor, Assistant
Manager, Accountant, Store Keeper or any such category. If yes, then, the names
should be submitted.
Dated Signature Of Contractor
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
GENERAL SPECIFICATION
1 The work shall be completed with in 12 months time limit.
2 The details of reinforcement of R.C.C. work shall be as per design and instruction of
Add. City Engineer or his representative and his order will be considered final. The
contractor shall have to maintain account of steel, cement and other materials, that
may be brought by him on site. This account shall be regularly maintained and kept
open for inspection by municipal staff. Watering of all the items shall be
done as per instructions. Mixing of concrete shall be done by concrete mixer
3 Arrangements of bringing vibrator for R.C.C. works if required shall have to be made by
the contractor othervise concrete work shall not be allowed.
4 The contractor shall remain responsible for workman's compensation of any accident
that may occur. The contractor shall arrange for lights at night and fencing and
security guard and shall be responsible for any damage of life and property if any
happen, during the execution of work in case of dispute for unseen or over looked
items, the decision of the Add. City Engineer or his representative shall be final. The
contractor shall have to clean all rubbish on completion of work and hand over the
building with final finishing as directed. All the rejected materials shall be removed
from site with in 24 hours by contractor at his risk and cost.
5 For mixing mortar either for masonry or for plaster; or for any other purpose contractor
shall have to prepare trough of bigger size and mix the mortar in the required
proportion in case he shall be allowed to mix the mortar either on solid floor or
any finish surfaces.
6 The contractor shall have to make his own arrangement for water required for the work
7 If any extra item crops up during the progress of work, the same shall be carried out
by the contractor and he shall be paid at the rate fixed by Add. City Engineer or
his representative as per the rate analysis based on current market rates and as per
prevailing circular of AMC..
8 If in the interest of the Corporation it is necessary to change either any site or the
design of the proposed work, the contractor shall carry out the same at his quoted rates
without charging any extra and the contractor will have to carry out the works and he
will be paid at the rates quoted by him in the tender and no claim for extra charges
9 The cubical contents of the cement bag shall be taken as 1.25 cft. or 0.035 cmt. / bag
and the contractor shall have to prepare the measure box according to this
10 Retention money at the rate of 2% shall be deducted from every running bill of the
contractor and which will be paid at the time of final bill.
11 Contractor will be fully responsible for compliance of the various provision
under contract Act. 1970 and rules framed there under.
12 The tender for the work shall remain valid for a period o 120 days from the date of
opening of the tenders for this work and that the Tenderer shall not be allowed
to withdraw or modify the offer on his own during this period. If any Tenderer withdraws
or makes any, modifications or additions in the terms and conditions of tender. His
tender will not be acceptable to the Municipal Corporation. The Municipal
Corporation ,without prejudice to any right or remedy be at liberty to forfeit the Earnest
13 No Materials shall be supplied by A.M.C. The contractor have to make their
own arrangement for procurement of materials from open market. But the
contractor shall have to give necessary test certificates for different materials as
per relevant I.S. code before using the same in the work at his cost in presence of AMC
14 As per circular No MGR 2176(96),2418 (ii)GHH dated 31-3-77 issued by Government
of Gujarat contractors are requested to procure their quarry materials required
for construction work through legal sources i.e. Only from the quarry lease. holders
permit holder or middleman who satisfies the contractor as the legality of the
source of purchase by him on these materials.
15 If the work is not carried out within the specified time lim
12 months from the date
order to start the work. Penalty shall be recovered at the rate of 10% on the
amount of the non completion of the remaining work for delay in allotted,/
extended time limit and shall be recovered from the immediate bills payable to the
16 The contractor shall have to take labour License of the work as per Labour act.
The contractor shall have to follow Child Labour act. The Tenders are to be
submitted in duplicate except E-Tender without which the tenders are liable to be
rejected. Conditional tender will not be accepted.
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
TECHNICAL SPECIFICATIONS FOR MATERIALS AND ITEMS
NAME OF WORK -- Tender No.
Repairing Maintainance and other related works in Different Municipal Buildings,
Anganvadis at different places in Old Gomtipur Area of Gomtipur Ward of EAST
ZONE in AMC. (A.R.C.)
GENERAL AND STANDARD TECHNICAL SPECIFICATIONS FOR WORK.
1 In the specifications “as directed” / “ approved shall be taken to means "'directed” /
“approved” by the Engineer-in-charge.
2 Wherever a reference to any Indian Standard appears in the specifications, it shall be
taken to mean as a reference to the latest edition of the same inforce on the date of
3 In“Mode of Measurement”in the specification wherever a dispute arises in the absence
of specific mention of a particular point or aspect, the provisions on these particular
points or aspects in the relevant Indian Standards shall be referred to.
4 All measurements and computations, unless otherwise specified, shall be carried out
nearest to the following limits:
(i) Length, width and depth (height) 0.01 meter.
(ii) Areas 0.01 Sq. Mt.
(iii) Cubic Contents 0.01 Cu. Mt.
In recording dimensions of work, the sequence of length, width, and height (depth) or
thickness shall be followed.
5 The distance which constitutes lead shall be determined along the shortest practical
route and note necessarily the route actually taken. The decision of
the Engineer-in-charge in this regard shall be taken as final.
6 Where no lead is specific, it shall mean “all leads".
7 Lift shall be measured from plinth level.
8 Up to “floor two level” means actual height of floor (Maxi. 4 M) up to 3 Mt. Above plinth
9 Definite particulars covered in the items of work, though not mentioned or included in it
specifications shall be deemed to be included therein.
10 Reference to specifications of Materials as made in the detailed specification of the
items of works is in the form of a designation containing them number of
the specification of the Materials and prefix ‘M’ e.g. "M-5"
11 Approval to the samples of various Materials given by the Engineer in charge shall not
absolve the contractor from the responsibility of replacing defective Materials brought
on site or Materials used in the work found defective at later date. The contractor
shall have no claim to any payment or compensation whatsoever on accounts any
such Materials being rejected by the Engineer-in-charge.
12 The contract rate of the item of work shall be for the work completed in all
13 No collection of Materials shall be made on site before it is got approved
from the Engineer-in-charge.
14 Collection of approved Materials shall be done at site of work in a systematic manner.
Materials shall be stored in such manner as to prevent damage ,deterioration of
intrusion of foreign matter and to ensure the preservation of their quality and fitness for
15 Materials , if
and when rejected by the Engineer - in - charge, shall be immediately
removed from the site of work.
16 No Materials shall be stored prior to, during and after execution of a structure in such
a way as to cause or lead to damage or overloading of the various components of
17 All works shall be carried out in a workman like manner as per the best techniques
for the particular item.
18 All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the work during execution shall kept
in sufficient numbers and in good working condition on the site of the work.
19 The mode, procedure and manner of execution shall be such that it does not cause
damage or overloading of the various components of the structure during execution or
after completion of the structure.
20 Special modes of construction not adopted in general Engineering practice, if
proposed to be adopted by the Contractor, shall be considered only if the contractor
provides satisfactory evidence that such special mode of construction is safe, sound
and helps in speedy construction and completion of work to the required strength and
quality. Acceptance of the same by the Engineer- in- charge shall not, however,
absolve the contractor of the responsibility of any adverse effects and consequence of
adopting here in the course of execution or completion of the work.
21 All installations pertaining to water supply and fixtures thereof as well as drainage
lines and sanitary fittings shall be deemed to be completed only after giving satisfactory
tests by the contractor.
22 The contractor shall
be responsible for observing the rules and regulations imposed
under the “ Minor Minerals Act ”, and such other laws and rules prescribed
by Government from time to time.
23 All necessary safety measures and precautions (including those laid down in
the various relevant Indian Standards) shall be taken to ensure the safety of men,
Materials and machinery on the works as also of the work itself.
24 The testing charges of all Materials shall be borne by the Contractor.
25 Approval to any of the executed items for the work does not in any way relieve
the contractor of his responsibility for the correctness, soundness and strength
of the structure as per the drawings and specifications.
26 I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATION FOR THE ITEMS AS
PER STANDARD P.W.D. TECHNICAL SPECIFICATION FOR THE ITEMS AND
AGREE TO ABIDE BY THEM. (ALSO AVAILABLE ON AMC WEB SITE)
27 IN CASE OF WHERE THERE IS NO TECHNICAL SPECIFICATION FOR THE
ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE ENGINEER IN
CHARGE SHALL BE FOLLOWED. AND FOR THE SAME I AGREE TO ABIDE BY
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
SUMMARY OF COST AND
SCHEDULE OF QUANTITIES AND RATES
_ SUMMARY OF COST AND RECAPITULATION SHEET
_ SCHEDULE OF QUANTITIES & RATES
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
1 The schedule of quantities and rates are to be read for the purpose of pricing in
conjunction with instructions to tenderers, technical specifications, drawings and
general conditions of contract for civil works.
2 The Price quoted in the summary of costs; sheet of schedule of quantities and
rates shall be in all inclusive value for the work described including all costs and
expenses which may be required in and for the execution of the work described
together with all general risks, liabilities and obligations set forth or implied in the
document on which the tender is based.
3 The quantities furnished are approximate. In the event of actual quantities varying
from those furnished herein below or items deleted or added, the Rates quoted for the
entire work shall remain firm and no extra claims in this respect will be
entertained. The payment shall be made based on the actual quantities in the
4 All works shall be carried out strictly as per detailed specifications whether actually
specified or not. If not specified, as per directions of Engineer in charge
5 Rates quoted by Tenderer shall be firm even if the contract is split. If tenderer does not
agree to keep his quoted Rates valid under such a condition he shall clearly state so in
6 Rates and the total amount entered in the summary of cost sheet of schedule
6 Rates and the total amount entered in the summary of cost sheet of schedule
of quantities and rates shall be written in ink and shall be entered both in figures
7 If Tenderer need any clarifications, they should obtain the same in writing
from owner/ Engineer. No notice will be taken of any verbal discussion in such matter.
1 Rate and amount shall be written both in figures and words.
2 Refer Schedule of quantities for items of Works & Estimated Quantities.
3 Plans are available with Asst. City Engineer. Tenderers are instructed to see
them during office hours in his office before quoting tender.
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
GENERAL TENDER CONDITIONS
1 After sanctioning of tender, a work order will be issued to the contractor. In response
contractor shall have to arrange for Security Deposit within 10 days for works up to
lacks of tender amount and 15 days for works above 10 lacks of tender amount. The
time limit shall be counted after 10 days for works up to 10 lacks of tender amount and
15 days for works above 10 lacks of tender amount after issuance of work order. The
contractor shall be fined 4% of interest per year for delay in submission of S.D. and
shall be deducted from contractor’s bill. Security Deposit of 5% of sanctioned tender
amount shall be deposited by pay order / demand draft / cheque or Bank Guarntee of
nationalized bank/scheduled bank only. Contractor shall have to sign contract paper
2 In case of earnest money cheque bounce back, contractor’s tender shall treated as
cancelled and the contractor shall not be given any tender, offer, quotation work in
AMC for one year.
3 Muni. Commissioner shall have right to accept, reject the tender as well as the rate at
which tender to be accepted and awarded.
4 Specification of tender items shall be as per PWD manual in general / AMC’s norms
and B-1 form conditions shall be applicable. In case of controversy, Addl.C.E.’s
decision shall be final.
5 If watering is not done as per norms/specifications or if debris is not removed within
hours, then without notice, AMC shall have a right to execute that work at contractor’s
risk and the amount shall be recovered from the bill.
6 Contractor shall have to work in such a system that there shall be no damage to any
service line of electric, telephone, gas, any type of service cable, drainage or water
lines etc. In case of damage to service line, the contractor will be responsible for
damage and shall have to repair/reinstate the damaged existing services. The
contractor shall have to safe guard the labours against any accident or damage of lives
or public property if any.. In case of police complain, Contractor shall be held
responsible for negligence. In case of soil/land collapse, contractor shall be held
responsible for not supporting the soil with shoring, strutting and shuttering.
Contractor shall safeguard the labour before allowing labour to enter in excavated pit or
other hazardous site. In case of accident to labours, contractor shall be held
responsible for police complain against him. AMC’s staff will not be responsible for any
7 Contractor shall take insurance of his all labour and supervisory staff.
8 Only registered contractor shall quote the tender, if the contractor is registered with
government then they shall have to apply for registration in AMC within 180 days from
the date of work order.
9 AMC’s general condition and Form-B-1 shall be binding to the contractor B-1 Form is
put up on AMC’s web site.
10 Payment of running bill, final bill shall be as per policy of AMC in force at time of
11 Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
12 As per site conditions/requirement of site, there shall be increase or decrease in tender
item quantities. In such case contractor shall not have right to any price rise. In case of
decrease in any tender item quantity, contractor shall not ask for compensation.
13 If any construction material brought to site by contractor is not as per specification, or
any inferior quality material brought to site, then such rejected material shall be
removed from the site within 24 hours, otherwise AMC can throw away such material at
any place and recover the amount for such removal work from contractor bill. In this
case contractor shall not be entitled for compensation.
14 Cost of testing of material shall be borne by the contractor. He shall provide vehicle for
taking material / staff from site to testing laboratory / manufacturing site and contractor
shall be bear the cost of transportation of staff and material.
15 Contractor shall work as per labour Act. Contractor shall not be given any payment if
labour act rules are not followed or insurance of labour is not taken for work.
16 Contractor shall deposit the material on site in such a way that it should not become
obstruction to any one in any way.
17 All type of taxes(e.g. sales tax, surcharge, vat etc) to be borne by the contractor.
18 If asked by AMC Engineering staff, contractor shall take photograph of site of work /
before start of work, during work and after the completion of work, with digital camera
and deposit to AMC office or transfer photograph from camera to AMC computer. No
additional cost shall be paid.
19 In case of cancellation / rejection of tender, contractor shall not be entitled for any
compensation or right.
20 In case of extra item, AMC circular no. 9 Dt.08.05.12 shall be follwed in general If item
is not available in SOR, then market rate shall be derived by the Eng. dept by rate
analysis. Contractor shall not ask for the rates as per his rate analysis. This should be
clearly understood and taken in to consideration while quoting the tender by the
21 During execution of work, contractor shall take safely measures like protection by
ropes, drums, danger sign boards, plastic strips, bamboos, wooden poles etc as per
requirement & instruction of Egg.- in –charge. In case of accident due to lack of
protection, contractor shall responsible for police complains, compensation etc AMC
staff shall not be held responsible for contractor’s negligence.
22 If instructed by AMC officials, contractor shall have to keep daily progress register and
get it signed by Ass. City Engineer. Contractor shall maintain record of daily No.of
labours employed, work done. If rectification work is not done by contractor within
days, the contractor shall be finned Rs.250/- per day for delay & shall be recovered
from the contractors bill.
23 Contractor shall not be entitled for any type of compensation or right for the
cancellation of tender or tender items by any means.
24 Deduction from bills shall be done as per rules prevailing or the rules which shall come
in to force, by State or Central Govt.
25 1% amount shall be deducted for labour welfare fund as per state Govt. order.
26 All the above conditions shall over rule the conditions given in Form B-1.
27 Specifications are placed on AMC website www.egovamc.com for tender items, PWD
manuals should be followed in general.
28 Contractor shall have to register the work as per labour act & as per building safely act,
1906 with, Dy.Director building safety act., Shram Bhavan, 5th floor labour
commissioner office, Khanpur, Ahmedabad.
29 In case, at the time of submitting tender copy in duplicate, if single copy of tender bid is
quoted by contractor then it shall be treated as cancelled at the time of opening (
except E-Tendering).
30 At the time quoting tender, if tender fee or EMD is not deposited then tender shall be
treated as cancelled at the time of opening of tender.
31 In case of the bank detail are not given then EMD return procedure shall be delayed.
32 In case of water pipe line work, If materials are not available from AMC central stores,
then the time limit delay of providing materials by central stored shall be given to the
33 In case of road grouting work tender, if at the time of resurfacing paver work, If paver
gets stucked in grouting work then contractor shall have to rectify the poor grouting
work without any cost.
34 Before quoting the tender contractor should know that, he has seen the site
understood the item of works, site conditions. He should be in a positions to provide
labours at the time of festivals like Holi, Diwali, Navratri, Marriage season, rainy season
or any other time of the year Contractor cannot say that he has no labours due to
35 Running bill amount should be restricted to 90% sanctioned tender amount and
remaining 10% amount shall be paid in final bill after completion of work..
I have read all above conditions carefully and ready to work as per above conditions.
Contractor’s Name and seal Add. City Engineer
Mobile No. EAST ZONE
Address Ahmedabad Municipal Corporation
ENGINEERING DEPPARTMENT
Repairing Maintainance and other related works in Different Municipal Buildings,
Anganvadis at different places in Old Gomtipur Area of Gomtipur Ward of EAST ZONE in
RECAPITULATION SHEET Months
Sr.No DESCRIPTION AMOUNT
MAIN ESTIMATED TENDER COST
C.F. THIS TOTAL FROM TENDER ABSTRACT SHEET --
AMOUNT ( A ) IN ₹.
(1) WRITE HOW MUCH PERCENTAGE HIGHER
OR LOWER IN FIGURES _______________ % LOWER / HIGHER
(Strikeout which ever is not applicable)
(2) WRITE HOW MUCH PERCENTAGE HIGHER or LOWER IN WORDS -
NT LOWER/HIGHER
(Strikeout which ever is not applicable)
(3) AMOUNT ( B ) IN ₹.
AMOUNT (C) IN ₹.
IF PERCENTAGES QUOTED IS HIGHER THAN ADD AND SUM IT. ( i.e. C=A+B) OR IF
PERCENTAGES QUOTED IS LOWER THAN DEDUCT AND SUBSTRATE IT. ( i.e. C=A-
(4) WRITE TOTAL TENDER AMOUNT IN WORDS - ₹
Dated Signature Of Contractor ADD. CITY ENGINEER
With Seal EAST ZONE
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPPARTMENT
Name Repairing Maintainance and other related works in Different Municipal Buildings,
Anganvadis at different places in Old Gomtipur Area of Gomtipur Ward of EAST ZONE in
:- AMC. (A.R.C.)
Sr.No. DESCRIPTION QTY. RATE PER AMOUNT
1 Excavation for foundation upto 1.5 m depth
including sorting out and stacking of useful
materials and disposing off the
excavated stuff upto 50 Meter lead.(A) Loose
a Up to 1.5 mt.depth 15.00 115.92 Cu.M.
b 1.5 to 3.0 mt.depth 5.00 128.52 Cu.M.
2 Providing and laying cement concrete 1:5:10
(1- Cement : 5- Coarse sand : 10- hand
broken stone aggregates 40 mm nominal size) 5.00 2492.51 Cu.M.
and curing complete excluding cost of
(A) Foundation and Plinth
3 Providing and laying cement concrete 1:3:6 (1-
Cement : 3- coarse sand : 6- hand broken
stone aggregates 40 mmnominal size) and 5.15 2976 Cu.M.
curing complete excluding cost of formwork in
Foundation and Plinth
4 Filling available excavated earth (excluding
rock) in trenches. plinth, sides of foundations
etc. in layers not exceeding 20 cm. in depth 25.00 129.1 Cu.M.
consolidating each disposited layer by
ramming and watering.
5 Brick work using common burnt clay building
bricks having crushing strength not less than
35 kg./Sq.Cm. in foundation and plinth in
Cement Mortar 1:6 (1- Cement : 6 -fine
sand)(B) Conventional
a (a) in foundation & Plinth 15.00 3981.21 Cu.M.
b (b) Super Structure (Up to floor Two Level) 35.00 4253.46 Cu.M.
c Extra for brick work in superstructure above
floor two level Item No. 5(a) , (B) per floor
Conventional per cu.m
6 (i) Half brick masonry in common brunt clay
building bricks having crushing strength not
less than 35 Kg/Sq.Cm. in Cement mortar 1:4 25.00 593.9 Sq.M.
(1- Cement : 4 -coarse sand ) in foundation
and plinth (B) Conventional
7 Providing TMT Bar FE 500D reinforcement for
R.C.C. work including bending, binding and 205.00 77.46 Kg.
placing in position complete upto floor two
8 Providing and laying polished Kota stone slab
flooring over 20mm (Average) thick base of
cement mortar 1:6 (1-cement : 6-coarse
sand) or L.M. 1.1.5 (1-Lime putty :1.5 -
coarse sand) laid 45.00 992.83 Sq.M.
over and jointed with grey cement slurry
mixed with pigment to match the shade of
slab including rubbing and polishing etc.
complete (A) 25mm thick
9 Providing and laying polished kota stone slab
25mm thick in risers of steps,skirting Dedo
and pillars laid on 10mm thick cement mortar
1:3 (1- Cement : 3 coarse sand) and jointed 10.00 1176.03 Sq.M.
with gray cement slury mixed with pigment to
match the shade of slab including rubbing and
polishing etc. complete.
10 Providing and laying white glazed tiles 6mm
thick in skrting risers of steps and dedo on
10mm thick cement plaster 1:3 (1-cement : 3- 125.00 1044.23 Sq.M.
coarse sand) and jointed with white cement
11 Providing and laying coloured glazed tiles of
the size 300 mm x 200 mm x 8 mm / 300 mm
x 450 mm x 8 mm in skirting, risers of steps 80.00 1426.95 Sq.M.
and dedo on 10 mm. thick cement plaster
1:3 (1cement : 3 coarse sand) & jointed with
white cement slurry.
12 Providing and laying marble stone slab flooring
over 20mm (average)base of cement mortar
1:6 (1-cement : 6 coarse sand) or L.M.
1:1.5(1- lime putty : 1.5 - coarse sand) laid 8.00 2194.63 Sq.M.
and jointed with
gray cement slurry including rubbing and
polishing complete. (A) Marble slab 25mm
13 Providing and laying Vitrified tiles 8 to 10 mm
thick , 24'' x 24'' in flooring treads of steps
and landing laid on a bed of 12mm thick 25.00 1062.5 Sq.M.
cement mortar 1:3 (1-cement : 3-coarse
sand) finishing with flush pointing in white
14 Providing and layingCeramic tiles 6mm thick in
skrting risers of steps and dedo on 10mm
thick cement plaster 1:3 (1-cement : 3-coarse 5.00 1028.11 Sq.M.
sand) and jointed with white cement slurry
15 Providing & Laying 18 MM Thick mirror polish
granite flooring for counter ,stair -riser ,tread
,skirting ,dedo etc.machine cut or chiselled on 10.00 1347.46 Sq.M.
bed of cement slurry incl.moulding etc.comp
as per instruction of engineer in charge(N S)
16 Providing & Fixing 20 mm Mirror Polished
Decorative Granite Board with Computerised
Golden Letters Discription & Logo ,border line
if required as per instruction of engg in charge 2.00 2600 Sq.M.
to M.S.Frame structure for Inaugaration &
Puplik Handover Function(N/S)
17 Chicken wire mesh 16 x24 10.00 35 Rmt.
18 Providing 20 mm thick double coat mala
cement plaster on interior brick / concrete
work for plastering comprising of base coat of
12 mm thick cement plaster in cement mortar
(1 Cement : 4 coarse sand) in rough finishing 25.00 269.78 Sq.M.
and 8 mm thick top coat of cement mortar 1:2
Cement : 2 Coarse sand) finished with trovel
including scaffolding curing etc. complete.
19 Providing 10mm thick cement plaster in single
coat on brick/concrete walls for interior
plastering upto floor two level and finished 80.00 114.66 Sq.M.
even and smooth in (ii) Cement mortar 1:4 (1-
cement :4-sand)
20 Extra over items of 20 mm and 10 mm thk.
plaster for finishing with a floating coat of neat 10.00 47.73 Sq.M.
21 Providing & laying Stone chips Plaster with
/ without grooves for making panels
incl.backing coat of plaster in C.M.(1:3) in
grey cement Asper dir.Of consultants.(N.S.)
22 White washing with lime on wall surface (two
coats) to give an even shade including
thoroughly booming the surface to remove all 20.00 12.29 Sq.M.
dirt, dust; mortar drops and other foreign
23 Extra over item no. 22 for every subsequent
coat of white washing with lime on wall 50.00 5.67 Sq.M.
24 Wall painting (two coats) with plastic emulsion
paint of approved brand and manufacture on
undecorated wall surface to give an even
shade including throughly brushing the 50.00 78.44 Sq.M.
surface free from mortar droppings and other
and sand papered smooth.
25 Finishing wall with water proofing cement
paint of on wall surfaces (Two coats) to give
an approved brand and manufacture and of
required shape even shade after thoroughly 75.00 56.87 Sq.M.
brushing the surface to remove all dirt and
remains of loose powered materials.
26 Applying two coats of putty & two coats of
primer of approved brand and manufacture on
new wall surface to give an even shade
including thoroughly brushing the surface free
from mortar dropping and other foreign
matter and sand papered smooth.
27 Finishing wall with weather proof exterior
emulsion paint on wall surface (two coats) to
give an required shape even shade after 50.00 113.4 Sq.M.
thoroughly brushing the surface to remove all
dirt, and remains of loose powdered
materials.etc complete
28 Applying priming coat over new steel and
other metel surface after and including
preparing the surface by throughly cleaning,
oil,grease, dirt and other foreign matter and
scoured with brushes fine steel wood, scrapers
and sand paper with ready mixed priming
29 Painting two coats (excluding priming coat) on
new steel and other metal surface with enamel
paint, brushing, interior to give an even shade
including cleaning the surface an even shade 50.00 86.94 Sq.M.
including cleanicn the surface of all dirt, dust
and other foreign matter.
30 Appliying priming coat over new wood and
wood based surface after and including
preparing the surface by throughly cleaning
oil, grease, dirt and other foreign matter, sand 2.00 26.78 Sq.M.
papering and knotting. (C) Ready mixed paint
brushing priming for enamel
31 Painting two coats (excluding priming coat) on
new wood and wood based surface with
enamel paint, interior to give an even shade
including cleaning the surface of all dirt, dust
and other foreign matter sand papering and
32 Providing and fixing Urinal or approved quality
including conecting the Urinal with waste pipe
, tap etc. complete.(A) White earthenware flat 2.00 1026.01 No.
back or corner type size 430mm x 260mm x
33 Providing & Fixing Angle cock of "Ess Ess"
Trend series or equivalent standard make
as approved by engg.in charge all 2.00 675 No.
complete.(N.S.)
34 Providing and fixing washbasin with single
hole for pillar tap with C.I. or M.S. brackets
painted white including sutting holes and
making good the same but excluding 2.00 1400.18 No.
fittings.(A) Vitreous China:(ii) Flat Back
washbasin 550 mm x v
400mm size (i) In white colour
35 Providing and fixing C.P. brass towel rail
comlete with C.P. brass brackets fixed to
wooden plugs with C.P. brass scews.(B)
600mm x 20mm size.
36 Providing and fixing screw down bib taps of
following size.(A) Brass screw down bib tap 10.00 184.98 No.
polished bright. (i) 15mm dia.
37 Providing and fixing pillar tap, capstan head,
screw down high pressure with screws, shanks 1.00 305.67 No.
and back nuts. (i) 15mm dia.
38 Providing and fixing water closet squatting Pan
(Indian type W.C. Pan) size 580mm
(Earthwork, bed concrete, foot reste and trap 10.00 926.1 No.
to be measured and paid for separately) (A)
Vitreous China.(I)
Long pattern = White colour
39 Providing and fixing 100mm size P or S trap
for water closet squatting pan including
jointing thetrap with the pan and soil pipe in 5.00 311.85 No.
cement Mortar1:1 (1-Cement : 1-Fine
sand)(A) Vitreous
40 Providing and fixing wsh down water
closet(European type, W.C. Pan) with integral
P or S trap including jointing the trap with soil
pipe in Cement Mortar 1:1 (1-Cement : 1-fine 2.00 1290.8 No.
sand) (Seal and cover to be measured and
paid for separately)(A) vitreous China Pattern
:(i) in white colour
41 Providing laying and jointing in true line and
level 15mm dia. U.P.V.C. Pipe ( SCH- 40) for
cold water including fittings as approved by
Engineer In Charge. Pipe shall be fixed on the
wall with the help of clamp at every two metre 10.00 71.93 Rmt.
C/C or shall be concealed as directed including
necessary fittings etc. including testing of pipe
and joints and fixing the same with adhesive
solvent, including cost of all materials.
42 Providing laying and jointing in true line and
level 25mm dia. U.P.V.C. Pipe ( SCH- 40) for
cold water including fittings as approved by
Engineer In Charge. Pipe shall be fixed on the
wall with the help of clamp at every two metre
C/C or shall be concealed as directed including 8.00 90.93 Rmt.
necessary fittings etc. including testing of pipe
and joints and fixing the same with adhesive
solvent, including cost of all materials.
43 Providing laying and jointing in true line and
level 32mm dia. U.P.V.C. Pipe ( SCH- 40) for
cold water including fittings as approved by
Engineer In Charge. Pipe shall be fixed on the
wall with the help of clamp at every two metre
C/C or shall be concealed as directed including 1.00 117.97 Rmt.
necessary fittings etc. including testing of pipe
and joints and fixing the same with adhesive
solvent, including cost of all materials.
Providing laying and jointing in true line and level
40mm dia. U.P.V.C. Pipe ( SCH- 40) for cold water
including fittings as approved by Engineer In
Charge. Pipe shall be fixed on the wall with the help
of clamp at every two metre C/C or shall be 10.00 146.65 Rmt.
concealed as directed including necessary fittings
etc. including testing of pipe and joints and fixing
the same with adhesive solvent, including cost of all
45 Providing and fixing S.W. gully trap with C.I.
grating brick masonry chamber and water
tight C.I. cover with frame of 300mm x 3.00 1279.4 No.
300mm size (inside) with standard weight.(i)
traps. (A) 100mm x 100mm size P type.
46 P. & F. PVC SWR Nani Trap IS 14735 for Drain
-100 mm dia with jali
47 Providing and fixing to wall ceiling and floor
10.0 Kg. F/Cm2 working pressure polythene
pipes of the following outside Dia. Low
densidy, complete with special falnge 13.00 274.68 Rmt
compression type fittings, wall clipsetc.
including making good the wall ceiling and
48 Providing and fixing to wall ceiling and floor
10.0 Kg. F/Cm2 working pressure poluthene
pipes of the following outside Dia. Low
densidy, complete with special falnge 10.00 332.91 Rmt
compression type fittings, wall clipsetc.
including making good the wall ceiling and
floor (G)110 mm
49 Providing and fixing chromium plated brass
half trun flush cock of approved quality 1.00 252.26 No.
including fixing in pipe line etc. complete.(i)
50 Providing & Fixing PVC Body Chromium
Finish Health Faucet with Flexible Pipe of
Approved Brand & Manufactures with 1.00 375 No.
holder etc.complete as per direction of
engg.in charge.(N.S.)
51 Providing and fixing 600mm x 450mm
bevelled edge mirrror of superior glass
mounted on 6mm thick A.C. sheet or plywood 2.00 825.48 No.
sheet and fixing to wooden pluge with C.P.
brass screws and washers.
52 Provdg. & fixing Gun metal check or
nonruturn full wheel valve.
53 Providing & Laying China Mosaic clay
flooring & Skirting dedo on wall slab
surface over 20 mm th.C.M.1:3 finished
with white cement including.Using 10.00 300 Sq.M.
plastisizer for water proofing etc.comp.as
54 Providing and laying cement concrete flooring
1:2:4 (1-cement : 2-coarse sand : 4-graded
stone aggregate 20mm nominal size) laid in 20.00 297.68 Sq.M.
one layer and finished with a floating coat of
neat cement. (A) 40mm thick.
55 Providing and fixing M.S. grills of required
pattern to wooden frames of windows etc.
with M.S. flats at required spacings and frame
alround, square or round bars with round 160.07 100.17 Kg.
headed bolts and nuts or by screws (A) Plain
56 Providing and fixing window having extruded
aluminum Colour Powder Coated section
frame main outer size 95mm x 24mm x
1.17mm @ wt.of 0.738 Kg/mt, horizontal
Three track member size 92mm x 31.75mm x
1.30mm @ Wt.1.07 Kg/mt, vertical member of
size 92mm x 31.75mm x 1.50mm ,@ Wt.
Kg/mt with sliding shutters of 5.00 1576.11 Sq.M.
horizontal member size 40 mmx18mm
x1.29mm @ wt.of 0.456 Kg/mt, vertical
member of size 40mm x 18mm x 1.29 mm @
wt.of 0.456Kg/mt with 5 mm thick transparent
bronze colour tinted float glass
with powder coated aluminum fittings and
fixtures and transparent silicon sealant glass
fixing to frame as per details etc
57 Providing and fixing window having extruded
aluminum Colour Powder Coated section
frame main outer size 63.50 x 38.10 x
mm,@ Wt 1.094 Kg / Rmt, horizontal two
track member size 61.85 mm x 31.75 mm x
1.20mm @ wt.of 0.695 Kg/mt, vertical
member of size 61.85 mm x 31.75mm x
mm @ wt.of 0.0.659 Kg/mt with sliding
shutters of horizontal member size 40mm x 5.00 1688.78 Sq.M.
vertical member of size 40mm x 18mm x
1.29mm @ wt.of 0.456Kg/mt with 5 mm thick
transparent bronze colour tinted float glass
with powder coated aluminum fittings and
fixtures and transparent silicon sealant glass
fixing to frame as per details etc
58 l t fand fixing
Providing i d standared extruded of
alluminium section of size 63mm x 38.10mm x
1.2mm , @ Wt. 0.643 Kg/mt with colour
Powder Coated alluminium frame for 2.00 1163.92 Sq.M.
ventilation with 5 mm thick frosted glass as
details etc complete for Ventilation
59 Providing and fixing 35 mm thick shutters for
Doors, windows and clear story windows
including anodised alluminium butt hinges
necessary screws.(A) Indian Teak Wood
(I) Fully panelled 2.00 3902.35 Cu. Dm.
(II) Fully glazed 3.00 3211.96 Sq.M.
(III) Partly panelled & partly glazed 3.00 3557.15 Sq.M.
60 Brick projection patta work using common
burnt clay building bricks having crushing
strength not less than 35 Kg/Sq.mt.as 25.00 40 Rmt.
dire.By engg.incharge in c.m. 1:6 for super
structure elevation.
61 Making Water connection from exi,Muni,Water
62 Supplying,erecting,testing,and commissioning
of horizantal non- clog.Centrifugal
pump set of 1 H.P.of Standard make
agianst the total monometric head of 3.00 5500 No.
15 mt.as per specification incl.motor
starter single phase preventer / liquid level
controller G.I.fitting check valves etc.comp.as
63 Providing and fixing M.S.Fan clamps type 1 of
16 mm dia M.S.bar bent to shade with
hooked ends of R.C.C.slabs during laying
incl.painting the exposed protion of 10.00 100 No.
loops,all as per standard design
complete (N S )
64 Providing & Fixing 3 mm thick F.R.P.sheet of
Approved Quality & Color / Pattern as per
Consultant's design also includes
required fabrication structure in the grid of 2'-
0x2'-0 size using hollow pipe of
gauge & size 2"x1" & 1"x1",G.I. & Bitumen
Washers,Silicon paste application for fixing the
sheet.Rate also include necessary
bending,cutting,labour charges,Zinc Primer
coat & Two coats of oil painting of color as
approved by consultants & making good
65 Providing 2 mm thick F.R.P.Gutter with
necessary M.S.Supporting Brackets.
66 Providing and Fixing pvc.Door (sintex door-
equivalent) with necessary alluminium 2.00 1617 Sq.M.
fitting with EL-7 section frame
67 Providing & Applying Cement popada
plaster in Cement mortar in 1 : 3 Incl.
Cleaning surface before plastering rate also 20.00 120 Sq.M.
incl. Scafloding, watering , and neat
finishing etc. comp. As dire.
68 Supplying and fixing Nimbhada ladi 37 to
mm thick for walk-way, covering the activity
of excavation, ramming, Laying on sand
bedding as per requirement to fix the Nibhada 25.00 265 Smt
Stone in Line & Level with cement
pointing in cement mortar 1:2 etc complete as
69 Removing Any kind of pavement incl stacking
of serviceble material disposal of unserviceble 20.00 14 Smt
material with 50 meter lead and lift.
70 P/l brickbats sand concrete (1:2)of one part of
sand and two part of old brickbats including
spreading,laying, ramming, watering, and 10.00 350 Cmt
consolidation etc complete as directed
71 Providing and Fixing 1 H.P Electrical
monoblock or submarcible water pumps
withmotor and required cable and switch 1.00 6800 Set
board of approved brand and make etc comp
72 Providing and laying cement concrete work
1:2:4 (1- Cement : 2- Coarse sand : 4-
graded stone aggregates 20 mm nominal size)
and curing complete excluding cost of
formwork and reinforcement for reinforced
concrete work in
(A) Foundations, footings, Base or columns
and Mass concrete
(B) Slabs, landings, shelves, balconies,
lintels, beams, girders and cantilever upto 1.00 4012.47 Cum
floor two level.
(D) Columns, Pillars posts and struts upto
floor two level.
73 Providing formwork of ordinary timber
planking so as to give a rough finish including
centering shuttering strutting and propping
etc. Height of propping and centering below
supporting floor to ceiling not exceeding 4 M. 10.00 171.68 smt
and removal of the same for in situ reinforced
concrete and plain concrete work in. (A)
Foundations Footings Bases of Columns etc.
and Mass concrete.
74 Providing formwork of ordinary timber
planking so as to give a rough finish including
centering shuttering strutting and propping
etc. Height of propping and centering below
supporting floor to ceiling not exceeding 4 M.
and removal of the same for in situ reinforced 8.00 252 smt
concrete and plain concrete work in. (B) Flat
surfaces such as soffits of supspened floors
slabs Landings and the like. (1) Floors etc.
200 mm in thickness
75 Providing formwork of ordinary timber
planking so as to give a rough finish including
centering shuttering strutting and propping
etc. height of propping and centering below
supporting floor to ceiling not exceeding 4 M. 8.00 297.68 smt
and removal of the same for in situ reinforced
concrete and plain concrete work in. (G)
Columns PillarsPosts and struts. (1) Square
Rectangular Polygonal in plan.
76 Providing formwork of ordinary timber
planking so as to give a rough finish including
centering shuttering strutting and propping
etc. height of propping and centering below
supporting floor to ceiling not exceeding 4 M.
and removal of the same for in situ reinforced 8.00 192.15 smt
concrete and plain concrete work in. (H) (1)
Sides and soffits of Beams Beam Haunchings
cantilevers Girders Bressumers and Lintels not
exceeding 1 M. in Depth.
77 Providing & Fixing Steel Door with Shutter for
steel sheet 18 Gauge and angel and 40 x
x3 mm And steel doors frame of size 40 x
40x5 mm incl anodised iron butt hinges and 4.64 2700 Smt
nece.fitting and fastening with necessary
screws rate also incl two coats of oil paint etc
78 Supplying labour for painting ladies,gents
name work etc.compas directed
a Painter 5.00 626 Day
R&B SOR 23-24, Ah.City, CODE L024
b supervision at day/night 2.00 348 No.
c mazdoor at day 12.00 493 No.
d paint(white) 5.00 205 Litre
79 Providing And Jointing Stoneware Pipes Incl.
Excavation Up to 2 Mt. Refilling, Transporting
Pipes To Work Site, Unloading, Lowering In
Trench, jointing material Such As Cement,
sand, Hemp Bitumen As Directed, Incl.
Watering The Trenches Spreading And Carting
away Of Surplus material as directed by
engineer in charge.
10 cm diia. 8.00 119.64 Rmt
15 cm diia. 5.00 163.39 Rmt
23 cm diia. 20.00 344.64 Rmt
80 Constructing Chamber of following size
including excavation, refilling, BBCC (1:5:10)
for foundation, C.C.Channel (1:2:4), finished
15 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary
in CM 1:5 & excluding the cost of chamber
seat cover etc..completed.
a 0.60 X 0.45 mt. size Inside Clear, Depth from
0.90meter for pipe dia <=150 mm.
b 0.60 X 0.75 mt. size Inside Clear, Depth from
0.90meter for pipe dia <=20 mm.
c 0.75 X 0.75 mt. size (Inside Clear) Depth from
0.0 to 1.20 meter for pipe dia <=20 mm 1.00 3905.36 No.
81 Providing F.R.C. MH seat cover incl. carting to
the work site etc. comp. Directed.
a FRC medium duty Chamber seat cover (FRC)
cover 706 x 556 x 50 mm rectangular cover
frame size 600 x 450 mm clear opening outer
size 816 x 666 x 100 mm (MD-10)
b FRC light duty Chamber seat cover (FRC)
cover with rectangular frame (LD-2.5)
82 Carting and Fixing M.H., Chamber or Catchpite
Seat and Cover in line and level to match
exisisting road level in C.C. 1:2:4 and finishing
smooth, watering and protecting for 7 days 1.00 750 No.
etc. complete as directed. M.H. seat cover will
be supplied byA.M.C.(from any store)
83 Providing and fixing pre-cast Rubber Dye /
steel Dye inter locking concrete block 60mm
thick with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as
per approved design Confirming to IS 15658 : 5.83 680.1 Sqm.
2006 including 35 mm Sand layer for levelling
and filling the joint with sand in proper line
and level as per guidlines of IRC : SP 63-2018
84 Providing and fixing pre-cast concrete kerb
stone of gray cement based concrete block
30cm length,30cm height and 15cm thick of
M200 grade concret as per approved design 1.00 376.43 Rmt.
and including excavation for fixing in proper
line and level,filling the joint with C:M 1:3
(1cement:3fine sand) etc complete.
85 Conveyance charge of lime murrum building
rubbish earth manure or sludge & execavated
rock and rubbish [Lime murrum
building rubbish]
lead Up to 1 KM 10.00 256.16 cmt
lead Up to 1.5 KM 10.00 268.12 cmt
lead Up to 2 KM 50.00 278.18 cmt
lead Up to 2.5 KM 10.00 287.46 cmt
lead Up to 3 KM 10.00 296.43 cmt
86 Providing and fixing 1.20 Metre high fencing
with 2.0 Metre long M.S. Angle posts 40mm x
40 mm x6 mm and oil painting 3 coats fixed at
2.5 Mt,C/c. with five Horizontan lines and two
diagonals of galvanised steel barbed wire 5.00 385.4 Rmt.
weighting 9.38 Kg. per 100 Metre, strained
and fixed to posts with G.I,staples including
fixing the postsin ground with 0.5 M x 0.5.M x
0.5 M. block in C.C1:5:10 etc complete.
Providing, fabricating and fixing chainlink fencing of
12 gauge G.I. chainlink jali in 2.045X 0.945 m size
angle frame with 75 mm outer dia. Pipe piller at
c/c distence with necs.40X40X5 mm angle for frame,
20X5 mm packing patti, 40X5 mm in/out central
suppor patti, 20X5 mm & 25X25X5 mm hall fast, 5.00 1950 Smt
round MS Ornamental cap at top of pipe, as per
design. Rate also includes bolt, necs. welding,
carting, scaffolding support, and fixing of 1:2:4 c.c.
with all type of labour charges rate also includes
edoxide primer coat & two coats of oil painting etc.
comp. as directed.
88 Providing corrugated G.I. sheet of class-3 roofing
fixed with glavanished iron J or L Hooks, Bolts and
nuts 8mm diameter with bitumen and G.I. limpet
washer or G.I. limpet washer. filled with white lead
complete excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet.
Providing ridges or hips 600 mm overall in plain G.I.
sheet class-3 fixed with G.I.J. or L Hooks and nuts 1.00 635.58 Smt
8mm dia G.I. Limpet and bitumen washer complete.
(1) 0.80 mm thick sheet.
90 Providing and laying cement concrete 1:2:4 (1-
Cement : 2- Coarse sand : 4- graded stone
aggregates 20 mm nominal size) and curing 1.00 3661.3 Cmt
complete excluding cost of formwork in (A)
Foundation and Plinth
91 Providing and laying controlled cement concrete
M.200 and curing complete excluding the cost of
formwork and reinforcement for reinforced 1.00 3977.88 Cmt
concrete work in (A) Foundations, footings, Base of
columns and Mass concrete
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E- TENDER NOTICE No.-3-E-Tender- 34.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].