Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹26.9 L
Closing Date
16 Oct 2026, 3:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
S.E.K.C.C.2, Mirzapur
Office of Superintending Engineer, Kanhar Construction Circle-2, Mirzapur
Construction of Jakwa Aqueduct at Km. 10.000 of RPBC
2026_UPIDC_1188710_1
03/SE/2026-27
Open Tender
Civil Works
Item Rate
120 days
Duddhi Sonebhadra
Please refer Tender Documents.
2 documents required · 2 mandatory
₹2,360
₹26.9 L
Yes
23 Sept 2026
23 Sept 2026
16 Oct 2026
23 Sept 2026
16 Oct 2026
28 Sept 2026
23 Sept 2026 - 28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil/sandy loam, clay or sand mixed with Bajari, Kankar or Mooram including all lift and lead up to 90 m and including filling watering, ramming of excavated earth into the trenches or upto the space and sides of foundation trenches including all leads and lifts, labour charges, T&P etc. and its removal and disposal of surplus earth required for proper completion of work as per direction of Engineer-in-charge. | 5,830.62 | Cum. | - | - |
| 2 | Earth work in excavation of foundation in soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part thereof upto total lead of 90m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 1,665.89 | Cum. | - | - |
| 3 | Earth work in excavation of foundation in other rocks by blasting, removing muck & stacking with extra lead beyond 30m for every lead of 15m or part thereof upto total lead of 90m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 832.95 | Cum. | - | - |
| 4 | M-15 (1:2:4) cement concrete with OPC-43 grade cement, sand FM ≥ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mixing & placing with batching plant and concrete pump, royalty and all taxes etc. for proper completion of work as per direction of Engineer-in-charge. | 3,881.95 | Cum. | - | - |
| 5 | Reinforced cement concrete in M-25 with OPC-43 grade cement, sand FM ≥ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mixing & placing with batching plant and concrete pump, royalty and all taxes etc. but excluding cost of steel reinforcement for proper completion of work as per direction of Engineer-in-charge. | 5,678.51 | Cum. | - | - |
| 6 | Reinforcement Cement concrete in M-30 with OPC-43 grade cement, sand FM ≥ 2.5, coarse aggregate of dalla grit, 4.75-20mm. including cost of all material, labour, T&P, lead & lift, mixing & placing with batching plant and concrete pump, royalty and all taxes etc. but excluding cost of steel reinforcement for proper completion of work as per direction of Engineer-in-charge. | 261.54 | Cum. | - | - |
| 7 | Centering and shuttering for CC work including cost of labour, material, T&P, staging etc. required for proper completion of work as per direction of Engineer-in-charge. | 1,505.21 | Sqm. | - | - |
| 8 | Centering and shuttering for RCC work including cost of labour, material, T&P, staging etc. required for proper completion of work as per direction of Engineer-in-charge. | 11,660.22 | Sqm. | - | - |
| 9 | Reinforcement including straightening Cutting, bending, placing and binding of steel reinforcement including cost of all labour, material, T&P, M.S. binding wire reinforcement steel for proper completion of work as per direction of Engineer-in-charge. | 356.61 | MT | - | - |
| 10 | E/w in back filling in back of abutment and wing wall etc. including cost of all lead, lift, royalty, T&P and its proper compaction etc. required for completion of work as per direction of Engineer-in-charge. | 2,226.32 | Cum. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tenderdocument.pdf
Tender Documents • 1.52 MB
BOQ_2239409.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .