| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | ₹15.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.9 LRejected-AOC | ₹15.9 L | L2 | Rejected-AOC L2 |
| 3 | L3₹16.8 LRejected-AOC | ₹16.8 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | TENNY T J L3 | IJAS C L2 | Baiju v.p L1 |
|---|---|---|---|---|---|---|
| 1.00civil works | ||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 315 | sqm | 7.36 ₹2,318.4 | 6.95 ₹2,189.25 | 7 ₹2,205 |
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 960 | sqm | 172.62 ₹1,65,715.2 | 162.86 ₹1,56,345.6 | 150 ₹1,44,000 |
| 1.00 | 15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | 1,800 | metre | 14.64 ₹26,352 | 13.82 ₹24,876 | 10 ₹18,000 |
| 1.00 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 0.68 | cum | 3,663.24 ₹2,472.69 | 3,455.89 ₹2,332.73 | 4,146 ₹2,798.55 |
| 1.00 | 50.9.13.2:Supplying and fixing Pingoda wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | 0.3 | cum | 80,850.7 ₹24,255.21 | 76,274.24 ₹22,882.27 | 61,018 ₹18,305.4 |
| 1.01 | 50.9.13.4:Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | 0.38 | cum | 7,902.69 ₹2,963.51 | 7,455.37 ₹2,795.76 | 8,946 ₹3,354.75 |
| 1.01 | 50.9.14.2:Supplying and fixing Pingoda wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete. | 0.75 | cum | 92,788.88 ₹69,591.66 | 87,536.68 ₹65,652.51 | 95,000 ₹71,250 |
| 1.01 | 50.9.14.4:Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc . complete. | 1.5 | cum | 19,454.06 ₹29,181.09 | 18,352.89 ₹27,529.34 | 17,000 ₹25,500 |
| 1.01 | OD177177/2025-2026:oiling with waste oil two coat to the roof members including all cost and materials,conveyance, labour charges etc complete | 3,600 | sqm | 80.5 ₹2,89,800 | 75.95 ₹2,73,420 | 58 ₹2,08,800 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
13 Mar 2026, 3:00 pmClosed
Executive Engineer,Buildings Division Thrissur
Executive Engineer,Buildings Division Thrissur
GENERAL-Urgent repair works for RHD type quarters at civil lane, Ayyanthole, Thrissur- RHD type quarters-General Civil Work
2026_PWD_844382_1
89/2025-26/EE(B)TSR
Open Tender
Civil Works - Buildings
180 days
AYYANTHOLE
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
1 Jul 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1civil works | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.002 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | - | sqm | - | - |
| 1.003 | 15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | - | metre | - | - |
| 1.004 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | - | cum | - | - |
| 1.005 | 50.9.13.2:Supplying and fixing Pingoda wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | - | cum | - | - |
| 1.006 | 50.9.13.4:Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | - | cum | - | - |
| 1.007 | 50.9.14.2:Supplying and fixing Pingoda wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc. complete. | - | cum | - | - |
| 1.008 | 50.9.14.4:Supplying and fixing Dept. wood reapers of size 50x25 mm with wire nails including cost and conveyance of materials etc . complete. | - | cum | - | - |
| 1.009 | OD177177/2025-2026:oiling with waste oil two coat to the roof members including all cost and materials,conveyance, labour charges etc complete | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1425561.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1425561.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid