| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC | L1 | Accepted-AOC Below Rate | |
| 2 | L2₹20.0 L+₹20,397.17 (1.03%)Rejected-AOC | L2 | Rejected-AOC Above Rate |
| Sl No | Description | Qty | Unit | V.GANESAN L2 | SAKTHI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Construction of Community Hall at Kattampatti Colony H/O Thukkachi Panchayat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 25.66 | Cum | 249 ₹6,389.34 | 246 ₹6,312.36 Lowest |
| 3.00 | Supplying and filling in foundation and basement with filling excavated earth in large of not more than 15cm thick well etc., | 42.52 | Cum | 1,437 ₹61,101.24 | 1,422 ₹60,463.44 Lowest |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 13.81 | Cum | 5,025 ₹69,395.25 | 4,974 ₹68,690.94 Lowest |
| 5.00Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | |||||
| 6.00 | Below GL | 6.03 | Sqm | 6,087 ₹36,704.61 | 6,026 ₹36,336.78 Lowest |
| 7.00 | Above GL | 23.73 | Sqm | 6,175 ₹1,46,532.75 | 6,113 ₹1,45,061.49 Lowest |
| 8.00Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened etc., | |||||
| 9.00 | Below GL | 49.65 | Sqm | 522 ₹25,917.3 | 516 ₹25,619.4 Lowest |
| 10.00 | Above GL | 194.26 | Sqm | 1,043 ₹2,02,613.18 | 1,033 ₹2,00,670.58 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
5 Aug 2025, 3:00 pmClosed
Block Development Officer(B.P)
Block Development Office, K.Paramathi Block
Construction of Community Hall at Kattampatti Colony H/O Thukkachi Panchayat
2025_RDTN_588068_2
K.Paramathi Block - MLACDS-2025-26
Open Tender
Civil Works - Buildings
Item Rate
90 days
K.Paramathi Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹20,000
4 Sept 2025
1 Aug 2025
5 Aug 2025
1 Aug 2025
5 Aug 2025
1 Aug 2025
Amount
Name of the Work : Construction of Community Hall at Kattampatti Colony H/O Thukkachi Panchayat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation and basement with filling excavated earth in large of not more than 15cm thick well etc.,
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Below GL
Above GL
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams etc., including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened etc.,
Below GL
Above GL
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
For column Footing
Column upto lintel
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmenta
Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work)
Paving the floor with Vetrified tiles 0.60mx0.6mx0.06m in all floors over a base layer of cement mortar 1:3 (one cement and three sand ) 20mm thick laid in-situ and pointed with same coloured cement
Finishing top roof mix one course machine pressed tiles of size 20 cm x 20 cm x 2 cm approved qty with,CM.1:3 12 mm thick mixed with WPC at 2% by weight of cement used and top pointed with the same mortar etc
Supplying and fixing P.V.C rainwater down fall pipe of 100mm dia with necessary shoes, bends,& clamps etc.,
Distembering two coats of oil bound distember using one coat of primer coat including cost & conveyance to size and all labour charges etc., complete.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete .
Cost And Supply of Doors(1.20*2.10)
Cost And Supply of Windows(1.20*1.30)
Painting two coats of new iron work with best quality synthetic enamel paint of approved quality and colour with priming coat including the cost all materials etc.,complete, in all floors.
Supplying and fixing following watersupply arrangement
Cost And Supply Of 1000lit HDPE Tank
25mm Pvc pipe
25mm Pvc Bend
25mm Pvc Tee
25mmX15mm Pvc Reducer
15mm Pvc Tap
Supplying and fixing following electrical arrangement
Light Point-SD-17
Toilet Light Point-SD 17
Fan Point SD-17
Plug Point-SD-36
Tube Light-SD 87
Ceiling Fan-SD 106
Street Light SD -94
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V.GANESAN (BID ID -1418442)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .