Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC | ₹3.1 L | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | Najeeb N M L1 | K I SHAJI L2 |
|---|---|---|---|---|---|
| 1.00Shuttle court | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 10.02 | cum | 359.72 ₹3,605.47 | 377.71 ₹3,785.79 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9.84 | cum | 7,932.89 ₹78,067.57 | 8,329.53 ₹81,970.90 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.18 | cum | 9,235.97 ₹1,680.95 | 9,697.77 ₹1,764.99 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.8 | cum | 9,963.93 ₹97,646.51 | 10,462.13 ₹1.0 L |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 784 | kilogram | 112.43 ₹88,145.12 | 118.05 ₹92,551.20 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 30.1 | kg | 178.42 ₹5,370.44 | 187.34 ₹5,638.93 |
| 1.01 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer | 98 | sqm | 80.85 ₹7,923.30 | 84.89 ₹8,319.22 |
| 1.01 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 98 | sqm | 252.95 ₹24,789.10 | 265.6 ₹26,028.80 |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 1.07 | sqm | 164.86 ₹177.22 | 173.1 ₹186.08 |
Tender Value
₹3.1 L
EMD Value
₹7,758
Closing Date
8 Sept 2025, 4:00 pmClosed
Assistant engineer
Assistant engineer Eloor Municipality
GENERAL-EloorMunicipality Plan 2025-2026 Pro. No 234-Construction of Shuttle court in Govt.LP School -General Civil Work
2025_LSGD_791874_1
234/ET/AE/LSGD/ELR/2025-26
Open Tender
Civil Works - Others
180 days
Eloor Municipality
Please refer Tender documents.
7 documents required · 7 mandatory
₹658
₹7,758
24 Jan 2026
2 Sept 2025
10 Sept 2025
2 Sept 2025
8 Sept 2025
2 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1306134.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid