| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC BXMPS0586H | ₹1.2 L | L1 | Accepted-AOC As per quoted |
| 2 | L2₹1.2 L+₹1,300 (1.11%)Rejected-AOC 275 THURUTHY LAKSHAMVEEDU COLONY ANGANWADY ROAD TILE PAVING WARD 7 | THRISSUR | KERALA | 679105 | ₹1.2 L+₹1,300 (1.11%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SOJAN N GEORGE L1 | BASIL P VARGHES L2 |
|---|---|---|---|---|---|
| 1.00Side Protection | |||||
| 1.00 | OD248138/2025-2026:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. (Adopted From DAR 60.1.2) | 3.5 | metre | 1,140 ₹3,990 Lowest | 1,140 ₹3,990 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 9 | hour | 470 ₹4,230 Lowest | 470 ₹4,230 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 15 | cum | 350 ₹5,250 Lowest | 350 ₹5,250 Lowest |
| 1.00 | OD248137/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. (Adopted From DAR 60.7.1) | 18.68 | cum | 3,993 ₹74,569.28 Lowest | 3,993 ₹74,569.28 Lowest |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 5 | sqm | 750 ₹3,750 Lowest | 750 ₹3,750 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 92.5 | kilogram | 110 ₹10,175 Lowest | 110 ₹10,175 Lowest |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.62 | cum | 9,100 ₹14,787.5 Lowest | 9,900 ₹16,087.5 |
Tender Value
₹1.2 L
EMD Value
₹2,961
Closing Date
26 Feb 2026, 11:00 amClosed
Assistant Engineer
Assistant Engineer, LID EW section, Koovappady
Annual Plan-278/2025-26 -Construction of side protection wall in Manthodu ward 18,Koovappady G.P.
2026_LSGD_836622_1
02/T6/AE/LIDEW/KVPDY/25-26
Open Tender
Civil Works - Water Works
Item Rate
365 days
Koovappady GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
₹2,961
31 Jul 2026
18 Feb 2026
2 Mar 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Side Protection | |||||
| 1.001 | OD248138/2025-2026:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. (Adopted From DAR 60.1.2) | - | metre | - | - |
| 1.002 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
| 1.003 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.004 | OD248137/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with goodquality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. (Adopted From DAR 60.7.1) | - | cum | - | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.007 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1408518.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1408518.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.92 MB
time.pdf
PDF • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .