Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.3 LAccepted-Finance | 1 | Accepted-Finance Being L1, Considered for Award of Contract | |
| 2 | 2₹34.0 L+₹74,914.37 (2.25%)Rejected-Finance 240 4TH CROSS M S RAMAIAH NORTH CITY THANISANDRA MAIN ROAD NAGAVARA BANGALORE 560077 | BENGALURU URBAN | KARNATAKA | 560077 | 2 | Rejected-Finance Being L2, not Considered for Award of Contract | |
| 3 | 3₹34.1 L+₹85,294.17 (2.57%)Rejected-Finance | 3 | Rejected-Finance Being L3, not Considered for Award of Contract |
Tender Value
₹32.3 L
EMD Value
₹64,550
Closing Date
2 Dec 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The SA, ASI, Amaravati Circle, Vijayawada
Aurobindo Plaza,6-134/1, Kanuru Main Road, Kanuru, Vijayawada 520007 A.P
As per the NIT document
2020_ASI_597170_1
13/NIT/2020-21 /Amaravati/Kadapa Sub circle
Open Tender
Civil Works
Item Rate
180 days
Pushpagiri, Kadapa District
As per the NIT document
7 documents required · 7 mandatory
₹0
₹64,550
4 Jan 2021
13 Nov 2020
3 Dec 2020
13 Nov 2020
2 Dec 2020
13 Nov 2020
90 days
Amount
Description of Items
Item No.1: Laying of scaffolding to the main gopura of temple complex for attending repairs and removing after the work using BSL make scaffolding set. Including cost of materials, labour, , loading, transportation, unloading charges GST and other taxes etc. complete.
Item No.2: Stucco lime plastering in LM (1:2) and grouting in LM (1:1) to the main gopura including removal of dead lime plasters carefully including cost of materials, labour, scaffolding charges, loading, transportation, unloading charges GST and other taxes etc. complete.
Item No.3: Supply and fixing of New teak wood door to Trikoteswara Swamy temple using the teak/Sal including supply of the wood, cutting in to required sizes, fixing, making ornamental designs if any to the front face, dressing, polishing and positioning it in original place etc. and including GST and other taxes etc. complete item of work. Size of the Door 2.50 x2.75 m in which Door planks of size of thickness 0.05 m, Lotus design 0.40x0.40x0.075 m, For vertical panels of size 2.75x0.15x0.075 m , For horizontal panels of size 1.25x0.15x0.10 m etc. complete item of work as per the design and drawing enclosed.
Item No.4: Removal of accumulated and dumped debris in temple. complex manually not causing any damage to structures and disposing far away from the monument including all labour, loading, transportation, unloading charges , GST and other taxes etc. complete
Item No.5: Dismantling the CR wall which was constructed to retain accumulated and dumped debris in temple complex including all labour, loading, transportation, unloading charges , GST and other taxes etc. complete
Item No.6: Construction of CR wall with cuddapah stones of size 0.45x0.30x0.23 m in LM (1:1:1) Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.7: Pointing to CR wall in LM (1:1:1) Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.8: Repairs to existing drain which was completely blocked including removing of slabs over drain and mandapa stone slabs for repair purpose and resetting after the work including all labour charges GST and other taxes etc. complete
Item No.11: Proposed dwarf wall in Kadapa stones of size 0.30 x 0.30 x 0.23 m in LM (1:1:1) and pointing in LM (1:1:1) for the openings of proposed sculptures gallery to a height of 0.45 m for safety of the sculptures. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.13: Careful Removal of roof concrete of dharma satram with chain pulley block not causing any damage to the structure for the purpose of replacing broken beam Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.14: Removal of broken beams and slabs in dharma satram with chain pulley block not causing any damage to the structure carefully Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.15: Supply of new Kadapa stone beams and pillars of size 2.78*0.31*0.20 m including 3-line dressing finished item. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.16: Careful erection and fixing in position of old roof slabs and newly supplied finished dressed stone beams in dharma satram with chain pulley block not causing any damage to the structure. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.17: Relaying of roof slab of thick 0.15m Plain Lime Concrete (1:2:4) (Lime: fine aggregate: Coarse aggregate) using hard broken brick aggregate 20mm size hard over which embedded clay tiles of size 0.20x0.20x0.20m in LM (1:1:1) Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.18: Removal of debris on north side of temple complex along prakara wall. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.19: Supply and fixing of New teak wood door to the temple entrance by using the teak/Sal for making Size of the Door 0.75 x1.50m in which Door planks of size 0.75x1.50x0.050m, Lotus designs of size 0.25x0.25x0.05m, For vertical panels of size 1.50x0.075x0.05m and For horizontals 0.23x0.075x0.05m .including supply of the wood, cutting in to required sizes, fixing, making ornamental designs if any to the front face, dressing , polishing in teak wood polish and positioning it in original place etc. complete item of work as per the design and drawing enclosed. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete
Item No.20: Repairs to the platform of Nandi mandapa in front of Bhimeswara temple including removing and resetting in LM (1:1:1) Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.21: Reconstruction of missing steps to the Bhimeswara temple with Kadapa stones of size 1.20 x0.45x0.15 m in LM (1:1:1) Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete..
Item No.22: Providing stone flooring in front of Raghaveshwara Swamy Temple using new Kadapa stone slabs of size 0.90 x0.60x0.075 m over lime concrete of 100 mm thick in LM (1:1:1) and pointing in LM (1:1:1). Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.23: Re-pointing the joints of clay tiles in CM (1;2) laid on group of temples to control the leakage / seepage of water with necessary repairs. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
Item No.24: Laying of clay tiled waterproof course using clay tiles of size 0.20m x 0.20 m of thickness 12 mm on roof of the temples in CM (1;2) and pointing with colour mixed additive white cement to control the leakage / seepage of water with necessary slopes for draining. Including cost, conveyance of materials, loading, transportation, unloading, labour, seigniorage, GST and other taxes etc. complete.
SRI SATHYA ENGINEERS AND CONTRACTORS
CHINTHADA VENKATA RAO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .