Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.3 CrAccepted-AOC | ₹6.3 Cr | L-1 | Accepted-AOC Lowest rate quoted |
| 2 | L-2₹6.8 Cr+₹53.6 L (8.54%)Rejected-Finance P O BADARPURGHAT DIST HAILAKANDI ASSAM PIN 788803 | KARIMGANJ | ASSAM | 788803 | ₹6.8 Cr+₹53.6 L (8.54%) | L-2 | Rejected-Finance High Rate Quoted |
Tender Value
Refer Docs
EMD Value
₹5.9 L
Closing Date
17 May 2024, 5:00 pmClosed
Chief Engineer Project Pushpak
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl, Mizoram
PDG AND LYG OF HMP READY MIX BC 30 MM TH INCL CLEANING RD SURFACE APPLYING TACK COAT, CORRECTION WKS WITH BM 75 MM INCL RD MARKING FOR RE-SURF WKS BETWEEN KM 7.00 AND KM 136.112 (NET LENGTH 20.989 KM) ON H-S-S RD UNDER 71 RCC PROJECT PSK IN MIZORAM
2024_BRO_651272_1
NIT-04 of 2024-25
Open Tender
Civil Works - Roads
Item Rate
180 days
KM 7.00 AND KM 136.112 (NET LEN 20.989 KM) ON HSS
As per Tender Documents
8 documents required · 8 mandatory
₹0
₹5.9 L
Yes
HQ CE (P) Pushpak, CO 99 APO, Zemabawk, Aizawl
13 Jul 2024
26 Apr 2024
18 May 2024
27 Apr 2024
17 May 2024
10 May 2024
29 Apr 2024 - 9 May 2024
4 May 2024
Amount
Re-Surfacing work on various location between Km 7.00 and Km 136.112 (Net Length 20.989 Km) on Hnathial-Sangau-Saiha Road
Providing and laying of HMP ready mix Bituminous Concrete (BC) 30 mm thick compacted with bitumen VG-30 as per clause 507 of MoRT&H Specifications (Fifth revision) for road and bridge work , tack coat as per clause 503 of MoRT&H Specifications (Fifth revision) on the existing BT surface, correction work with BM 75 mm thick compacted as per clause No 504 of MoRT&H Specifications (Fifth revision) including Prime Coat as per clause 502 of MoRT&H Specifications (Fifth revision ) duly maintaining the road profile with paver finisher and rolled as per clause 501.6 and 501.7 of MoRT&H Specifications (fifth revision) to achieve desired compaction including all labourers, materials and machinery as specified and directed by Engg-In-Charge. Note: 1. The specification given in clause 3004.2 of MoRT&H Specifications (Fifth revision) will be complied while carrying out correction work. 2. The maximum area of correction work with BM 75 mm thick compacted will be 10% of the cost of BC 30 mm.
Edge road marking with thermo plastic paint 2.5 mm thick confirming to clause 803.4 of MoRT&H Specifications (fifth revision) including all labourers, materials and machinery as specified and directed by Engg-In-Charge.
SLT INFRACON PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .