Tender Value
₹26.8 L
EMD Value
₹27,000
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Executive Engineer, Ahmedabad City (R&B) Division, Ahmedabad
Renovation of Govt. Chora Office, Rakhiyal-Maninagar, Ahmedabad. (Construction of Compound Wall and other misc. Work at Govt. Chora Office, Rakhiyal-Maninagar, Ahmedabad)
345409
15 of 2026-2027
Open
Civil Works - Buildings
Works
Ahmedabad
6 documents required · 6 mandatory
₹1,500
Executive Engineer, Ahmedabad City (R&B) Division, Ahmedabad
₹27,000
16 Sept 2026
16 Sept 2026
16 Sept 2026
28 Sept 2026
16 Sept 2026
Name of Work : Renovation of Govt. Chora Office, Rakhiyal-Maninagar, Ahmedabad.
(Construction of Compound Wall & Other Misc Work at Govt. Chora Office,
Rakhiyal-Maninagar, Ahmedabad)
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
Item 45.00 Demolition of Brick work and 550.40 Rupees Five Cum
No. 1 stone masonry including Hundred
stacking of serviceable Fifty And
materilas and disposal of Paise Forty
unserviceable materials with all Only
lead and lift.(ii) In Cement
Item 297.00 Excavation for foundation upto 117.08 Rupees One Cum
No. 2 1.5 m depth including sorting Hundred
out and stacking of useful Seventeen
materials and disposing off the And Paise
excavated stuff upto 50 Meter Eight Only
lead.(A) Loose or soft soil
Item 14.00 Providing and laying cement 2680.21 Rupees Two Cum
No. 3 concrete 1:4:8 (1- Cement : 4- Thousand
coarse sand : 8- hand broken Six Hundred
stone aggregates 40 mm Eighty And
nominal size) and curing Paise
complete excluding cost of Twenty One
formwork in (A) Foundation and Only
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
Item 32.00 Providing and laying cement 3962.80 Rupees Cum
No. 4 concrete work 1:2:4 (1- Cement Three
: 2- Coarse sand : 4- graded Thousand
stone aggregates 20 mm Nine
nominal size) and curing Hundred
complete excluding cost of Sixty Two
formwork and reinforcement for And Paise
reinforced concrete work in (A) Eighty Only
Foundations, footings, Base or
columns and Mass concrete
Item 11885.00 Providing TMT Bar FE 500D 76.21 Rupees KG
No. 5 reinforcement for R.C.C. work Seventy Six
including bending, binding and And Paise
placing in position complete Twenty One
upto floor two level Only
Item 34.00 Providing and laying cement 4052.59 Rupees Four Cum
No. 6 concrete work 1:2:4 (1- Cement Thousand
: 2- Coarse sand : 4- graded Fifty Two
stone aggregates 20 mm And Paise
nominal size) and curing Fifty Nine
complete excluding cost of Only
formwork and reinforcement for
reinforced concrete work in (B)
Slabs, landing, shelves,
Balconis , Lintels, Beams,
Girders and Cantilever upto
floor two level.
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
Item 589.00 Providing formwork of ordinary 173.40 Rupees One Sqm
No. 7 timber planking so as to give a Hundred
rough finish including centering Seventy
shuttering strutting and Three And
propping etc. Height of Paise Forty
propping and centering below Only
supporting floor to ceiling not
exceeding 4 M. and removal of
the same for in situ reinforced
concrete and plain concrete
work in. (A) Foundations
Footings Bases of Columns
etc. and Mass concrete.
Item 25.00 Providing and laying cement 4052.59 Rupees Four Cum
No. 8 concrete work 1:2:4 (1- Cement Thousand
: 2- Coarse sand : 4- graded Fifty Two
stone aggregates 20 mm And Paise
nominal size) and curing Fifty Nine
complete excluding cost of Only
formwork and reinforcement for
reinforced concrete work in (D)
Columns, Pillars posts and
struts upto floor two level.
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
Item 110.50 Brick work using common burnt 4295.99 Rupees Four Cum
No. 9 clay building bricks having Thousand
crushing strength not less than Two
35 kg./Sq.Cm. in foundation Hundred
and plinth in Cement Mortar 1:6 Ninety Five
(1- Cement : 6 -fine sand) in And Paise
superstructure above plinth Ninety Nine
level upto floor two level (B) Only
Conventional (upto 10 ton)
Item 207.50 Filling available excavated 130.39 Rupees One Cum
No. 10 earth (excluding rock) in Hundred
trenches. plinth, sides of Thirty And
foundations etc. in layers not Paise Thirty
exceeding 20 cm. in depth Nine Only
consolidating each disposited
layer by ramming and watering.
Item 1440.00 20mm thick sand faced cement 300.66 Rupees Sqm
No. 11 plaster on walls upto height 10 Three
metres above ground level Hundred
consisting of 12mm thick And Paise
backing coat of C.M. 1:3 (1- Sixty Six
cement : 3-sand) and 8mm Only
thick finishing coat of C.M. 1:1
(1-cement : 1-sand) etc.
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
Item 1440.00 Finishing wall with weather 114.53 Rupees One Sqm
No. 12 proof exterior emulsion paint on Hundred
wall surface (two coats) to give Fourteen
an required shape even shade And Paise
after thoroughly brushing the Fifty Three
surface to remove all dirt, and Only
remains of loose powdered
materials.etc complete
Item 1200.00 Steel work, welded in built up 84.13 Rupees Kg
No. 13 sections framed work including Eighty Four
cutting, hoisting, fixing in And Paise
position and applying a priming Thirteen
coat of red lead paint. (A)In Only
beams and joists, channels
angles Tees, flats, with
connecting plates or angle
cleats as in main and cross
beams. Hip and jack rafters,
purlins connetedto common
rafters and the like
Item 48.00 Painting two coats (excluding 87.81 Rupees Sqm
No. 14 priming coat) on newsteel and Eighty
other metal surface with Seven And
enamel paint, brushing, interior Paise Eighty
to give an even shade including One Only
cleaning the surface an even
shade including cleanicn the
surface of all dirt, dust and
other foreign matter.
Item Quantities Item of work Estimated Rates Unit Total Amount
Item Quantities Item of work Estimated Rates Unit Total Amount
No. Estimeted according to
but may be In In Words Estimated
more or less Figures quantities
Rupees Twenty Six Lakh(s) Seventy Five Thousand Six Hundred Seventy One And Paise Eighty
I / We am / are willing to carry out the work at _________________ % above / below percent
(Should be written in figures and words) of the estimated rates mentioned above. Amount of my/our
tender works out as under:
*Estimated Amount *Estimated Amount
Put to Tender Rs.________ Put to Tender Rs.________
Deduct _____% below Rs. ________ Add _____% above Rs. ________
Net Rs.________ Net Rs.________
*(Please strike out whicever is not applicable)
1 The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where there is a change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
5 Credit of Dismanteled Materials amount Rs. Deducted from 1st R.A. Bill
Deputy Executive Engineer Executive Engineer
Dated Signature of Constn. (R&B) Sub Dn No.1 Ahmedabad City (R & B) Division
the contractor Ahmedabad. Ahmedabad.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
001-SBD (Chora Office-Rakhiyal).pdf
002 Special Condition-1.pdf
003-Special Condition-2.pdf
004-Brand Pasandgi.pdf
005-Khas Sharat.pdf
006-GR as per SBD (12-01-2024)-City Dn.pdf
007-Standards for Cement Con. Dt.11-5-2017.pdf
008-Single Tender GR Dt.18-2-2017.pdf
009-Tender Negotiation Dt.08-06-2018.pdf
010-Testing Schedule Dt.24-10-1994.pdf
011-GR Reg Laplength in Reinforcement Dt.15-2-2017.pdf
012-FD Circular No 1097 GST Dt.15-9-2018.pdf
013-Registration Mandatory Dt.3-9-2016.pdf
014-Tender Reinvite Guideline Dt.25-8-2015.pdf
015-E-Tendering-Tender Fee and EMD Dt18-1-2008.pdf
016-E-Tendering-Tender Fee and other doc Dt.27-11-2008.pdf
017-COMPUTERISED MB GR Dt.1-2-2017.pdf
018-Payment through RTGS-NEFT Dt.30-4-2018.pdf
019-RMC (Dt.15-07-2023)for above 5 cr works.pdf
020-Mix Design Condition.pdf
021-Guarantee Bond-All.pdf
022-Performance Bond and Bitumen date Dt.04-05-2026.pdf
023-SARDAR SAROVAR-1 (1).pdf
024-Tender Negotiation Dt.17-3-2026.pdf
025-15 year lift amc GR.pdf
026-Sch-B (Reno Govt Chora-Rakhiyal).pdf
027-Specification Index.pdf
028-Specification.pdf
029-Material Testing Schedule.pdf
030-Tender Notice No.15 of 2026-2027.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .