| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAdmitted-Finance L 15 3 1ST FLOOR DLF PHASE 2 GURUGRAM | GURUGRAM | GURUGRAM | HARYANA | ₹3.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹2.5 L (0.84%)Admitted-Finance VILLAGE THARAS P O HURLA TEHSIL BHUNTAR DISTT KULLU H P 175125 | KULLU | HIMACHAL PRADESH | 175125 | ₹3.1 Cr+₹2.5 L (0.84%) | L2 | Admitted-Finance |
| 3 | L3₹3.5 Cr+₹43.9 L (14.5%)Admitted-Finance | ₹3.5 Cr+₹43.9 L (14.5%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical non-responsive as per clause 4.6 of ITB, 1.4 A of Section 2 and 4.5.4 , 4.5.5 of ITB |
| 5 | Rejected-Technical | - | - | Rejected-Technical non-responsive as per clause 4.5.7 , 4.6 of ITB |
| Sl No | Description | Qty | Unit | GORSI CONSTRUCTION PVT LTD L3 | Ashadeep Construction Private Limited L2 | WELKIN INFRACON PVT LTD L1 |
|---|---|---|---|---|---|---|
| 1.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per MORTH Specification Clause 404 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge. | 525.82 | Per Cubic meter | 3,700 ₹19,45,534 | 1,800 ₹9,46,476 Lowest | 2,900 ₹15,24,878 |
| 2.00 | Providing and applying priming coat with bitumen emulsion SS-1 using emulsion pressure distributor at the rate of 0.70kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per MORTH Specification Clause 502 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge. | 5,258.15 | Per Square meter | 86 ₹4,52,200.9 | 50 ₹2,62,907.5 Lowest | 70 ₹3,68,070.5 |
| 3.00 | Providing and applying tack coat with low viscosity liquid bituminous material RS-1 emulsion using emulsion pressure distributor at the rate of 0.25 Kg/Sqm on the prepared bituminous/granular surface cleared with mechanical brooms as per MORTH Specification Clause 503 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge. | 18,705.1 | Per Square meter | 31 ₹5,79,858.1 | 20 ₹3,74,102 Lowest | 25 ₹4,67,627.5 |
| 4.00 | Providing and laying 50 mm (Fifty milimetre) thick dense graded bituminous macadam with 60-90 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bitumen binder(VG-40) @ 4.5 percent by weight of total mix and filler transporting the hot mix material to work site in clean insulated vehicles covered while in transit or awaiting, tipping & laying with a hydrostatic paver finisher with sensor control to the required grade, level & alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification Clause 505 complete in all respects with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge. | 935.26 | Per Cubic meter | 13,300 ₹1,24,38,958 | 12,500 ₹1,16,90,750 | 11,800 ₹1,10,36,068 Lowest |
| 5.00 | Providing and applying tack coat with low viscosity liquid bituminous material RS-1emulsion using emulsion pressure distributor at the rate of 0.20 Kg/Sqm on the prepared bituminous/granular surface cleared with mechanical brooms as per MORTH Specification Clause 502 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge. | 28,922.65 | Per Square meter | 31 ₹8,96,602.15 | 18 ₹5,20,607.7 Lowest | 25 ₹7,23,066.25 |
| 6.00 | Providing and laying 40 mm (Forty millimetre) thick VG-40 bituminous concrete with100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading .premixed with bituminous binder @ 5.5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade ,level and alignment ,rolling with smooth wheeled ,vibratory and tandem rollers to achieve the desired compaction as per MORTH Specification Clause 507 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge. | 1,156.91 | Per Cubic meter | 15,900 ₹1,83,94,869 | 14,500 ₹1,67,75,195 | 14,000 ₹1,61,96,740 Lowest |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
30 Aug 2025, 11:00 amClosed
Superintending Engineer
NH CIRCLE HP.PWD SHIMLA
Special Repair by patch work to improve the riding quality of highway in Km. 74-00 to 94-830 on NH-305 SH- P-L DBM, BC in Stretches which will be by passed by re-alignment of widening to two lane proposal from Km. 74-00 to 94-00
2025_MoRTH_868123_1
1327-33 dt 17.06.2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Rampur
Please refer Tender documents.
4 documents required · 4 mandatory
₹12,000
Regional Pay Accounts Officer NH MoRTH
₹7.0 L
S.E NH CIRCLE SHIMLA
24 Sept 2025
10 Jul 2025
1 Sept 2025
19 Jul 2025
30 Aug 2025
19 Jul 2025
19 Jul 2025
Amount
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per MORTH Specification Clause 404 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge.
Providing and applying priming coat with bitumen emulsion SS-1 using emulsion pressure distributor at the rate of 0.70kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per MORTH Specification Clause 502 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge.
Providing and applying tack coat with low viscosity liquid bituminous material RS-1 emulsion using emulsion pressure distributor at the rate of 0.25 Kg/Sqm on the prepared bituminous/granular surface cleared with mechanical brooms as per MORTH Specification Clause 503 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge.
Providing and laying 50 mm (Fifty milimetre) thick dense graded bituminous macadam with 60-90 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bitumen binder(VG-40) @ 4.5 percent by weight of total mix and filler transporting the hot mix material to work site in clean insulated vehicles covered while in transit or awaiting, tipping & laying with a hydrostatic paver finisher with sensor control to the required grade, level & alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification Clause 505 complete in all respects with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge.
Providing and applying tack coat with low viscosity liquid bituminous material RS-1emulsion using emulsion pressure distributor at the rate of 0.20 Kg/Sqm on the prepared bituminous/granular surface cleared with mechanical brooms as per MORTH Specification Clause 502 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge.
Providing and laying 40 mm (Forty millimetre) thick VG-40 bituminous concrete with100-120 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading .premixed with bituminous binder @ 5.5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade ,level and alignment ,rolling with smooth wheeled ,vibratory and tandem rollers to achieve the desired compaction as per MORTH Specification Clause 507 complete in all respect with in all leads and lifts through all mode of transportation and as per the entire satisfication and direction of Engineer -in-Charge.
Ashadeep Construction Private Limited (BID ID -3260737)
GORSI CONSTRUCTION PVT LTD (BID ID -3270496)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.36 MB
Tenderdocument.pdf
Tender Documents • 2.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .