| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-Finance H 144 358 N L CHATTERJEE ROAD RAMNAGAR P O RAIPUR MAHESHTALA KOLKATA 700141 | KOLKATA | 24 PARAGANAS SOUTH | WEST BENGAL | 700141 | ₹9.8 L | L1 | Accepted-Finance Lowest Quoted Rate. |
| 2 | L2₹10.0 LRejected-Finance | ₹10.0 L | L2 | Rejected-Finance Higher Quoted Rate. |
| 3 | L3₹12.2 LRejected-Finance | ₹12.2 L | L3 | Rejected-Finance Higher Quoted Rate. |
| 4 | L4₹12.3 LRejected-Finance | ₹12.3 L | L4 | Rejected-Finance Highest Quoted Rate. |
| Sl No | Description | Qty | Unit | Sunbird Power Pvt. Ltd. L2 | M/S INSILICA L1 | M/S Unique Electricals L4 | THE BUSINESS ENGINEERS INDIA L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation, Testing and Commissioning of on-grid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of C-Si Mono/C-Si Poly/ Mono PERC halfcut silicon solar cells, net metering facility, necessary protections, earthing, mounted on GI structure of suitable strength with incorporation of following components as required to complete the project successfully:-
(a) Solar Photovoltaic Module of capacity 330 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 19% PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years.
[Make: Vikram Solar / Adani / SOVA / Goldi Green / BHEL / PV Power Tech / Lubi / Nano / Maxx / Navitas / Navi Solar / Tata Solar / Panasonic / WAAREE]
(b) Power Conditioning Unit (PCU) of 350-800 V or higher DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. [Make: ABB/Thea/Delta/Schneider/Sungrow/Power one/ SMA/ Solar Edge/Solis/Frontier/Growatt) | 25 | KWp | 40,000.01 ₹10.0 L | 39,120 ₹9.8 L | 49,170 ₹12.3 L | 48,748.16 ₹12.2 L |
| 1.01(c) Data Monitoring System complete with accessories. (d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (e) The proposed PV module panel frame structure shall be so fabricated as to be grouted on Roof top on its legs. The legs of the structure shall be fixed and grouted in the PCC/RCC foundation column made with 1:2:4 cement concrete. The foundation shall support SPV modules at a given orientation, absorb and transfer the mechanical wind speed of 120 KM/hr (minimum). (f) Conventional type Lightning protection of adequate quantity as per design, should be approved by EIC. (g) Surge voltage protection system as per guideline. (h) Connections & Interconnections by supplying & fixing of adequate size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables(Make:RR Kabel/Polycab/Havells) between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. (i) Manual sprinkler system complete with accessories for periodical cleaning of Solar Panel. *** [Detail Scope of work & Specification are furnished in the Annexure –I (General Specification) attached herewith] N.B.: Rates are inclusive of all taxes and duties. | |||||||
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
13 Feb 2026, 12:00 pmClosed
Sr. SE, PWD, Kolkata Electrical Circle
P-16, India Exchange Place Extn. KIT Building, 2nd Floor, Kolkata-700073
Construction of new G plus 3 academic building in the campus of the Jnan Chandra Ghosh Polytechnic-SITC of Solar Photovoltaic power plant.
2026_WBPWD_992831_1
PWD/SE/KEC/NIT-13/25-26
Open Tender
ELECTRICAL WORKS ORG
90 days
Jnan Chandra Ghosh Polytechnic
Please refer Tender documents.
9 documents required · 9 mandatory
₹25,000
Office of the SE, PWD, Kolkata Electrical Circle
6 Mar 2026
21 Jan 2026
16 Feb 2026
21 Jan 2026
13 Feb 2026
22 Jan 2026
29 Jan 2026
Supply, Installation, Testing and Commissioning of on-grid Solar Photovoltaic Power Plant conforming to MNRE specifications as amended, consisting of C-Si Mono/C-Si Poly/ Mono PERC halfcut silicon solar cells, net metering facility, necessary protections, earthing, mounted on GI structure of suitable strength with incorporation of following components as required to complete the project successfully:- (a) Solar Photovoltaic Module of capacity 330 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 19% PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. [Make: Vikram Solar / Adani / SOVA / Goldi Green / BHEL / PV Power Tech / Lubi / Nano / Maxx / Navitas / Navi Solar / Tata Solar / Panasonic / WAAREE] (b) Power Conditioning Unit (PCU) of 350-800 V or higher DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. [Make: ABB/Thea/Delta/Schneider/Sungrow/Power one/ SMA/ Solar Edge/Solis/Frontier/Growatt)
(c) Data Monitoring System complete with accessories. (d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. (e) The proposed PV module panel frame structure shall be so fabricated as to be grouted on Roof top on its legs. The legs of the structure shall be fixed and grouted in the PCC/RCC foundation column made with 1:2:4 cement concrete. The foundation shall support SPV modules at a given orientation, absorb and transfer the mechanical wind speed of 120 KM/hr (minimum). (f) Conventional type Lightning protection of adequate quantity as per design, should be approved by EIC. (g) Surge voltage protection system as per guideline. (h) Connections & Interconnections by supplying & fixing of adequate size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables(Make:RR Kabel/Polycab/Havells) between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. (i) Manual sprinkler system complete with accessories for periodical cleaning of Solar Panel. *** [Detail Scope of work & Specification are furnished in the Annexure –I (General Specification) attached herewith] N.B.: Rates are inclusive of all taxes and duties.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 9.79 MB
BOQ_2427909.xls
BOQ • 0.28 MB
2911_Form.pdf
Tender Documents • 0.54 MB
Annexure-I.pdf
Additional Documents • 3.73 MB
Download all tender documents and submit your bid