Loading…
Loading…
Tender Value
₹19.4 L
EMD Value
₹19,000
Closing Date
28 Sept 2026, 5:00 pm6d left
Pardeep
Executive Engineer (E), Madhuban
Wiring work and electrical upgradation work in PS Sadar and PS City District Sonipat
2026_HBC_546320_1
20260DBC2CB7 5A8C 414E 877A 3460C25131CB57HHC
Open Tender
Electrical Works
Works
150 days
Sonepat
2 documents required · 2 mandatory
₹1,180
₹19,000
Yes
21 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR PART
[11.23]20 mm cement plaster 1:2 (1 cement : 2 stone dust). [Through Rate] | 170 | Sqm | 221 | ₹37,570 |
| 2 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 255 | Sqm | 113 | ₹28,815 |
| 3 | [11.57]Providing and laying average 6mm thick POP Coating on walls, Ceiling, beams and lintels etc. complete in all respects as approved by the Engineer-In-Charge. [Through Rate] | 139.06 | Sqm | 68 | ₹9,456.08 |
| 4 | [11.70]`Extra for using White Cement based primer modified with high performance polymers, applied as an undercoat for exterior/interior cementitious surfaces before paint
Technical Specifications:
i) Degree of whiteness (in terms of reflectance) )93%
ii) Fineness (Residue on 63 Micron Sieve) - Minimum 4.0
iii) Bulk Density - 0.8 to 0.9 kg/litre
iv) Viscosity by Brookfield, 50rpm, Spindle no RV 05 at 25 - 300cP to 600cP
v) Pot Life - Min. 180 minutes
vi) Coverage after 1st coat - 80-100 sqft/kg
vii) Adhesion cross-cut on 2 coat application after 48 hours - Min. 3B` [Through Rate] | 258.06 | Sqm | 13 | ₹3,354.78 |
| 5 | [11.73.1]Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer`s specifications including appropriate priming coat, preparation of surface, etc. complete. 1. On steel work [Through Rate] | 100 | Sqm | 80 | ₹8,000 |
| 6 | [11.73.2]Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer`s specifications including appropriate priming coat, preparation of surface, etc. complete. 2. On concrete work [Through Rate] | 120 | Sqm | 79 | ₹9,480 |
| 7 | [11.80]Providing and applying two coats of fire retardant paint on cleaned wood / ply surface @ 3.5 sqm per litre per coat including preparation of base surface as per recommendations of manufacturer to make the surface fire retardant. [Through Rate] | 34.56 | Sqm | 173 | ₹5,978.88 |
| 8 | [11.96.1]Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 1. New work (Two or more coats applied @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] | 510 | Sqm | 85 | ₹43,350 |
| 9 | [11.99.1]Painting on G.S. sheet with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : 1. New work (two or more coats) including a coat of approved steel primer but excluding a coat of mordant solution [Through Rate] | 80 | Sqm | 53 | ₹4,240 |
| 10 | [20.26.2]Cutting holes up to 23 cm through stone masonry or brick work in cement walls for pipes and making good including repointing, replastering and finishing according to existing finish where required. 2. 22.86 cm thick wall [Through Rate] | 16 | Each | 242 | ₹3,872 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_625952.xls
BOQ • 0.36 MB
1YBA99Z173840.pdf
Additional Documents • 8.18 MB
OT0173840.pdf
Other Document • 2.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .