Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.8 LAccepted-AOC | 1 | Accepted-AOC BEING L1 BIDDER.ACCEPTED | |
| 2 | 2₹11.9 L+₹2,741.45 (0.23%)Rejected-AOC | 2 | Rejected-AOC BEING L2 BIDDER.REJECTED |
| Sl No | Description | Qty | Unit | WILSON THOMAS L1 | P V BABYCHAN L2 |
|---|---|---|---|---|---|
| 1.00Appendix A | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 31.38 | cum | 257.63 ₹8,084.43 Lowest | 257.63 ₹8,084.43 Lowest |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 47.07 | cum | 2,967.19 ₹1,39,665.63 Lowest | 2,967.19 ₹1,39,665.63 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 23.54 | cum | 7,932.89 ₹1,86,700.57 Lowest | 7,932.89 ₹1,86,700.57 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 375.2 | sqm | 386.16 ₹1,44,887.23 Lowest | 390 ₹1,46,328 |
| 1.00 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 48.92 | cum | 8,569.14 ₹4,19,202.33 Lowest | 8,569.14 ₹4,19,202.33 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.88 | cum | 9,235.97 ₹63,589.65 Lowest | 9,235.97 ₹63,589.65 Lowest |
| 1.01 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) | 557.8 | sqm | 317.3 ₹1,76,989.94 Lowest | 320 ₹1,78,496 |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 19 | kg | 140.41 ₹2,667.79 | 130 ₹2,470 Lowest |
| 1.01 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 919.09 ₹4,595.45 Lowest | 919.09 ₹4,595.45 Lowest |
Tender Value
₹11.9 L
EMD Value
₹29,659
Closing Date
17 Oct 2025, 4:30 pmClosed
Assistant Executive Engineer
ASSISTANT EXECUTIVE ENGINEER MI SUBDIVISION ALUVA
ANNUAL MAINTENANCE
2025_Irrig_808383_1
IRR/IA/TR/3780/2025_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
240 days
PATTIMATTOM
PLEASE REFER TENDER DOCUMENTS
10 documents required · 10 mandatory
₹2,760
Yes
₹29,659
Yes
13 Nov 2025
10 Oct 2025
21 Oct 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
10 Oct 2025 - 17 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1347928.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
0.05 MB
Document
2.40 MB
Document
0.08 MB
Document
0.05 MB
BOQ
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .