| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.7 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹8.9 L+₹21,073.81 (2.43%)Rejected-AOC | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | A M YOOSAF L1 | FAHAD A Y L2 |
|---|---|---|---|---|---|
| 1.00Construction of bridge near ch:39.200 km | |||||
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 2.43 | cum | 3,671.89 ₹8,922.69 Lowest | 3,690 ₹8,966.7 |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 19.71 | cum | 1,197.33 ₹23,599.37 Lowest | 1,200 ₹23,652 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 30.06 | cum | 257.63 ₹7,744.36 Lowest | 270 ₹8,116.2 |
| 1.00 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 10.3 | cum | 6,174.34 ₹63,571 Lowest | 6,300 ₹64,864.8 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 15.74 | cum | 7,932.89 ₹1,24,863.69 Lowest | 7,992 ₹1,25,794.08 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.8 | sqm | 386.16 ₹1,853.57 Lowest | 390 ₹1,872 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 42.74 | sqm | 1,008.55 ₹43,105.43 Lowest | 1,020 ₹43,594.8 |
| 1.01 | OD40003/2025-2026:PVC WEEP HOLES - Providing weep holes using 110 mm dia . PVC pipe working pressure 6 kg / sq.cm including cost of materials,conveyance,labour charges etc. complete. | 30 | metre | 260.06 ₹7,801.8 Lowest | 275 ₹8,250 |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 17.4 | cum | 8,364.57 ₹1,45,543.52 Lowest | 8,500 ₹1,47,900 |
Tender Value
₹8.7 L
EMD Value
₹21,711
Closing Date
10 Jun 2026, 11:00 amClosed
Roshni S S
CIP Subdivision Pazhayannur
MLA-SDF-2025-26-Chelakkara Constituency-Construction of bridge at Cheerakuzhy Canal-Karuvampadiroad in Desamangalam Panchayath-General Civil Work
2026_Irrig_853581_1
IRR/IA/TR/203/2026_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
Cheerakuzhy
Please refer tender documents
8 documents required · 8 mandatory
₹1,915
Yes
₹21,711
Yes
1 Jul 2026
2 Jun 2026
11 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
2 Jun 2026 - 10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of bridge near ch:39.200 km | |||||
| 1.001 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | - | cum | - | - |
| 1.002 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | - | cum | - | - |
| 1.003 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.004 | 60.7.9:RR with Departmental. Stone - Random rubble masonry using departmental rubble in foundation and plinth including through and bond stone and levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand). | 1 | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 1 | sqm | - | - |
| 1.007 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | - | sqm | - | - |
| 1.008 | OD40003/2025-2026:PVC WEEP HOLES - Providing weep holes using 110 mm dia . PVC pipe working pressure 6 kg / sq.cm including cost of materials,conveyance,labour charges etc. complete. | - | metre | - | - |
| 1.009 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1442581.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
preliminaryagreement.pdf
Tender Documents • 0.25 MB
ipact.pdf
Tender Documents • 0.01 MB
epay.pdf
Tender Documents • 0.01 MB
fot.pdf
Tender Documents • 0.25 MB
sbd.pdf
Tender Documents • 1.64 MB
affid.pdf
Tender Documents • 0.10 MB
BOQ_1442581.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .