| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | ₹2.2 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹2.2 L+₹2,385.98 (1.08%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | ₹2.2 L+₹2,385.98 (1.08%) | L2 | Rejected-Finance higher than L1 |
| 3 | L3₹2.2 L+₹2,451.06 (1.11%)Rejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹2.2 L+₹2,451.06 (1.11%) | L3 | Rejected-Finance higher than L1 |
Tender Value
₹2.2 L
EMD Value
₹5,000
Closing Date
27 Jun 2026, 10:00 amClosed
Executive_Engineer_NTKMD_PHED
Utility_Bldg__Beside_Delhi_Public_School_AA_ID_New_Town_Kol_700156
Overhauling of HT and other LT systems at Jatragachi DPS Pump House at New Town under NTK Project.
2026_PHED_1025818_3
PHE/NTKMD/e-03 of 2026-27
Open Tender
Project Work
Percentage
30 days
WORK
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
7 Sept 2026
30 May 2026
29 Jun 2026
30 May 2026
27 Jun 2026
30 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Servicing, Testing complete with demoisturizing, de-sulphating, HV Test of Transformers (2.5MVA) 2 Nos. + 150KVA (2 Nos.), 33 KV VCB (4 Panels), 6.6KV Breakers (12 Nos.) Panelss, 6.6KV Capacitor Panels (4 Nos.), Relay Testing configuration, LT Panels, Battery Charger Panel, LP Buttons (8 Nos.) for Pumps & Actuators, cleaning & servicing, Oil Test [Electric Strength (BDV), Dielectric Dissipation Factor(Tan Delta), Dissolved Gas Analysis, Specific Resistance (Resistivity), Water Content] of Transformers all complete after necessary drawout of each 33KV Breakers & 6.6KV Breakers, all Relays of Motor & Transformer Feeder Testing, all Tripping Test conducting, all manual & Contacts mechanism servicing, Earth Test, IR Value recorded, Report submission all complete as per direction and to the entire satisfaction of the EIC.
(Report should be submitted as per Annexure I, II & III)
N.B. : Within one year after the overhauling if any breakdown will occur, the agency should attend the site within two hours and complete the work within six hours in emergency basis. | - | ITEM | 0.29 | - |
| 6 | Add : 18% GST | - | ITEM | - | - |
| 7 | Add : 1% Cess | - | ITEM | 1 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.97 MB
Tendernotice_2.pdf
PDF • 0.90 MB
Tendernotice_3.pdf
PDF • 0.56 MB
Tendernotice_4.pdf
PDF • 0.04 MB
Tendernotice_5.pdf
PDF • 0.44 MB
Tendernotice_6.pdf
PDF • 0.45 MB
BOQ_2520480.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .