Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹50.0 L
EMD Value
₹50,000
Closing Date
4 Jul 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Carrying out ROW Validation/Demarcation with respectto Village Map/JM Sheet And Staking out ROW UTM Coordinate for Karjan Right Bank Main Canal and Gora Distributary including minors, Ta. Nandod and Garudeshwar, Di. Narmada.
315074
11 of 2026-27
Open
Civil - All
Works
Narmada
9 documents required · 9 mandatory
₹1,500
EXECUTIVE ENGINEER IRRIGATION PROJECT DIVISION NO.4, RAJPIPLA
₹50,000
19 Jun 2026
19 Jun 2026
19 Jun 2026
4 Jul 2026
19 Jun 2026
120 days
Item No Quantity Unit Amount
specifications) figures
Carrying out ROW Validation/Demarcation with respect to Village Map or JM Sheet And
1 also collection of all map and Existing Field DGPS UTM CO-ordinate Superimpose. 111.825 km 14800.00
Preparation of Final DGPS UTM Co-ordinate.
Staking out ROW with respect to JM Sheet, Finalization of DGPS UTM Co-ordinate for
using DGPS Instruments. Providing and Fixing TBM Stone (Size 230 mm x 230 mm x
2 1000mm) of ROW at Every 1 Km and Indicator Stone (Size 150 mm x150 mm x450 mm) of 111.825 km 29900.00
ROW at Every 50 Mt Both Stone Painted red on top as per Point Marking and Final DGPS
UTM Co-ordinate.
Rupees Forty Nine Lakh Ninety Eight Thousand Five Hundred Seventy Seven and Fifty Paisa Only
I/We am/are willing to carry out the work at………………. % above/below percent (Should be written in figures and words) of the estimated rate mentioned above.
Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Deduct………% below
In words In words
The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge for which no extra payment shall be
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.: MIS102010/17/K1
4 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost of difference of
cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Signature of Contractor Deputy Executive Engineer
Irrigation Project Subdivision No.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT demarcation 202627-.pdf
SBD demarcation 202627.pdf
Technical Specification Demarcation.pdf
BOQ Demarcation.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .