| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.4 LAccepted-AOC | 1 | Accepted-AOC Lowest-I | |
| 2 | 2₹12.8 L+₹47,451 (3.84%)Rejected-Finance | 2 | Rejected-Finance Lowest-II |
Tender Value
Refer Docs
EMD Value
₹31,100
Closing Date
27 Sept 2022, 4:00 pmClosed
DIGP GC CRPF GREATER NOIDA
GC CRPF GAUTTAM BHUDHA NAGAR GREATER NOIDA UP PIN 201306
Annual Maintenance Contract for High Tension Electrical Equipment Electrical Sub-Station3 Nos Included HT and LT Panel Switches Breakers, Command and Control System, Communication Network installed at GC,CRPF Greater Noida.
2022_CRPF_710691_1
L.VII-1/2022-23-GC-NDA-MW
Open Tender
Miscellaneous Services
Item Rate
365 days
GC CRPF GREATER NOIDA(UP)
As per NIT Doument.
14 documents required · 14 mandatory
₹0
₹31,100
Yes
1 Dec 2022
7 Sept 2022
28 Sept 2022
7 Sept 2022
27 Sept 2022
7 Sept 2022
7 Sept 2022 - 27 Sept 2022
One Operator/Electrician/Line-Man per day (24x7)
Existing HT Panels,LT Panel ,Transformers,Automatic control panel with capacitor, Distribution PANEL ,Feeder Pillar.3 Nos H.T. PANEL & H.T. LINE:The panel shall be maintained as per the frequency indicated below. Shut down in prescribed proforma must be taken before attending to this panel. Solid earthing must be done after making the busbars dead. Only licensed and registered Technician / Supervisor will be allowed to attend to H.T. SystemFor panel, insulation test for phase to phase and phase to earth with 5000 v meggar are to be carried out once in a year and to furnish certificate. To check overheating & Temperature rise once in month.
10 Nos TRANSFORMER 750 to 1600 KVA DRY TYPE CAST RESIN TRANSFORMERS 11KV /433V:Dehydration and filtration of dirty transformer oil for transformer with dehydration filter machine. Supply and topping of transformer oil in conservator tank and including replacement of dirty silica gel in 5 transformers.Various connections of the transformer e.g. L.T. Connection neutral & Body – earthing are to be checked once in three months and if found loose is to be tightened. Bushings are to be examined for crack and dirt deposit and are to be cleaned or replaced as necessary once in three months. Checking of neutral earth and equipment body earth once in a year. Insulation testing of the following once in three months. i. Between L.T. and Earth with 1000 v meggar ii. Between H.T. and Earth with 5000 v meggar iii. Between H.T. and L.T winding with 5000 v meggarTo check noise /humming sound & temperature rise (over heating) once in three month.General cleaning of transformer to keep if free from dust and soot’s once in three month. The Agency is liable to furnish certificate regarding c & d above.
PAN INFRA OVERSEAS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .