| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.6 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹47.8 L+₹19,554.57 (0.41%)Rejected-AOC | L2 | Rejected-AOC L2 bidder | |
| 3 | Rejected-Technical | - | Rejected-Technical 1. Does not fulfill technical qualifying criteria. 2 Does not mention ban in Chamera PH in NHPC and information about litigation, arbitration was not submitted, hence misled information.3-details of manpower,equipment resources not submitted |
Tender Value
₹48.1 L
EMD Value
₹96,500
Closing Date
6 Oct 2020, 5:00 pmClosed
Executive Engineer (Civil-II)
Vyasi Project Lakhwar Bhawan, Dakpathar, Dehradun
Design and Construction of Steel Tank at Surge Shaft Top Bench for Fire Protection System of Power House Building of Vyasi HEP at Hathiyari , Dehradun
2020_UJVN_25761_1
09/UJVNL/03/EE (Civil-II)/Vyasi HEP/2020-21
Open Tender
Civil Works
Item Rate
150 days
Hathiyari, Vikasnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
DGM (Civil) Vyasi Project, UJVN Limited, Dakpathar
₹96,500
16 Dec 2020
26 Aug 2020
9 Oct 2020
26 Aug 2020
6 Oct 2020
26 Aug 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing MS Galvanized Fire Fighting pipe,Round,thickness 1 mm to 12 mm upto 600 mm dia
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete On steel work
Architecture/Structure Consultancy
ALPHA PACIFIC SYSTEMS PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .