Executive Director Gujarat Council of Science City Science City Road,
Repairing and Color works at Science City Campus, Ahmedabad
344268
GCSC/Civil/Color/2026/130
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹1,770
Gujarat Council of Science City, Ahmedabad
₹1.1 L
11 Sept 2026
11 Sept 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
Name of Work: - Repairing and Color works at Science City Campus,
Gujarat Council of Science City
Village Hebatpur, Sola Santej Road,
Nr. Science City Cross Road, Off Sarkhej Gandhinagar Highway,
Ahmedabad -380060
Phone: 91-79-29703122 Email: [email protected] Website: -www.sciencecity.gujarat.gov.in
Tender Notice: - GCSC/Civil/Color/2026/XX
GCSC/Civil/Color/2026/ Date: /08/2026
Sub: Repairing and Color works at Science City Campus, Ahmedabad
Online E- tenders are invited for the work as described in the enclosed BOQ. The bids can
be filled in through (n) procure website: https:// www.Tender.nprocure.com period from 11-
Tender Fee & EMD Rs. 1500/+ 18% GST- (i.e. Rs 1770/-) & 1,12,000/- respectively in the
form of Demand draft of Nationalized Bank/scheduled bank to be drawn in favour of Gujarat
Council of Science City, payable at Ahmedabad.
The sealed cover of physical documents shall be super scribed: “Repairing and Color works
at Science City Campus, Ahmedabad, Ahmedabad.” Agencies having adequate experience
of similar type work will only be considered.
Terms &Conditions: -
1) The rates quoted shall include all taxes, levies, transportation and delivery at site.
2) The agency at his own cost shall replace any rejected material.
3) The rates quoted shall be valid for at least 6 months from the work order issued date
4) Order may not be placed for all items.
5) Order for part quantity shall be acceptable.
6) The complete work shall be done as directed by engineer in charge to the
satisfaction of site requirement.
7) The water & electricity if required for the current work shall be provided by GCSC at
one location only. Necessary arrangement for DG set may be done by contractor for
the work, if the electricity is not available at site of work. Contractor shall make his
own arrangement to carry the same at required site location, under strict supervision
and prior permission of GCSC.
8) Successful bidder shall submit security deposit @ 10% of contract value in the form
of BG, and it will be retained for the period up to 12 months after completion of the
work. Agency shall carry out defect found in the work during the warranty period at
9) Bids shall be accompanied by two separate Demand Drafts of tender fee and EMD.
Bids shall be filled in through above mentioned web site in online format, only.
10) Tender fee & EMD shall be submitted along with supporting documents for period
from 11-09-2026 to 28-09-2026. 18.00 hrs. Through Speed Post/ courier/ Hand
11) If tender fee & EMD is not received till 28-09-2026. 18.00 hrs., bid shall be rejected.
12) Only the agencies that have executed this type of work having experience of such
work and examined the site shall fill in the bids.
13) EMD of unsuccessful bidders shall be refunded without interest after approval of the
tender of the work.
14) The work completion period is 120 days from the date of issue of work order / as
mentioned in the work order.
15) Tenders (technical bid) shall be opened on 29-09-2026 pm in the office of GCSC, if
possible. Financial bids of only those bidders shall be opened who are technically
16) Any mix design for concrete work of tender item shall be in the scope of work of the
agency. No reimbursement towards such charges shall be made by GCSC.
17) The agency shall prepare and submit colour samples for approval by the competent
authority prior to commencement of the colour work. Since there are various
buildings, structures and walls within the campus, the competent authority may
require different colours, shades or colour combinations for different walls/areas. The
agency shall be bound to execute the colour work strictly as per the approved
samples and the specific requirements/instructions of the competent authority. No
additional claim shall be entertained on account of variation in colour, shade or colour
combination as instructed by the authority..
Yours faithfully,
Executive Director,
Gujarat Council of Science City.
(To be submitted by Tenderer)
The Executive Director,
Gujarat Council of Science City,
Sub: - Repairing and Color works at Science City Campus, Ahmedabad
Having examined the drawings, specifications designs and schedule of quantities relating to
the work specified in the memorandum hereinafter set out and having visited and examined
the site of the works specified in the said memorandum and having acquired the requisite
information relating thereto as affecting the tender. I/We hereby offer to execute the works
specified in the said memorandum at the rates mentioned in the attached Schedule of
Quantities and in accordance in all respects with the specifications, design, drawings and
instructions in writing referred to in conditions of tender, the Articles of Agreement, Special
Conditions, Schedule of Quantities and Conditions of Contract and with such materials as
are provided for by, and in all other respects in accordance with such conditions so far as
they may be applicable.
Yours faithfully
(Director/Partner/Authorized Signatory)
(To be submitted in a separate envelope along with Technical Bid)
1. Experience of Similar kind of work :
(With supporting documentary proof)
2. Resource Mobilization and allocation :
For this specific project
(With supporting documents)
3. Completion time and period as :
envisaged by bidder
4. Experience of co-coordinating with :
nominated/specialized contractors:
6. Quality accreditation certificate :
7. Any other specific information :
which you feel will help in better
evaluation of your offer, as may
N.B. : Please give Annexure number of each evidence.
PREQUALIFICATION CRITERIA
1. The Bidder should be registered firm. (E1 and above)
2. Bidder must submit Tender fees and EMD as detailed in the above Tender Notice.
3. Bidder has to submit minimum three years’ experience certificate (with Form 3A) of
similar works/civil works.
4. Bidder has to submit GST certificate.
5. Bidder has to submit PAN certificate.
6. Bidder has to submit Solvency Certificate of Rs 10.0 lakhs from Nationalized or
Scheduled bank.
7. Bidder has to submit minimum average annual Turnover of Rs. 70 lakhs for the last
three financial years with Registered CA certificate.
Note : Bidders have to full fill all the above criteria failing which they will be disqualified.
Decision of GCSC shall be final and binding on all concerned
.ANNEXURE - THE CONDITIONS HEREINBEFORE REFERED TO
1) In constructing these Conditions, the Specification Schedule of Quantities and Contract
Agreement, the following words shall have the meanings herein assigned to them expect
where the subject or context otherwise requires.
a) “Employer”,” GCSC” Or Owner :shall mean Gujarat Council of
Science City, and shall include its
assigns and successors.
b) “Contractors” shall mean (Name & Address)
and shall include his (their) legal
representative’s assigns or successors.
c) “Site” :shall mean the Site of Contract Works,
,i.e. at Science CityVia Sola Under
bridge, Sola Santej Road, Off Sarkhej
Ahmedabad Highway, Ahmedabad
including and building and
erections thereon and any other land
(inclusively), as aforesaid, allotted by
the employer for the Contractors use.
d) “This Contract” : shall mean Articles of Tender
Agreement, Letter of Intent the, Special
Conditions, the Conditions the
appendix, the Schedule of Quantities
and Specifications, Drawings etc.
attached hereto and duly signed.
e) “Notice in writing”: or written notice shall mean a notice in
written, typed or printed characters
sent (unless delivered personally or
otherwise proved to have been
received), by registered post to the last
known private or business address or
registered office of the addressee and
shall be deemed to have been received
within 24 hours of dispatch when in the
ordinary course of post, it would have
f) “Act of Insolvency”: shall mean any Act of Insolvency as
defined by the Presidency Towns
Insolvency Act, or the Provincial
Insolvency Act or any amending such
g) “Net Prices”:
If in arriving at the Contract amount the
Contractor shall have added to or
deducted from the total of the
items in the Tender any sum
either as a percentage or otherwise,
then the net price of any item in the
Tender shall be the sum arrived at by
adding to or deducting from the
actual figure appearing in the Tender as
the price of that item a similar
percentage of proportion by the
Contractor of any prime cost items and
provisional sums of money shall be
deducted from the total amount of the
deducted from the total amount of the
Tender. The expression “net rates” or to
the Contract or accounts shall be held
to mean rates or prices so arrived at.
h)”Work’’ The expressions works or work shall
theworks by or by virtue of contract
contracted to be Executed whether
temporary or permanent and Whether
original, altered, substituted or
additional by the Contractor
2) SCOPE OF CONTRACT:
The Contractor shall carry out and complete the said work in every respect in
accordance with this Contract and of with the directions of and to the satisfaction of
Owner/Architect. The Architect/GCSC may in his absolute discretion and from time to
time issue further drawings (if applicable) and/or written instructions, details directions
and explanations, which are hereafter collectively, referred to as Authority’s instructions.
In regard to: -
a) The variations or modification of the design quality or quantity of works of the
additions or omission or substitution of any work.
b) Any discrepancy in the drawings or between the Schedule of Quantities and/or
drawings and/or Drawings and or specification.
c) The removal from the Site of any materials brought thereon by the Contractor and the
substitution of any other material thereof.
d) The removal and/or re-execution of any works executed by the Contractor.
e) The dismissal from the works of any person employed thereupon.
f) The opening up for inspection of any work covered up.
g) The amending and making good of any defects under clause 19 hereon.
The Contractor shall for which comply with and duly execute any work, comprised in
such Architects instructions, provided always that the verbal instructions, directions, and
explanations given to the Contractor or his representative upon the works by the
Architect shall, if involving a variation, be confirmed in writing by the Contractor within
seven days, and if not dissented from in writing within a further seven days by the
Architect, such shall be deemed to be Architects instructions within the scope of the
VARIATION TO BE APPROVED BY THE EMPLOYER: -
Notwithstanding anything herein contained the Architect or his representative shall not,
without prior concurrence in writing of the Employer, issue any instructions, verbal or in
writing, which will result in the Employer having to pay the Contractor an additional and
all instructions issued to the Contractor should forth with brought to notice of the
Employer. The Contractor shall submit through the Architect, a statement of variations
giving quantity and rates duly supported by analysis of rates, vouchers, etc. The rates on
scrutiny and final acceptance by the Employer shall form a supplementary tender; the
Employer shall not be liable for payment of such variations until these statements are
sanctioned by him.
3) DRAWINGS AND SCHEDULE OF QUANTITIES AND AGREEMENT: -
The Contract shall be executed in triplicate and the Architects, the Employer and the
Contractor shall be entitled to one executed copy each for his use. The Contractor on the
signing hereto shall be furnished by the Architects free of cost, one copy of each of the
said Drawing and of the Specifications and one copy of all further drawings issued during
the progress of the works, any further copies required by the Contractor shall keep one
copy of the drawing on the work the Architects or his representatives shall at all
reasonable times have access to the same before the issue of the final Certificate to the
Contractor, he shall forthwith return to the Architect all Drawings and Specifications.
4) CONTRACTOR TO PROVIDE EVERYTHING NECESSARY AT HIS COST: -
The Contractor shall provide at his cost everything necessary for the proper execution of
the works according to the intent and meaning of the Drawing, Schedule of Quantities
and Specification taken together whether the same may or may not be particular shown
or described therein, provided that the same can be reasonably be inferred therefore,
and if the Contractor finds any discrepancy in the Drawings or between the Drawings,
Schedule of Quantities and Specifications, he shall immediately and in writing refer the
same to the Architect who shall decide which is to be followed.
5) AUTHORITIES NOTICES AND PATENTS: -
The Contractor shall confirm to the provisions of any Act of the legislature relating to the
works, and to regulations and bye-laws of any authority, and of any water electric supply
and other companies and/or authorities with and whose the systems the Structure is
proposed to be connected, and shall before making any variations from the Drawing or
Specifications that may be necessitated by so confirming, give to the Architect written
notice, specifying the variations proposed to be made and the reason for making it and
apply for instructions thereon. In case the Contractor shall not within ten days receive
such the provisions, regulations, or bye-laws in questions, and variations so necessitated
shall be debit with under respective Clause mentioned hereafter.
The Contractor shall bring to the attention of the Architect all notices required by the said
Acts, regulations or bye-laws to be given to any authority and pay to such authority, or to
any public office, all fees that may be properly chargeable in respect of the said work,
and lodge the receipt with the Architect.
The Contractor shall indemnity the Employer against all claims in respect of patent rights,
and shall defend all actions arising from such claims, and shall himself pay all royalties,
license fees, damages, cost and changes of all and every sort that may be legally
incurred in respect thereof.
6) SETTING OUT OF WORK :-
The Contractor shall set out the works and shall be responsible for the true and perfect
setting out of the same and for the correctness of the positions, dimensions, and the
alignment of all the parts thereof, if at any time any error in this respect shall appear
during the progress of the work or within the period of one year from the completion of
the works, the Contractor shall, if required at his own expenses, rectify such error to the
satisfaction of the Architect.
7) MATERIALS & WORKMANSHIP TO CONFIRM DESCRIPTION: -
All materials and workmanship shall so far as procurable be of the respective kinds
described in the Schedule of Quantities and/or Specifications and in accordance with the
Architects instructions and the Contractor shall upon the request of the Architect furnish
him with all the invoices, accounts, receipts and other vouchers to prove that the
materials comply therewith. The Contractor shall at his own cost arrange for and/or carry
any test of any material which the Architects may require.
8) CONTRACTORS SUPEREINTENT AND REPRESENTATIVE ON THE WORKS :-
The Contractor shall give all the necessary personal superintendence during the
execution of the works, and as long thereafter as the Architect may consider necessary
until the expiration of the Defect Liability Period stated in the Appendix hereto. The
Contractor shall , during the whole time of works are in progress employ competent
representatives who shall be in constantly attendance at work while the men are at work,
any directions, explanations, instructions, or notices given by the Architect to such
representative shall be held to be given to the Contractor.
9) DISMISSAL OF WORKMEN :-
The Contractor shall at the instruction of the Employer, immediately dismiss from the
works, any person employed thereon by him who may in the opinion of the Architect be
incompetent or misconduct himself and such person shall not be again employed on the
works without the permissions of the Architect / Owner.
10) ACCESS TO WORK :-
The Employer, the Architect and their responsible representatives shall at all reasonable
times have free access to the works and/or to the workshops, factories or other places
where materials are lying or from which they are being obtained the Contractor shall give
every facility to the Employer, the Architect and their representatives necessary for
inspection and examination and test of the materials and the workmanship. No persons
not authorized by the Employer or the Architect except the representative of Public
Authorities shall be allowed on the works at any time.
11) ASST.ENGINEER / SITE ENGINEER / CLERK - OF - WORKS :-
The term “Assistant Engineer / Site Engineer / Clerk-of-Works” shall mean the person
appointed and paid by the Employer and acting under the orders of the Employer to
inspect the works in the absence of the Architect, the Contractor shall afford the
Assistant Engineer / Site Engineer / Clerk-of-Works, every facility and assistance for
inspecting the works and materials and for checking and measuring time and materials.
Neither Assistant Engineer / Site Engineer / Clerk-of-Works nor any representatives or
the Architect shall have power to set out works or to revoke, alter, enlarge or relax any
requirements of the Contract, or to sanction any day work, additions, alterations,
deviations of omissions, or any extra work whatever except in so far as such authority
may be specially conferred by a written order of the Architect with the prior concurrence
in writing of the Employer.
The Assistant Engineer / Site Engineer / Clerk-of-Works, or any representative of the
Architect, or the Employer shall have power to give notice to the Contractor or to his
representative of non-approval of any work or materials and such work shall be
suspended or the use of such materials shall be discontinued until the decision of the
Architect is obtained. The work will be from time to time be examined by the Architect,
the Assistance Engineer or the Architects representative, but such examination shall not
in any way exonerate the Contractor from the obligations to remedy any defects which
may be found to exist at any stage of the works or after the same is completed, subject
to the limitations of this Clause, the Contractor shall take instructions only from the
12) ASSIGNMENT AND SUBLETTING: -
The whole of the works included in the Contract shall be executed by the Contractor and
the Contractor shall not directly or indirectly transfer, assign, or under-let the contract or
any part share thereof of any interest therein without the prior written consent of the
Employer and no undertaking shall relieve the Contractor from the full and entire
responsibility of the Contractor from active super intendance of the works during their
13) Alterations, Omissions or Variations
No. alterations, omissions or variations shall vitiate this contract, but in case the Architect
thinks proper at any time during the progress of the works to make any alterations in, or
additions to or omissions from, the work or any alteration in the kind or quality of
materials to be used therein and shall give notice thereof in writing under his hand to the
Contractor, the Contractor shall alter, add to, or omit from, as the case may be, in
accordance, with such notice, but the Contractor shall not do any work extra to or make
any alterations or additions to or omissions from the works or any deviations or additions
to or omissions from the contract, stipulation specifications or contract drawings without
the previous consent in writing of the Architect and the values of such extras, alterations,
additions or omissions shall in all cases be determine by the Architect with the prior
approval in writing of the Employer in accordance with the provision of the Clause
hereof, and these and the same shall be added to or deducted from the Contract
Amount, as the case may be accordingly.
14) SCHEDULE OF QUANTITIES: -
The Schedule of Quantities shall be deemed to have been prepared in accordance with
the Standard Method or Quantities Measurement.
Any error in description or in quantity or in omission of items from the Schedule of
Quantities shall not vitiate as ascertained but shall be rectified and the value thereof, as
ascertained under Clause 1 / hereof, shall be added to or deducted, from the Contract
Amount (as the case may be), provided that no rectification of errors, if any, shall be
allowed in the Contractor’s Schedule of Rates.
15) SUFFICIENCY OR SCHEDULE OF QUANTITIES: -
The Contractor shall be deemed to have satisfied himself before tendering as to the
correctness and sufficiency of his tender for the works and the prices stated in the
Schedule of Quantities and or the Schedule of Rates and prices which rates and prices
shall cover all his obligations under the Contract, and all matters and things necessary
for the proper completion of works.
16) MEASUREMENT OF WORK: -
The Architects may from time to time intimate to the Contractor and the Employer that he
requires to be measured, and the Contractor shall for with attend or send a qualified
agent to assist the Architect or the Architects representative or the Asst. Engineer / Site
Engineer / Clerk-of-works in taking such measurements and calculations and to furnish
all the particulars or to give all assistance required by any of them. Should the Contractor
not attend or neglect or omit to send such Agent then the measurement taken by the
Architect or a person approved by him shall be taken to be correct measurement of the
works. Such measurements are detailed in the specifications. The Contractor or his
Agent may at the time of measurement take such notes and measurement as he may
require. All authorized extra works, omissions and all variations made without the
Architects knowledge, if subsequently sanctioned by him in writing (with the prior
approval in writing of the Employer) shall be included in such measurement.
17) PRICES FOR EXTRAS, ETC ASCERTAINMENT OF: -
The Contractor may, when authorized, and shall, when directed in writing by the
Architects with the approval of the Employer, add to, omit from, or vary the works shown
upon the Drawings, or included in the Schedule of Quantities; both Contractors shall
make no addition, omission or variation without such authorization or direction. A verbal
authority or direction by the Architects shall, if confirmed by them in writing within seven
days, be deemed to have been given in writing. No claim for an extra shall be allowed
unless it shall have been executed under provisions of Clause hereof or by the authority
of the Architects with the concurrence of the Employer as herein mentioned. Any such
extra is herein referred to as authorized extra and shall be made in accordance with the
following provisions:
a) I) the net rates or prices in the original tender shall determine the valuation of the
extra work where such extra work is of similar character and executed under similar
conditions as the work priced therein.
II) Rates for all items, wherever possible, should be derived out of the rates given in
the Priced Schedule of Quantities.
III) Rate for varied/deviated or extra items to be worked out on the rates quoted in the
tender for the similar items only. Wherever it is not possible to base the rates for
varied/deviated or extra items on the tender quoted rates then the rate analysis as
per CPWD/SOR Rate Analysis is to be submitted by the Contractors with 15%
towards Contractors overheads. Labour and material constants shall be considered
from CPWD/SOR Rate Analysis. Market rates of materials & labour shall be
considered duly supported by original bills with payment details / Quotations to be
approved by Owner / PMC. 1 % of the derived cost of the item shall be allowed for
water and electricity charges and 15 % for contractor’s profit and overheads. For
items not available in above-mentioned documents, industry accepted standards
shall be adopted at the discretion of PMC subject to approval of Owner.
b) The net prices of the original tender shall determine the value of the items omitted,
provided if omissions vary the conditions under which only remaining items of works
are carried out, the prices for the same shall be valued under sub-clause (c) hereof.
c) Where the extra works are not of similar character and/or executed under similar
conditions as aforesaid or where the omissions vary the conditions under which any
remaining items of works are carried out , if the amount of the whole of the Contract
Works or to any part thereof shall be such that in the opinion of the Architect the net
rate or price contained in the Priced Schedule of Quantities or tender or for any item
of the work involves loss or expense beyond that reasonably contemplated by the
Contractor or is by reason of such omission or additions rendered unreasonable or
inapplicable, the Architect shall fix such other rate or price as in the circumstances he
shall feel reasonable and proper, with the prior approval in writing of the employer.
d) Where extra work cannot be properly measured or valued the Contractor shall be
allowed day work prices as the net rates stated in the tender or the Priced Schedule
of Quantities or, if not so stated, then in accordance with local day work rates and
wages for the district, provided that in either case vouchers specifying the daily time
(and if required by the Architect, the workman’s name) and materials employed to be
delivered for verification to the Architect or his representative at or before the end of
the week following that in which the work has been executed. The measurement and
valuation in respect of the Contract shall be completed within the “period of final
measurements” stated in the Appendix or if not stated then within six months of the
completion of the Contract works as defined in Clause 21 hereof.
18) UNFIXED MATERIALS WHEN TAKEN INTO ACCOUNT TO BE THE PROPERTY
OF THE EMPLOYER: -
Where in any certificate (or which the Contractor has received payment), the Architect
has included the value of any unfixed materials intended for and/or placed on adjacent to
the works, such materials shall become the property of the Employer and they shall not
be removed except for use upon the works, without the written authority of the Architect.
The Contractor shall be liable for any loss of or damage to such material.
19) REMOVAL OF IMPROPER WORKS: -
The Architect / Owner shall, during the progress of the works, have power to order in
writing from time to time the removal from the work within such reasonable time or times
as may be specified in order, of any materials which in the opinion of the Architect /
Owner are not in accordance with the specifications or the instructions of the Architect
the substitution of proper materials, the removal and proper re-execution of any work
executed with materials or workmanship not in accordance with the Drawings and
Specifications or instructions and the Contractor shall forth with carry out such order at
his own cost. In case of default on the part of the Contractor to carry out such order, the
Employer shall have the power to employ and pay other persons to carry out the same;
and all expenses consequent thereon, or incidental thereof, shall be deducted by the
Employer from any one due, or that may become due, to the Contractor.
20) DEFECTS AFTER VIRTUAL COMPLETION: -
Any defect, shrinkage, settlement or other faults which may appear within the Defect
Liability Period stated in the Appendix hereto or, if non stated then within One Year after
the virtual completion of the works, arising in the opinion of the Architect from materials
or workmanship not with accordance with the Contract, shall upon directions in writing of
the Architect, and within such reasonable time as shall be specified therein, be
corrected/rectified and made good by the Contractor, at his own cost, and in case of
default the Employer may employ and pay other persons to amend and make good such
defects, loss and expenses consequent thereon or incidental thereto shall be made
borne by the Contractor and such damage, loss and expenses shall be recoverable from
him by the Employer, upon the Architects Certificate in writing, from any money due or
that may become due to the Contractor, or the Employer, may in lieu of such amending
and making good by the Contractor deduct from any money due to the Contractor a sum,
to be determined by the Architect equivalent to the cost of amending such work and in
the event of the amount retained under Clause 32 hereof being insufficient recover the
balance from the Contractor, together with any expenses the Employer may have
incurred in connection therewith. Should any defective work have been done or material
supplied by any Sub-Contractor employed on the works who was been nominated or
approved by the Architect as provided in Clause 12 and 22 hereof, the Contractor shall
be liable under the provisions of this Clause and Clause 2 hereof, the Contractor shall
remain liable under the provision of this Clause notwithstanding the signing of any
Certificate or the passing of any accounts, by the Architect.
21) CERTIFICATE OF VIRTUAL COMPLETION & DEFECTS LIABILITY PERIOD: -
The work shall not be considered as completed until the Architect has certified in writing
that they have been virtually completed. The Defect Liability Period shall commence from
the date of such Certificate.
22) NOMINATED SUB-CONTRACTORS: -
All Specialist, Merchants, Tradesmen and others executing any work of supplying and
fixing any goods for which prime cost prices or provisional sums are included in the
Schedule of Quantities and / or Specifications who may be nominated or selected by the
Architect / Owner and hereby declared to be Sub-Contractors employed by the
Contractors and are herein referred to as nominated Sub-Contractors. No nominated
Sub-Contractor shall be employed on or in connection with the works against whom the
Contractor shall make reasonable objection or (save where the Architect and Contractor
shall otherwise agree) who will not enter into a Contract providing: -
a) That the nominated Sub-Contractor shall indemnify the Contractor against the same
obligations in respect of the Sub-Contract as the Contractor is under in respect of this
b) That the nominated Sub-Contractor shall indemnify the Contractor against claims in
respect of any negligence by the Sub-Contractor, his servants or agents or any
misuse by him or them or any scaffolding or other plant, the proper of the Contractor
or under any workmen’s compensation Act in force.
c) Payment shall be made to the nominated Sub-Contractor within fourteen days of his
receipt of the Architects Certificate provided that before any Certificate is issued, the
Contractor shall upon the request furnish to the Architect proof that all nominated
Sub-Contractor accounts included in the previous Certificate have been duly
discharged; in default whereof the Employer may pay the same upon a Certificate of
the Architect and deduct the amount thereof from any sums due to the Contractor.
The exercise of this power shall not create private of Contract as between Employer
and Sub-Contractor.
23) OTHER PERSONS EMPLOYED BY THE EMPLOYER: -
The Employer reserves the rights to use premises and portions of the site for the
execution of the work not included in this Contract, which it may desire to have carried
out, by other persons, and the Contractor shall allow all reasonable facilities for the
execution of such work except by special arrangement by the Employer. Such work shall
be carried out in such manner as not to impede the progress of the works included in the
Contract and the Contractor shall not be responsible for any damages or delay which
may happen to or occasioned by such work.
24) INSURANCE IN RESPECT OF DAMAGE TO PERSONS AND PROPERTY: -
The Contractor shall be responsible for all injury to persons, animals or things, and for all
structural and decorative damage to property which may arise from the operation or
neglect of himself or any nominated Sub-Contractor or any employee of either, whether
such damage or injury arises from carelessness, accident or any other cause whatever in
any way connected in the carrying out of this Contract. This Clause shall be held to
include internal any damage to buildings, whether immediately adjacent or otherwise,
and any damage to the roads, streets, foot-paths, bridge or ways as well as all damage
caused to the buildings and works forming the subject of this Contract by frost, rain, wind
or other inclemency of weather. The Contractor shall indemnify the Employer and hold it
harmless in respect of all and any expenses arising from such injury or damage to
persons or property as aforesaid and also in respect of any claim made in respect of
injury and damage under any Act of any Legislature of otherwise and also in respect of
any award of compensation or damages consequent upon such claims.
The Contractor shall reinstate all damage of every sort mentioned in this Clause, so as to
deliver up the whole of the Contract Works complete and perfect in every respect and so
as to make good or otherwise satisfy all claims for damages to the property of third
The Contractor shall indemnify the Employer against all claims which may be made
against the Employer by any member of the Public or third party in respect of anything
which may arise in respect of the works or in consequence thereof and shall at his own
expenses arrange to effect and maintain, until the virtual completion of the Contract, with
an approved offices, a Policy (CAR) of insurance in the name of the Employer and the
Contractor against such risks and deposit such policies with the Architect from time to
time during the currency of this Contract. The Contractor will also similarly indemnify the
Employer whether under the Workmen’s Compensation Act or play other statute in force
during the currency of this Contract or at Common Law in respect of any Employee of the
Contractor or any Sub-Contractor and shall at his own expense effect and maintain, until
the virtual completion of the Contract, with an approved office, a Policy of Insurance in
the joint name of the Employer and the Contractor against such risks and deposit such
policy or policies with the Architect from time to time during the currency of the Contract.
The Contractor shall be responsible for any liability which may be excluded from the
Insurance Policies above referred to and also for all other damages to any person,
animal or property arising out of incidental to the negligent or defective carry in out of this
Contract. He shall also indemnify the Employer in respect of any cost, charges or
expenses arising out of any claims or proceeding and also in respect of any award of
compensation and damages arising there from.
The Employer shall with the concurrence of the Architect, be entitled to deduct the
amount of any damage, compensation, cost, charges and expenses arising from or
accruing from or in respect or, any such claims or damage from any or all sums due or to
become due to the Contractor without prejudice to the Employers other rights in respect
25) FIRE INSURANCE: -
a) The Contractor shall, within seven days from the date of Commencement of Works,
insure the works at his cost and keep them insured until the virtual completion if
the work, against loss or damages by fire with an Office to be approved by the
Architect in the joint name of the Employer and the Contractor (the name of the
former being placed first in the Policy), for appropriate value decided by the employer
of the contract amount. The Contractor shall deposit the policy and receipts for the
premium with the Owner within Sixty days from the Commencement of the works,
unless otherwise instructed by the Architect. in default of the Contractor insuring as
provided above, the Employer of the Architect on his behalf, may so insure the works
and may deduct the premier paid from any money due or may become due to the
Contractor without prejudice to the other rights of the Employer in respect of such
default. In case it becomes necessary to suspend the works, the Contractor shall as
soon the claim under the Policy is settled, or work reinstated by the Insurance Office,
should they elect to do so, proceed with all due diligence with the completion of the
works in the same manner as though the incident had not occurred and in all
respects under the same conditions of the Contract. The Contractor, in case of
rebuilding of reinstatement after fire, shall be entitled to such extension of time for
completion as the Architect deemed fit.
b) The amount so due as aforesaid shall be the total value of the works duly executed
and of the Contract and of the Contract materials and goods delivered upon the Site
for use in works and including the date not more than seven days prior to the date of
the said Certificate less the amount to be retained by the Employer (as hereinafter
provided) and less any installments previously paid under this Clause. Provided that
such Certificate shall only include the value of the materials and goods as and from
time to time as they are reasonably property and not prematurely brought upon the
Site and then only if properly Stored and/or protected against weather.
26) DATE OF COMMENCEMENT AND COMPLETION: -
The Contractor shall be allowed admittance to the a Site on the Date of Commencement
stated in the Appendix hereto, or such later date as may be specified by the
Owner/Architect and he shall there upon and forth with begin the works and shall
regularly proceed with and complete the same (except the painting or other decorative
work as the Architect may desire to delay) on or before the Date of Commencement
stated in the Appendix subject never the less to the provision for extension of time
hereinafter contained.
27) DAMAGES FOR NON COMPLETION: -
If the Contractor fails to complete the works by the date stated in the Appendix or within
any extended time or under the Clause hereof and the Owner/Architect certifies in writing
that in his opinion, the same ought reasonably to have been completed, the Contractor
shall pay the Employer the sum named in the Appendix as “Liquidated Damages” for the
period during which the said works shall so remain incomplete and the employer may
deduct such damages from any money due to the Contractor. Liquidated damage shall
0.10 % of the contract amount per day of delay subject to a Ceiling 10% of the
Final contracted amount
28) BONUS/ INCENTIVE FOR TIMELY COMPLETION: -
This clause no. 28 is to be considered as DELETED.
29) DELAY AND EXTENTION OF TIME: -
If in the opinion of the Architect/GCSC the work be delayed (a) by force majeure or (b) by
reason of any exceptionally inclement weather of (c) by reason of proceedings taken or
threatened by or dispute with adjoining or neighboring owners or public authorities
arising otherwise then through the Contractor own default or (d) by the works and delay
of the other Contractors or tradesmen engaged or nominated by the Employer or the
Architect and not referred to in the Schedule of Quantities and/or specification or (e) by
reasons of the Architect instructions as per Clause 2 here if or (f) by reason of civil
commotion, local combinations of workmen or strike or lock-out affecting any of the
building trades or (g) in consequence of the Contractor not having received in due time
necessary instructions from the Architect for which he shall specifically applied in writing
or (h) from other causes which the Architect may certify as beyond the control of the
Contractor or (i) in the event, the value of work exceeded the value of the Priced
Schedule of Quantities owing to variation, the Architect may with the previous approval in
writing of the Employer make a fair and reasonable extension of time for the completion
of the Contract Works; in case of such strike or lockout, the Contractor shall as soon as
may be, give written notice thereof to the Architect, but the Contractor shall nevertheless
constantly use his endeavor to prevent delay and shall do all that may reasonably be
required to the satisfaction of the Architect to proceed with the work.
30) FAILURE BY CONTRATOR TO COMPLY WITH ARCHITECT/GCSC
INSTRUCTIONS :-
If the Contractor after receipt of written notice from the Architects requiring compliance
within ten days fails to comply with such further drawings and / or Architects instructions,
the Employer may Employ and pay other persons to execute any such work whatsoever
that may be necessary to give effect thereto, and all costs incurred in connection
therewith shall be recoverable from the Contractor by the Employer on the Certificate of
the Architect as a dept. or may be deducted by him from any moneys due to the
31) TERMINATION OF CONTRACT BY THE EMPLOYER:-
If the Contractor being an individual or a Firm, commits any act of insolvency or shall be
adjudged an insolvent or being an Incorporate Company, shall have an order for
compulsory winding up, voluntarily or subject to the supervision of the Court and the
Official Assignee or the Liquidator in such acts of insolvency and winding up, as the case
may be, shall be unable within seven days after notice to him requiring him to do so, to
show the reasonable satisfaction of the Architect that he is able to carry out and fulfill the
Contract and to give security thereof, of so required by the Architect.
Or if the Contractor (whether an individual, Firm or incorporated Company) shall suffer
execution or other process of Court attaching property to be issued to the Contractors.
Or shall suffer any payment under this Contract to be attached by or on behalf of any of
the creditors of the Contractors.
Or shall assign or sublet this Contract without the consent in writing of the Employers first
Or shall charge or encumber this Contractor or any payment due of which may become
due to the Contractor hereunder.
Or if the Architect shall certify in writing to the Employer that the Contractor:
i) Has abandoned the Contract, or
ii) Has failed to commence the works or has without any lawful excuse under these
conditions suspended the progress of the works for fourteen days after receiving
from the Architect notice to proceed or
iii) Has failed to proceed with the works with such due diligence and failed to make
such due progress as would enable the works to be completed within the time
agreed upon, or
iv) Has failed to remove materials from the Site or to pull down and replace work for
seven days after receiving from the Architect written notice that the said materials
or work were condemned and rejected by the Architect under these Conditions, or
v) Has neglected or failed persistently to observe and perform all or any of the acts,
matters or things by this Contract to be observed and performed by the
Contractor to observe or perform the same.
Then and in any of the said cases the Employer may, notwithstanding any previous
waiver, after giving seven days’ notice in writing to the Contractor, determined the
Contractor, but without thereby affecting the powers of the Architect or obligations of
liabilities of the Contractor, the whole of which shall continue in force as fully as if the
Contract has not been so determined, and as if the work subsequently executed had
been executed by or on behalf of the Contractor. And further, the Employer by his agent
or servants may enter upon and take possession of the work and all plant, tools,
scaffoldings, shed, machinery, steam and other power utensils and materials lying upon
the premises or on the adjoining land or roads and use the same as his own property or
may employ the same by means of his own servants and workmen in carrying on and
completing the works or by employing any other Contractor shall not in any way interrupt
or do any act, matter or things to prevent or hinder such other Contractor or other person
employed for completing or finishing or using the materials and plant for the work. When
the work shall be completed or as soon as thereafter as convenient the Architect shall
give a notice to the Contractor to remove his surplus materials and plant and should the
Contractor fail to do so within the period of fourteen days after receipt thereof by him, the
Employer may sell the same by public auction, and give credit to the Contractor for the
net amount realize. The Architect shall thereafter ascertain and certify in writing under his
hand what (if anything) shall be due or payable to, or by the Employer, for the value of
the said plant and materials so taken possession by the Employer and the expenses and
loss which the Employer shall have been put to in procuring the works to be completed
and the amount, if any, owing to the Contractor and the amount which shall thereupon be
paid by the Employer to the Contractor or by the Contractor to the Employer, as the case
may be and the Certificate of the Architect shall be final and conclusive between the
32) PROCUREMENT AND SUPPLY TO BE APPROVED BY EMPLOYER:
All procurement and supply for the works for items which are not covered in the
Schedule of Rates provided by the employer shall be carried out using prudent practices
and soliciting competitive rates from eligible and competent suppliers of procurement the
rates of procurement and final order will be approved by the employer or the
Architect/Consultant appointed by the Employer in this regard.
All procurement shall be of materials that meet all the necessary quality and safety
standards necessary for completing the works. The Contractor shall be solely
responsible for the quality of the procured items and remedy any defects in the procured
items/replace them without recourse to the Employer.
33) CERTIFICATE AND PAYMENTS: -
The Contractor shall be paid by the Employer from time to time instalments under Interim
Certificates to be issued by the Architects to the Contractor on account of the works
executed when in the opinion of the of the Architect, work to the value named in the
Appendix as value of work for Interim Certificates (or less at the reasonable discretion of
the Architect) has been executed in accordance with this Contract, subject, however, to a
retention of the percentage of such value named in the appendix hereto as retention
percentage for Interim Certificates, until the total amount retained shall reach the named
percentage for Interim Certificates, until the total amount retained shall reach the named
in the Appendix as limit for Retention Money, after which time to the instalments shall be
up to the full value of the work subsequently so executed and fixed in the building. The
Architect may in his discretion include the Interim Certificate, such amount, as he may
consider proper on accounts of materials delivered upon the site by the Contractor for
use in the Works. And when the works have been virtually completed and the Architect
shall have certified in writing that they have been completed the Contractor shall be paid
by the Employer in accordance with the Certificate to be issued by the Architect the sum
of money named in the Appendix Installment after Virtual Completion and the Contractor
shall be entitled to the payment of the Final Balance in accordance with the Final
Certificate to be issued in writing by the Architect at the expiration of the period referred
to as the Defect Liability Period in the appendix hereto from the date of Virtual
Completion or as soon after the expiration of such period as the works shall be finally
completed and all defects made good according to the true intent and meaning and
hereof whichever shall last happen provided always that the issue of the Architect of any
certificate during the progress of the work or at or after the completion shall not relieve
the Contractor from his Liability under Clause 2 and 20 nor relieve the Contractor of his
inability in case of fraud, dishonesty or fraudulent concealment relating to the works or
materials or to any matter dealt with in the Certificate, and in case of all the defects and
insufficiencies in the works or material which a reasonable examination would not have
disclosed. No Certificate of the Architect shall of itself be conclusive evidence that any
works or materials to which it relates are in accordance with the Contract, neither will the
Contractors have a claim for any amounts which the Architects might have certified in
any interim bill and paid by the Employer and which subsequently be discovered as not
payable and in this respect the Employer decision shall be final and binding.
The Architect/GCSC shall have power to withhold any Certificate if the work or any parts
thereof are not being carried out to his satisfaction.
The Architect/GCSC may by any certificate make any correction in any previous
certificate, which shall have been issued by him.
Architect shall issue no Certificate of payment if the Contractor fails to insure the work
and keep them insured till the issue of Virtual Completion Certificate.
Payments upon the Architects Certificate shall be made within the period named in the
Appendix as Period of honoring Certificates after such Certificates have been delivered
to the Employer.
34) DELAY PAYMENT: -
No interest shall be paid for delayed payment due to any reasons.
35) MATTERS TO BE FINALLY DETERMINED BY ARCHITECT/EIC :-
The decision opinion, direction, certificate (except for payment) with respect to all or any
of the matters under Clause 2(a), 2(b), 4,7,12,19,28 (a, b, c, d, f) hereof (which matters
are herein referred to as the Accepted matters) shall be conclusive and binding on the
parties hereto and shall be without appeal. Any other decision opinion, direction,
certificate or valuation of the Architect/EIC or any refusal by the Architect/EIC to give any
of the same, shall be subject to the right of Arbitration and review under Clause
hereof in the same way in all respects (including the provision as to opening the
reference) as it were the decision of the Architect/EIC.
36) SETTLEMENT OF DISPUTES BY ARBITRATION: -
(1) Disputes to be referred to Tribunal:
The disputes relating to this contract, so far as they relate to any of the matter of this
tender, whether such disputes arise during the progress of the work or after the
completion or abandonment thereof, shall be referred to the Arbitration Tribunal, Gujarat
(2) The provision of Section-21 of the GPWD dispute Arbi. Tribunal Act –92 & order
issued by the Govt. in connection with this Act will now apply for Arbitration (As per
Government in N. & W.R.D. letter No. SUT/1090/2679/K2 dtd.9/2/94 .
(3) The provision of Arbitration Act., shall in so far as they are inconsistent with the
provision of this act cease of to apply to any dispute arising from a works contract and all
arbitration proceedings in relation to such dispute before an arbitrator, court of authority
shall stand transferred to the Tribunal.
(4) The awards declared by the arbitrator should be speaking award, giving reasons and
calculations for every item of claims. The decision will have to be implemented by all the
departments of the State Government and Public Sector Enterprises of Gujarat.
(Resolution F. D. No. PB/1088/735/KT/Sachivalaya/ Gandhinagar 5th October 1988.)
(5) In case of dispute leading to the contractor or Government of Gujarat approaching to
Court of Law, it shall be within the jurisdiction where the site of work is situated.
(6) The reference to arbitration proceeding under this clause shall not
(i) affect the right of both the parties under the contract to take possession of all or any
tools plants materials and stores in or upon the works of site thereof belonging to the
contractor or procured by him and intended to be used for the execution of the work or
any part thereof.
(ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the
contractor in any work or from removing such materials to other places, during the period
the work is stopped or suspended in pursuance of notice given to the contractor.
(iii) Entitle the contractor to stop the progress of the work or the carrying out the
additional or altered work in accordance with the provisions of clause
36) RIGHT OF TECHNICAL SCRUTINY OF FINAL BILL: -
The Employer shall have right to cause a technical examination of the works and the
final bill of the Contractor including all supporting vouchers abstracts, etc., to be made at
the time of payment of the final bill. If as a result of this examination or otherwise any
sum is found to have been overpaid or over certified, it shall be lawful for the Employer to
recover the same. Such final bills shall be scrutinized by registered chartered
accountants as appointed by GCSC.
37) EMPLOYER ENTITLED TO RECOVER COMPENSATION PAID TO WORKMEN: -
If, for any reason, the Employer is obliged, by the virtue of the provision of the
Workmen’s Compensation Act, 1923, or any Statutory modification or re-enactment
thereof to pay compensation to a workman employed by the Contractor in execution of
the works, the Employer shall be entitled to recover from the Contractor the amount of
compensation so paid, and without prejudice to the rights of the employer, under the said
Act. The employer shall be at liberty to receive such amount or any part thereof by
deducting or from the Security Deposit or from any sum due to the Contractor under this
contract or otherwise. The Employer it under the said Act, except on the written request
of the Contractor and upon his giving to the Employer full security to the satisfaction of
the Employer for all costs for which the Employer might become liable in consequence of
contesting such claim.
38) ABANDONMENT OF WORKS: -
If at any time after the acceptance of the Tender, the Employer shall for any reasons
whatsoever not require the whole or any part of the works to be carried out, the Architect
shall give notice in writing to the Contractor who shall have no claim to any payment of
compensation or otherwise whatsoever on account of any profit or advantage which he
might have derived from the execution of the whole works.
39) RETURN OF SURPLUS MATERIALS: -
Notwithstanding anything to the contrary contained in any or all the Clauses of this
Contract, where any material for the execution of the Contract is procured with the
assistance of the Employer by purchases made under orders or permits of licenses
issued by the Government, the Contractor shall hold the said materials economically and
solely for the purpose of the Contract and not dispose them without the prior written
permission of the Employer and return it to the Employer, if required by the Employer at
the price to determine by the Architect having due regard to the condition of the
materials, the price to be determined not to exceed the purchase price thereof
inclusive of Sales Tax, Octroi Duty and other such levies paid by the Contractor
in respect thereof. In event if the breach of the aforesaid condition the Contractor shall,
in addition to being liable to action for contravention of the terms of license or permit and
/ or original breach of trust, be liable to Employer for all such moneys, advantages or
profits resulting or which in the usual course would have results to him by reason of such
40) RIGHTS OF EMPLOYER TO TERMINATE CONTRACT IN EVENT OF DEATH OR
CONTRACTOR IF INDIVIDUAL: -
Without prejudice to any of the rights or remedies under this contract, if the Contractor,
being an individual dies, the Employer shall have the option of terminating the Contract
without incurring any liability for such termination.
41) IDLE LABOUR:
Whatever the reason may be, no claim for idle labour, additional establishment cost of
hire and labour charges of tools, plants, equipment etc. would be entertained under any
42) BID PRICES:
The Bidder shall fill in a single rate for a Procurement Fees for providing procurement
services with respect to bought out items. Procurement of items (lighting fixtures, CP
fittings etc. as indicated in schedule B) shall be carried out by the Bidder with prior
approval of the Employer / independent Architect and the contractor entitled to the
Procurement Fee on such procurement fees will be payable on items which are procured
directly by the Employer.
1) There shall be maintained a readily accessible place first aid appliances including
adequate supply of sterilized dressings and cotton wool.
2) An injured person shall be taken to public hospital without loss of time, in case where
injury necessitates hospitalization.
3) Suitable and strong scaffolds should be providing for workmen for all works that cannot
safety be dome from ground.
4) No portable single ladder shall be over 8 meters in length. The width between the side
rails shall not be less than 30 cm. (clear) and the distance between two adjacent rungs
shall not be more than 30 cm. When a ladder is used, an extra mazdoor shall be
engaged for holding the ladder.
5) The excavated material shall not be placed within 1.5 meters of the edge of the trench or
half of the depth of trenches whichever is more. All trenches and excavations shall be
provided with necessary fencing and lighting.
6) Every opening in the floor of a building or in a working platform be provided with suitable
means to prevent the fall of person or materials by providing suitable fencing or railing
whose minimum height shall be one meter.
7) No floor, roof or other part of the structure shall be so overloaded with debris or materials
as to render it unsafe.
8) Workers employed on mixing and handling material such as asphalt, cement mortar or
concrete and lime mortar shall be provided with protective footwear and rubber hand-
9) Those engaged in welding works shall be provided with welder’s protective eye-shields
10) i) No paint containing lead or lead products shall be used except in the form of paste or
ready-made paint.
ii) Suitable facemasks should be supplied for use by Worker when the paint is applied in
form of spray or surface having lead paint dry rubbed and scrapped.
11) Overall shall be supplied by the Contractor to the painters and adequate facilities shall
be provided to enable the working painters to wash during the period of cessation of
12) Hoisting machines and tackle used in the works, including their attachments, anchorage
and supports shall be in perfect condition.
13) The ropes used hoisting or lowering material or as a means of suspension shall be of
durable quality and adequate strength and free from defects.
14) The entire work site shall be adequately lighted Temporary fencing around excavated
areas; opening may be provided, if advised for safety reasons.
15) Agency Shall Follow All Safety Guidelines Of Covid-19 As Published By Government Of
IRREVOCABLE CONFIRMED BANK GUARANTEE PROFORMA
Bank Guarantee No.
The Gujarat Council of ScienceCity
Via Sola Under bridge, Sola Santej Road, Off Sarkhej Ahmedabad Highway, Ahmedabad
We are aware the M/s_________________________________________ having their
registered office at_________________________________ have offered to work for
Repairing and Color works at Science City Campus, Ahmedabad and further that you have
accepted their offer and entered into a contract with them in that regard. We herewith
guarantee to pay to you the maximum of Rs.______________
(Rupees_____________________________ only) in the event of the failure of
M/s_____________________________________ to fulfill any or all of their contractual
obligations or in the event of their committing any breach of the conditions of your Contract,
read with all appendices and annexure, as determined by you and entirely in your
unquestioned opinion.
Within ten days of the receipt of demand from you, we shall, without demur, pay you the sum
or sums mentioned in your demand up to a total sum not exceeding Rs. ________________
We do recognize your authority to demand a total of the above sum, without having to assign
any reason or to offer any proof or to substantiate the grounds of your demand. We admit
our liability to make payment to you as and when demanded.
We confirm that this guarantee shall remain in force for a period of ______________months
that is until__________ or any extension of this period. We moreover affirm that this is an
irrevocable confirmed guarantee and shall not be withdrawn nor cancelled before the
aforementioned date.
Insofar as you do not encash this guarantee wholly at one time, it shall remain valid and in
force in the sum equal to the difference between the total amount of Rs.
force in the sum equal to the difference between the total amount of Rs.
___________________ and the amounts paid to you against your demands.
We undertake to renew this guarantee or to extend the period of its validity within one month
before its expiry, upon being called upon by you to do so. If, for any reason whatever and
under circumstance whatsoever, this guarantee is not renewed or extended, we undertake to
pay you the full amount of the guarantee on demand and without demur.
Signature, seal and designation of duly authorized bank representative.
UNDERTAKING FOR CLOSURE OF CONTRACT
Gujarat Council of Science City Via Sola Under bridge, Sola Santej Road, Off Sarkhej
Ahmedabad Highway, Ahmedabad
Whereas, we M/s __________________________________________ the contractor have
successfully completed the work regarding “___________________________________________”
and the final bill of the contractor have been finalized and certified by Architect, Project Management
Consultant and also approved by the Project Manager/ Engineer in Charge for a total value of Rs.
Now, we the contractor hereby agrees that the final bill is acceptable to us and we shall not claim any
further amount relating to extra item under any head including escalation of cost, additional item,
change in scope of work, liquidated damages or under any other pretext/ context as all our claims/
demands, if any, have been covered under the final bill. Accordingly, the contract is closed for all-
purpose except to the extent of our defect liability and performance guarantee and/or warranty as per
requirement of the contract.
We further undertake that over and above our liability under defect liability clause under agreement
for the above work, we shall also be liable for performance of the bought-out items included in the
above final bill.
This undertaking is executed and delivered to you in good faith without any pressure, coercion,
obligation or influences whatsoever and accordingly we have signed this understanding having fully
aware of the meaning, contents and interpretation of this undertaking.
Yours faithfully,
Authorized Signatory
TECHNICAL SPECIFICATIONS.
5.1 SECTION – A : GENERAL.
The scope of work covers execution and completion of Repairing and Color works at
Science City Campus, Ahmedabad Gujarat Council of Science City, in accordance with
drawings and specifications prepared by and under direction and to the satisfaction of
Architect &GCSC: -
The Gujarat Council of Science City
Via Sola Under bridge, Sola Santej Road,
Off Sarkhej Ahmedabad Highway,
The form of Contract shall be according to the printed form “Condition of Contract”. The
following clauses shall be considered as an extension and not in limitation of the obligation
of the Contractor.
1) Contractor to inspect Site:
The Contractor shall visit and examine the construction site and satisfy as to the
nature of the existing roads or other means of communications, the character of the
soil and the excavation , the extent of magnitude of the work and facilities for
obtaining materials and shall obtain generally his own information on all matters
affecting the execution of the work. No extra charge made in consequence of any
miss-understanding or incorrect information on any of these points or on grounds of
insufficient description will be allowed. All expenses incurred by the Contractor in
connection with obtaining information for submitting this tender including his visits to
the site or efforts in compiling the tender shall be borne by the Tenderer and no claim
for reimbursement thereof shall be entertained.
2) Access to Site:
The Contractor is to include in his rates for forming access to the Site with all
temporary roads gangways required for the works.
3) Setting Out:
The Contractor shall set out the building in accordance with the plans. All grid /
center lines shall be pegged out to satisfaction of the Architects. The Contractor shall
be responsible for the correctness of the lining out and any inaccuracies are to be
rectified at his own expense. He will be responsible for taking ground levels of the
Site before setting out and recording them without any extra charge. The Contractor
shall construct and maintain proper benches at the intersection of all main walls,
columns, etc., in order that the lines and levels may be accurately checked at all
4) Treasure Trove:
Should any treasure, fossils, minerals, or works of art of antiquarian interest to found
during excavation or while carrying out the works, the Contractor shall give
immediate notice to the Architects of any such discovery and shall make over such
finds to the Employer.
5) Access for Inspection:
The Contractor is to provide at all times during the progress of the work and the
maintenance period proper means of access, with ladders, gangways, etc., and the
necessary attendance to move and adapt as directed for the inspection of
measurement of the works by the Architects or their representatives.
6) Attendance upon all Trades:
The general Contractor shall be required to attend on all the Tradesmen or Sub-
Contractors appointed by the Employer for Water Supply and Sanitary, Electrical
Installation, Lifts, Air-conditioning, Security Equipment, Hardware, Telephone and
other special Contractors. The rates quoted shall be inclusive of attendance and also
allow the Contractors appointed by the Employer, use of his scaffolding and retain
until such times the relevant Sub-contractor works are complete.
7) Water Supply:
Water shall be arranged in accordance with condition-7 of terms & Conditions of
Contract. The general Contractor shall allow the use of water for any other works on
the Site done by other Contractors appointed by the Employer and the Architects
shall apportion the cost.
8) Electric Supply:
Shall be arranged in accordance with condition-7 of terms & Conditions of the
Contract. He shall also allow other Contractors to use the facilities when requested
but consumption charges will be apportioned by the Architects.
9) Gatekeeper and Watchmen:
The Contractor from the time of being placed in possession of the Site must make
arrangements for watching lighting and protecting the work, all materials, workmen
and the public by day and night on all days including Sundays and Holidays at his
10) Sheds for Materials:
The Contractor shall provide for all necessary sheds of adequate dimensions for
shortage and protection of materials like cement, lime, timber, and such other
materials including tools and equipment which are likely to deteriorate by the action
of Sun, Wind, Rain or other natural causes due to exposure in the open.
All such sheds shall be cleared away and the whole area left in good order on
completion of the Contract to the satisfaction of the Architects.
All materials, which are stored on the site such as bricks, aggregates, etc., shall be
stacked in such a manner as to facilities rapid and easy checking of quantum of such
11) Cost of Transporting:
The Contractor shall allow in his cost for all transporting, unloading stacking and
storing of supplies of goods and materials for this work on the Site and in the places
approved from time to time by the Architects. The Contractor shall allow in his price
for transport of all materials controlled or otherwise to the site.
12) W.C. & Sanitary accommodation and Office Assessors and accommodation:
The Contractor shall provide at his own cost and expense adequate closet and
sanitary accommodation complying in every respect to the rules and regulations in
force of the local authorities and other public bodies, for his workmen of nominated
sub-contractors and others contractors working in the building, the assistant engineer
and other employer’s agent connected with this building project and maintain the
same in good working order.
The Contractor shall also provide at his own expenses adequate office and shall
maintain the same in a satisfactory condition and shall provide light, fan and
attendant, etc., for the same and shall remove them after completion of works. He
shall arrange to supply at his own expenses, office furniture with drawing assessors
for the official use of the assistance engineer and at all times maintain in good
working order a dumpy level and a Theodolite at Site, to enable the Assistant
Engineer to check the lines and levels of work.
13) Materials, Workmanship & Samples:
Materials shall be of approved quality and the best of their kind available and shall
generally conform to I.S. Specifications. The Contractor shall take prior approval from
Owner/PMC and order all the materials required for the execution of work as early as
necessary and ensure that such materials are on Site well ahead of requirement for
use in the work. The work-involved calls for high standard of workmanship combined
with speed and to the entire satisfaction of the Architects.\
14) Rates for Non-Tender Items:
Rates of items not included in Schedule of Quantities shall be settled by the
Architects/ PMC/GCSC as mentioned in the variation Clause of the Contract
15) Rate to include:
The rates quoted shall be for all heights and depths and for finished work.
16) To ascertain from Contractors for other trades.
The Contractor shall ascertain from other Contractors as directly by the Architects all
particular relating to their work with regards to the order of its execution and the
position in which cases, holes and similar items will be required, before the work is
taken in hand as no claims for extra will be allowed for cutting away work already
executed in consequence of any neglect by the Contractors to ascertain these
particulars beforehand.
Before ordering materials, the Contractors shall get the samples approved from the
Architects well in time.
17) Testing of work and material:
The Contractors shall, if required by the Architects, arrange to test materials and / or
portions of the works at his own cost in order to provide their soundness and
efficiency. If after any such test the work or portion of works is found in the opinion of
the Architect to be defective or unsound, the Contractor shall put down and re-do the
same at his own cost. Defective materials shall immediately the removed from the
18) Foremen and Tradesmen:
All tradesmen/technical staff shall be experienced men properly equipped with
suitable tools for carrying out all the work of carpentry and joinery and other specialist
trades in a first class manner and where the Architects deemed necessary, the
Contractor shall provide any such tools, special or ordinary which are considered
necessary for carrying out the work in a proper manner.
All such tradesmen shall work under an experience and properly trained foremen,
who shall be capable of reading and understanding all drawings, pertaining to this
work and the Contractor shall also comply with other conditions set out in Clause 9 of
the Conditions of the Contract.
19) Work Program / Weekly Progress Report:
The Contractor shall prepare and submit to Architects for approval, a bar chart
showing the program of construction of various items, fitted within the period
stipulated for completion, within 15 days of the communication of the acceptance of
the tender. The Contractor shall also furnish necessary particulars to the assistance
engineer for compiling weekly/monthly progress reports in the format furnished by the
Architects/ PMC.
20) Clearing of Site:
The Contractor shall after completion of the work clear the site of all the debris and
left over materials at his own expense to the entire satisfaction of the Architects and
Municipal or other public authorities.
21) Photographs:
The Contractor shall at his own expense supply to the Architects with triplicate copies
of large photographs not less than 15 cm. x 10 cm. (6” x 4”) of the works taken from
two approved portions of each building, at intervals of not more than 8 days during
the progress of the work and at every important stage of construction.
22) Preparation of building for occupation and use on Completion:
The whole of the work shall be thoroughly inspected by the Contractor and all
deficiencies and defects put right. On completion of such inspection, the Contractor
shall inform the Architects in writing that he has finished the work and it is ready for
the Architects inspection.
On Completion, the Contractor shall clean all windows and doors and all glass
panes, including cleaning of all floors, staircases and every part of the building neat
and clean and ready for immediate occupation and to the satisfaction of the
Architects / PMC.
23) Contractor to provide etc.:
The Contractor shall provide notice board on proper supports 2 m. x 1.5 m. (6’ x 4’ –
6”) in a position approved by the Architects. He shall allow for painting and lettering
stating name of the work, name of Architects, Structural Consultants, General
Contractor and Sub-Contractor. All letters except that of the name of the work shall
be in letters not exceeding 5 cm. in height and all to the approval of the Architects.
24) Protection:
The Contractor shall properly cover up and protect all work through the duration of
work until completion, particularly masonry, risers, moldings, steps, terrace or special
floor finishes, staircases and balustrades, door and glass, paintwork and all finishing.
25) Co-ordination Contract:
The contractor will coordinate with the supplier of equipment/machineries/ fountains
like of Roads & Utilites contractor / or any other agency which are related to complete
these projects with no extra cost to GCSC.
Name of Work: - Repairing and Color works at Science City Campus, Ahmedabad
DETAIL SPECIFICATIONS
SECTION – A : MATERIALS
1) Material shall be of best-approved quality, make as approved and they shall comply with
the respective Specification.
2) All material shall got approved before supply and the approved make shall be supplied
3) If directed, materials shall be tested by GCSC for its specification and quality.
4) It shall be obligatory for the Contractor to furnish certificate, if deemed by GCSC, from
manufacturer or the material supplier that the work has been carried out by using their
material and as per their specified procedure.
5) All materials and parts supplied by the Employer / any other Specialist Firms shall be
properly stored and the Contractor shall be responsible for its quality and performance.
6) Unless otherwise shown in the documents or mentioned in the “Schedule of Quantities”
or special specification, the quality of materials, workmanship, dimensions, etc., shall be
as specified as hereunder.
7) All equipment and facilities for carrying out field tests on materials shall be provided by
the Contractor without any extra cost.
8) The work shall be done in such a manner that no damage to the existing structure or
property may occur; else the same shall be rectified by the contractor at his own cost.
9) The material shall be provided with the warranty as per manufacturer’s specification or
as defined by GCSC for the respective items.
10) Material shall comply with the respective Indian Standard Specification.
11) Samples of all materials shall be got approved before placing order and the approved
sample shall be deposited with the Architect / PMC/Owner.
12) In case of non-availability of materials in metric sizes the nearest size in FPS units shall
be provided with prior approval of the Architects for which neither extra will be paid not
any rebates shall be recovered.
13) As directed, materials shall be tested in any approved Testing Laboratory and the test
certificates in original shall be submitted to the Architect / PMC and repeated testing
including charges for repeated tests, if ordered, shall be borne by the Contractor.
14) It shall be obligatory for the Contractor to furnish certificate, if deemed by the Architects/
PMC, from manufacturer or the material supplier that the work has been carried out by
using their material and as per their recommendations.
15) All materials supplied by the Employer / any other Specialist Firms shall be properly
stored and the Contractor shall be responsible for its safe custody until they are required
on the works and till the completion of the work.
16) Unless otherwise shown on the Drawings or mentioned in the “Schedule of Quantities” or
special specification, the quality of materials, workmanship, dimensions, etc., shall be as
specified as hereunder.
17) All equipment and facilities for carrying out field tests on materials shall be provided by
the Contractor without any extra cost.
a) Cement: Cement shall comply in every respect with the requirements of the latest
publications of IS: 6909 and unless otherwise specified Sulphate Resisting Cement
shall be used for all kinds of RCC works and Ordinary Portland cement for other
b) Fine Aggregate: Sand shall confirm to IS: 383 and relevant portion of IS:515. It shall
pass through pass through a I.S. sieve 4.75 mm. (3/16 B.S.) test sieve, leaving a
residue not more than 5%.
c) Reinforcement :
- Reinforcement of mild steel, tested quality confirming to I.S. : 432-1966 and
any other I.S. applicable
- TMT bars confirming to IS:1786 latest revision
- Hard drawn Fe 415 steel wire fabric confirming to IS: 1566;
All finished bars shall be free from cracks, surface flaws, and laminations, jagged and
imperfect edges.
Paints: Lime for lime wash, dry distemper, oil bound distemper cement primer, oil paint,
enamel paint, flat oil paint, plastic emulsion paint, anti-corrosive primer, red lead,
water-proof cement paint shall be from an approved manufacturer and shall conform
to the latest Indian Standard for various paints. Ready mixed pains as received from
the manufacturer without any admixture shall be used, except for addition of thinner,
if recommended by the manufacturer.
Following Indian codes shall be strictly followed in execution of respective items.
1) REINFORCEMENT AND FORM WORK.
Indian Standards to be followed are:
1 IS 226 Specification for structural steel standard quality.
2 IS 228 Methods for chemical analysis of steels.
3 IS 280 Specification for mild steel wire for general engineering purpose.
Cement complying to IS 269 shall be used unless otherwise specified cement. However,
cement conforming to any of the following Indian Standards may be used if approved by the
1 IS 269 Ordinary Portland cement
2 IS 455 Portland slag cement
3 IS 1489 Portland pozzolana cement
4 IS 6909 Super Sulphate cement
5 IS 8041 Rapid hardening cement
6 IS 8042 White Portland cement
7 IS 8043 Hydrophobic Portland cement
3) PLASTERING AND POINTING
The Indian Standards to be followed are
1 IS 383 Specification for coarse and fine aggregates for natural sources for concrete.
2 IS 412 Specifications for expanded metal steel sheets for general purposes.
3 IS 1542 Specifications for sand for plaster.
4 IS 1635 Code of practice for field slaking of building lime & preparation of putty.
5 IS 1661 Code of practice for application of cement &cement lime plaster finishes.
6 IS 2114 Code of practice for laying in situ terrazzo floor finish.
7 IS 2394 Code of practice for application of lime plasters finish.
8 IS 2402 Code of practice for external rendered finishes.
9 IS 2645 Specifications for integral cement water proofing compound.
SECTION I EARTH – WORK
All relevant Standards as specified elsewhere in this Volume are applicable.
Indian Standards to be followed are:
1 Classification and identification of soils for general engineering purpose.
2 Safety code for excavation Work
3 Safety code for blasting and related drilling operation
4 Code of practice for anti-termite measures in
Part 1 buildings: constructional measures
Part 2 Code of practice for anti-termite measures in buildings: Pre
constructional Chemical treatment measurement.
5 SP 27 Hand book of method of measurement of building works.
SECTION - II CONCRETE AND MORTARS
1 IS 269 Specification for Ordinary and low heat, Portland cement.
Specification for coarse and fine aggregates from natural sources for
3 IS 455 Specification for Portland slag cement
4 IS 456 Code of practice for plain and reinforced concrete
5 IS 460 Specification for test sleves.
(Part I, II & III)
(i) Wire cloth test sleves
(ii) Perforated plate test sleve
(iii) Method of examination of test sleve
6 IS 516 Method of test for strength of concrete
7 IS 712 Specification for Building lime
8 Method of Sampling and analysis of concrete
9 Specification for Bitumen tests for water proofing and damp proofing
10 Specification for Portland pozzolana cement
11 Specification for Sand for plaster
IS Specification for Bituminous compound for water proofing and caulking
13 Code of practice for field slaking of Building lime andpreparation of putty
14 Specification for Sand for masonry mortars.
15 Method of test for aggregate concrete
i) Particle size and shape
ii) Estimation for deleterious materials and organic impurities
iii) Specific gravity, density, voids, absorption and bulking
16 Specification for integral cement water proofing compound.
IS Methods of Sampling and test (Physical and Chemical for water used in
3025 Industry).
IS Specification for Broken brick (burnt clay) coarse aggregate for use in lime
19 Method of physical test for hydraulic cement (Pt. To I xiii)
20 Methods of chemical analysis for hydraulic cement
21 Specification for high Alumina cement for structural use.
22 Specification for super sulphated cement.
23 Methods of test for building limes (Part I to X)
24 Code of practice for extreme weather concreting
i) Recommended practice for hot weather concreting.
ii) Recommended practice for cold weather concreting.
25 Specification for Rapid hardening Portland cement
26 Specification for high strength ordinary port land cement (43 grades)
27 Specifications for admixture for concrete
28 Specification for one part gun grade
Poly sulphide based joint sealant: general requirements.
29 Specification for two parts poly sulphidebased
sealant: general requirements
30 SP 23 Handbook on concrete mix.
Explanatory handbook on Indian Standards code for plain and reinforced
concrete (IS 456)
32 SP 27 Handbook of method of measurement of building Works.
Indian Standards to be followed for the work are :
1 IS 75 Specification for linseed oil, raw and refined.
2 IS 345 Specification for wood filter, transparent, liquid.
3 IS 348 Specification for French polish.
4 IS 427 Specification for distemper - dry colour (as required)
5 IS 428 Specification for distemper oil emulsion colour (as required)
6 IS 533 Specification for gum spirit of turpentine (oil of turpentine).
7 Code of practice for painting or ferrous metals in buildings:
Part 1 Pre treatment
Part 2 Painting
8 Code of practice for finishing of wood and wood
based materials:
Part 1 Operation and workmanship
Part 2 Schedule
9 Code of practice for painting concrete, masonry & plaster surfaces.
10 Specification for enamel synthetic exterior (a) under coating (b) finishing.
11 Specification for enamel exterior, (a) under coating (b) finishing
12 Code of practice for painting asbestos cement building products.
IS Specification for ready mixed paint finishing interior for general purposes to
3537 IS colours.
IS Specification for ready mixed paint for finishing exterior (I) Alkyd, (ii) non-
3631 Alkyd, for general purposes to IS colours.
IS Code of practice for finishing of wood and wood based products with
4597 nitrocellulose and cold catalyzed materials.
16 Specification for cement paints
17 Code of Practice for phosphate of Iron and steel.
18 Code of practice for white washing and colour washing.
5) STEEL, IRON AND ALUMINUM WORK
The following IS apply to this section:-
1 Specification for grey iron casting (third revision)
2 Specification for structural steel (Standard quality) (fifth revision)
277 - Specification for galvanized steel sheets, plain and corrugated (fourth
1985 revision).
4 Specification for galvanized steel barbed wire for fencing (third revision).
280 - Specification for mild steel wire for general engineering purposes (third
412 - Specification for expanded metal steel sheets for general purposes
1975 (second revision).
432 Specification for mild steel and medium tensile steel bars and hard
7 (Part I – drawn steel wire for concrete reinforcement. Part I, mild steel and
1982 medium tensile steel bars (third revision).
Code of practice for use of structural steel in general building
construction (second revision).
814 - Specification for covered electrodes for metal are welding of structural
1974 steel (fourth revision).
816 - Cod of practice for use of metal are welding for general construction in
1969 mild steel (first revision).
818 - Code of practice for safety and health requirement In electric and gas
1968 welding and cutting operations (first revision).
822 - Code of practice for fixing and glazing of metals (Steel and aluminum)
1970 doors, windows and ventilators.
13 Specification for steel doors, windows and ventilators (third revision).
1081 – Code of practice for fixing and glazing of metals (steel& aluminum)
1960 doors, windows and ventilators.
1148 - Specification for hot rolled steel rivet bars (upto 40mm diameter) for
1982 structural purposes (third revision).
(a) Where welding is employed for fabrications.
(b) Where structure is situated in earthquake zone subject to severe damage.
(c) Where design of structure is based on plastic theory.
6) MASONRY WORK - BRICK WORK
Indian Standards to be followed are:
1 IS 226 Specification for steel standard quality.
2 IS 269 Specification for ordinary and low Portland cement.
3 IS 405 Specification for lead sheet and strips.
4 IS 412 Specification for expanded metal steel sheets for general purpose.
Specification for Mild steel and medium tensile steel bars and hard drawn
steel wires for concrete reinforcement.
Part 1 Mild steel and medium tensile steel bars.
6 IS 712 Specification for building lime.
7 IS 1077 Specification for common burnt clay building bricks.
8 IS 1322 Specification for Bitumen felts for water proofing & damp proofing.
9 IS 1566 Specification for hard drawn steel wire fabric for concrete reinforcement.
Specification for bituminous compound for water proofing and caulking
11 IS 1609 Code of Practice for laying damp proofing treatment using bitumen felt.
12 IS 1635 Code of Practice for field slaking of building lime & preparation of putty.
13 IS 2116 Specification for sand for masonry mortars
14 IS 2212 Code of Practice for Brick Work.
15 IS 2250 Code of practice for preparation and use of masonry mortars.
16 SP 27 Handbook of method of measurement for building works.
Name of Work: Repairing and Color works at Science City Campus, Ahmedabad
Item Specifications
Removing and scraping of old deteriorated plaster of any thickness from wall / R.C.C
memberincluding stacking of serviceable material and disposal of unserviceable from
site of work with all lead and lift.
The scrapping of old plaster shall consist of one or more parts of the building as specified by the
engineer in charge.
Scrapping shall be commenced in a systematic manner. The process shall in no way cause.
Damage to the underlying masonry or to be adjoining property or structure.
Necessary precautions shall be taken to keep the dust nuisance as and where necessary all
serviceable materials rubbish debris etc. shall be taken as directed by the engineer in charge. On
completion of work the site shall be cleared of all debries rubbish etc. With all lead and lift
cleared as directed.
MODE OF MEASURMENT & PAYMENT :
Measurement of all work shall be taken before scrapping plaster. Specifications for deduction
opening etc shall be on the same basis as that employed for providing plastering.
All the work shall be measured in decimal system as fixed in its place subject to the following
limits. Unless otherwise stated hereinafter (a) dimensions shall be measured to the nearest.
mt. (b) area shall be worked out to the nearest 0.01 smt. The rate shall be include the cost of all
labour involved and tools used in scrapping plaster including scaffolding for any height.
The rate shall also include the charged for disposing of unserviceable materials with all lead &
The rate shall be for a unit of one Smt.
Demolition of Brick work and stone masonry including stacking of serviceable
materilas and disposalof unserviceablematerialswithalllead and lift.(ii) In Cement
1.0. Workmanship : The relevant specifications of item No. 20.1 (I) shall be followed except
demolition of brick or stone masonry in cement mortar is to be done:
2.0. Mode of measurements & payment: 2.1. The relevant specifications of item No.
(II) shall be followed. The unserviceable materials shall be stacked as directed by Engineer-
in-charge with all leads and lifts.
Brick work using common burnt clay building bricks having crushing strength not
less than 35 kg./Sq.Cm. in foundation and plinth in Cement Mortar 1:5. (1- Cement : 5 -
fine sand)(B) Conventional.
1. Materials : Cement mortar of proporation 1 : 5 shall conform to M-11. Conventional bricks
shall confirm to M-15.
2. Workmanship : The relevant specifications of item No. 6.12 (A) shall be followed except
that the masonry work shall be carried out by using conventional bricks.
3.0. Mode of measurements and payment: 3.1. The relevant specifications of item No.
6.12 shall be followed. 3.2. The rate shall be for a unit of one cubic meter.
Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single
or half brick walls for interior plastering upto floor two level and finished even and
smooth in (i) Cement mortar 1:3 (1-cement:3-sand)
1.0. Materials: 1.1. Water M-l. The cement mortar of proportion 1 : 3 shall conform to M-13.
2.0. Workmanship:
2.1. Scaffolding : Wooden ballies, bamboos, planks, treaties and other scaffolding shall be
sound. These shall be properly examined before erection and use. Stage scaffolding shall be
provided for ceiling plaster which shall be independent of the walls.
2.2. Preparation of back-ground:
2.2.1. The surface shall be cleaned of all dust, loose mortar droppings, traces of algae,
efflorescence and other foreign matter by water or by brushing. Smooth surface shall be
roughened by wire brushing if it is not hard and by racking if it is hard. In case of concrete
surface, if a chemical retarder has been applied to the form work, the surface shall be
roughened by wire brushing and all the resulting dust and loose particles cleaned off and
care shall be taken that none of the retarders is left on the surface. Trimming of projections
on brick/concrete surface where necessary shall be carried out to get an even surface.
2.2.2. Raking of joints in case of masonry where necessary shall -be allowed to dry out for
sufficient period before carrying out the plaster work.
2.2.3. The work shall not be soaked but only damped evenly before applying the plaster. If
the surface becomes dry such area shall be moistened again.
2.2.4. For external plaster, the plastering operation shall be started from top floor and carried
downwards. For internal plaster, the plastering operations may be started wherever the
building frame and cladding work arc ready and the temporary supporting ceiling resting on
the wall of the floor have been removed. Ceiling plaster shall be completed before starting
plaster to walls.
2.3. Applications of plaster : 2.3.1. The plaster about 15 x 15 cms. shall be first applied
horizontally and vertically al not more than 2 metres intervals over the entire surface to serve
as gauge. The surfaces of these gauges shall be truly in plane of the finished plastered
surface. The mortar shall then be applied in uniform surface slightly more than the specified
thickness, then brought to a true surface by working a wooden straight edge reaching across
the gauges with small upward and sideways movement at a time. Finally, the surface shall
be finished off true with a trowel or wooden float according as a smooth or a sandy granular
texture is required. Excessive troweling or overworking the float shall be avoided. All comers,
arrises, angles and junctions be truly vertical or horizontal as the case may be and shall be
carefully finished. Rounding or chamfering corners, arises junctions etc. shall be carried out
with proper templates to the size requried.2.3.2. Cement plaster shall be used within half an
hour after addition of water. Any mortar or plaster which is partially set shall be rejected and
removed forthwith from the site. 2.3.3. In suspending the work at the end of the day, the
plaster shall be left out clean to the line both horizontally and vertically. When
recommending the plaster, the edges of the old work shall be scraped clean and wetted with
cement putty before plaster is applied to the adjacent areas to enable the two to properly join
together. Plastering work shall be closed at the end of the day on the body of the wall arid
nearer than 15 cm. to any corners or arrises. Horizontal joints in plaster work shall not also
occur on parapet tops and copings as these invaiiably lead to leakage. No portion of the
surface shall be left out initially to be packed up later on. 2.3.4. Each coat shall be kept damp
continuously rill the next coat is applied or for a minimum period of 7 days. Moistening shall
commence as soon as plaster is hardened sufficiently. Soaking of walls shall be avoided and
only as much water as can be readily absorbed shall be used, excessive evaporation on the
sunny or windward side of building in hot air or dry weather shall be prevented by handing
mattings or gunny bags on the outside of the plaster and keeping them wet.
3.0. Mode of measurements & payment:
3.1. The rate shall include the cost of all materials, labour and scaffolding etc. involved in the
operations described under workmanship.
3.2. All plastering shall be measured in square metres unless, otherwise specified. Length,
breadth or height shall be measured correct to a centimetre.
3.3. Thickness of the plaster shall be exclusive of (he thickness of the key i.e. grooves or
open joints in brick work, stone work etc. or space between laths. Thickness of plaster shall
be average thickness with minimum 15mm. at any point on this surface.
3.4. This item includes plastering upto floor two level.
3.5. The measurement of wall plastering shall be taken between the walls or partition
(dimensions before plastering being taken) for length and from the top of floor or skirting to
ceiling for height. Depth of cover of cornices if any shall be deducted.
3.6. Soffits of stairs shall be measured as plasterijng on ceilings. Flowing soffits shall be
measured separately.
3.7. For jambs, soffits, sills etc. for openings not exceeding 0.5 sq. ml. each in area for ends
of joits, beams, posts, girders, steps, etc. not exceeding 0.5 sq. mt. each in area and for
openings exceeding 0.5 sq. mt. and not exceeding 3.00 sq. mt. in each area deductions and
additions shall be made in the following manner: (a) No deductions shall be made for ends of
joints, beams, posts etc. and openings not exceeding 0.5 sq. mt. each and no addition shall
be made for reveals, jambs, soffits, sills etc. of these opening for finish to plaster around
ends of joints, beams posts etc. (b) Deduction for openings exceeding 0.5 sq. mt. but not
exceeding 3 sq. mt. each shall be made as follows and no addition shall be made for
reveals, jambs, soffits, sills etc. of these openings. (i) When both faces of all wall are
plastered with same plaster, deduction shall be made for one face only. (ii) When two faces
of wall are plastered with different types of plasters or if one, faces is plastered and the other
pointed, deductions shall be made from the plaster or pointing on the side of frame for door,
window etc. on which width of reveals is less than that on the other side but no deductions
shall be made on the other side. Where width of reveals on both faces of all are equal,
deductions of 50% of area of opening on each face shall be made from area of plaster
and/or pointing as the case maybe.
3.8. For openings having door frames equal to projecting beyond the thickness of wall, full
deduction for opening shall be made from each plastered face of the wall.
3.9. In case of openings of area above 3 sq. mt. each, deduction shall be made for opening
but jambs, soffits and sills shall be measured.
3.10. The rate shall be for a unit of one sq. meter.
Applying two coats of putty & two coats of primer of approved brand and manufacture
on new wall surface to give an even shade including thoroughly brushing the surface
free from mortar dropping and other foreign matter and sand papered smooth.
1.1 Acrylic lappy putty shall be of specified color and as approved by the Engineer in charge
. The putty shall be of Birla or Asian company shall be used .
1.2. All Acrylic lappy putty shall meet with the following general requirements
1.3 The Acrylic lappy putty shall not show excessive setting in a freshly opened ful can and
shall easily be redistricted with a paddle to a smooth homogeneous shade
1.4. The Acrylic lappy putty shall show no curdling levering caking or clolour separation and
shall be free from lumps and skins
1.5. The Acrylic lappy putty shall to a smooth uniform finish free from roughness grit
unevenness and other imperfections
1.6. The two coats of primer of approved brand and manufacture shall be applied on ceiling
to give an even shade.
2.0. WORKMAN SHIP
2.1. putty and primer coat
2.2. Material required for work of putty and primer coat work shall be obtained directly from
approved manufacturers or approved dealer and brought to the site in maker's drums. Kegs.
etc. in sealed and unbroken condition.
2.3. All materials not in actual use shall be kept properly protected lids of containers shall be
kept in closed and surface of the Acrylic lappy putty in open or partially open containers
covered with a clean water to prevent formation of skin
2.4. The Acrylic lappy putty which have become state or flat due to improper and long
storage shall not be used
2.5. the primer shall be stirred thoroughly in its container before purring into small
2.6. While applying also the primer shall be continuously stirred in smaller container
2.7. No left over Acrylic lappy putty shall be put back into stock tins When not in use the
container shall be kept properly closed
2.8. If for any reason thins is necessary the brand of thinner recommended by the
manufacture shall be used
2.9. The surface to be cover with putty and primer shall be thoroughly cleaned and dusted
All dirt and grease shall be thoroughly removed before primering is started No primering
part of the work shall be carried out in wet damp or otherwise unfavorable weather and all
the surfaces shall be thoroughly before primering work is started.
2.10. Application of primer
2.11. Brushing operations are to be adjusted to the spreading capacity advised by the
manufacturers of particular primer The primer shall be applied evenly and smoothly by
means of crossing and laying off. The crossing and laying off consists of covering the area
over with primer, brushing the surface hard for the first time over and then brushing
alternatively in apposite direction two or three times and then finally brushing lightly in a
direction at right angles to the same in this process no brush marks shall be left after the
laying off is finished The full process of crossing and laying off will constitute one coat.
2.12. Each coat shall be allowed to completely and lightly rubbed with very fine grade of
sand paper and loose particles brushed off before next coat is applied Each coat shall very
slightly in shade and shall be got approved from Engineer in charge before next coat is
2.13 Each coat shall be lightly rubbed down with sand paper of fine pumice stone and
cleaned of dust before the next coat is applied No hair marks from the brush of clogging of
primer puddles in the corners of panels, angles of moldings etc.
2.14. Special care shall be taken while primering over bolts nuts rivets overlaps etc
Approved best quality brushes shall be used for primering work
3.0 MODE OF MEASUREMENT & PAYMENT :
3.1. The unit rate of primer coat shall include the cost of all materials, tools and plant
required for primering , Appling the same to specified surface as per drawings, finishing,
primering with three coats including priming coat, etc, and all other incidental expenses for
producing Distempering work to complete the structure or its components as shown on the
drawings and according to these specifications. They shall also include the cost of making,
fixing and removing of all scaffolding and forms required for the work.
The rate of primer coat shall include the cost of all labour, materials tools and plant
scaffolding and all incidental expenses as described herein above.
3.2. The work shall be measured for its length and height, limiting dimensions to those
specified on plan or as directed. The rate shall be for a unit of one sq. meter
3.3. The payment will be made on sq. meter basis of the finished work.
Painting two coats (excluding priming coat) on previously painted steel and other
metal surfacewith enamel paint, brushing to give an even shade including cleaning
the surface of all dirt, dust and other foreign matter.
Relevant specification shall be followed of General Technical Specification booklet It. No.
Finishing wall with weather proof exterior emulsion paint on wall surface (two coats)
to give an required shape even shade after thoroughly brushing the surface to remove
all dirt, and remains of loose powdered materials etc. complete..
The water shall conform to M-1 of General Technical Specification for Building Works. Acrylic
paint shall be of the make JOTUN / ASIAN(apex) / NEROLAC/ULTRATECH or as equivalent of
approved by Engineer-in-charge. It shall be based on specially formulated 100% pure acrylic
resins, light fast pigments and other special activities to give excellent protection against alkali
and U.V. degradation. It shall forms a tough band with surface prevailing peeling fungus and
algee growth for years and years.
It shall have smooth and free flowing consistency and thinner ratio of paint: Water shall be as
per product manufacturer specifications for each coat or as directed by the company brochure.
The final finish shall be matt as per instruction of the Engineer in charge. It shall be of required
shade as per offered by the Engineer in charge.
2.1.1 The materials required for work of painting work shall be obtained directly from approved
manufacturers or approved dealer and brought to the site in maker's drums, cage etc. with seal
2.1.2 All materials not in actual use shall be kept properly protected, lid of containers shall be
kept closed and surface of paint in open or partially open containers covered with a thin layer of
water to prevent formation of skin. The materials, which have become stale or flat due to
improper and long storage shall not be used. The paint shall be stirred thoroughly in its
container before pouring into small containers. While applying also, the paint shall be
continuously stirred in smaller container. No left over paint shall be put back into stock tins
when not in use. The paint shall be stirred thoroughly in its container before pouring into small
2.1.3 If for any reasons, thinning is necessary, water shall be added as per supplier’s
2.1.4 The surface to be painted shall be thoroughly cleaned and dusted. All rust, dirt and
grease shall be thoroughly removed before painting is started. No painting on exterior or other
exposed parts of the work shall be carried out in wet, damp or otherwise unfavourable weather
and all the surfaces shall be thoroughly dry before painting work is started.
Procurement of Materials:
Materials to be used in this work shall be enough procured on site to maintain the progress of
work. The materials required for the daily work shall be used by the agency in presence of
Government representative. No advance payment shall be made for the procured materials.
2.3 Preparation of surface:
All unnecessary nails, hooks etc. shall be removed. Pitting in plaster shall be made good with
plaster again and papered with a fine grade sand paper and made smooth. The surface
affected by moulds, moss, fungi, algae lichens, efflorescence etc. shall be treated in
accordance with IS : 2395 (Part-1)-1966. The surface shall be thoroughly cleaned of all dust
dirt mortar dropping and other foreign matter before paint applied.
The surface spoil by smoke root shall be scrapped with steel brushes of steel scrappers or
shall be rubbed with over brunt surkhi or brickbats. The surface shall be then broomed to
remove all dirt, dust and shall be washed with clean water.
Oil and grease spot shall be removed by suitable chemical, smooth surface shall be rubbed
with wire brushed.
All unsound portion of the surface plaster shall be removed to full depth or plaster in
rectangular and pasted again after racking the masonry. Such portion shall be wetted and
allowed to dry. Any crevices at any level shall be cleaned and filled with the plaster mortar an
curved as above. The shall be give one coat of paint.
No. conventional Prime/ Putty is recommended on the exterior surface interior cement primer
usage is to be strictly avoided for exterior.
2.2 Scaffolding: Wherever scaffolding is necessary, it shall be erected in such a way that as far
as possible no part of scaffolding shall rest against the surface to be white or colour washed. A
properly secured, strong and well tied suspended platform (Zoola) may be used for white
washing. Where ladders are used, pieces of old gunny bags shall be tied at top and bottom to
prevent scratches to the floors and walls/ceiling. For white washing of walls/ceilings, proper
stage scaffolding shall be erected where necessary. Also, while painting the wall/ceiling, the
floor area shall be covered properly with plastic so that the flooring is not spoiled.
Where scaffolding is required it shall be erected in such a way that as far as possible no part of
scaffolding shall rest against surface to be painted. A properly secured strong and well-tied
suspended platform (Zoola) may be used for painting. Where ladders are used places of old
gunny bags shall br tied at top and bottom to prevent scratches to the walls/ceiling and floors,
for painting to ceiling proper stage scaffolding shall be erected where necessary and the floor
area should be covered with plastic so that the flooring is not spoil.
Application of priming coat of Birala white cement materials :
A priming coat i.e Birala white cement material shall be applied over the papered surface in
case of new work on undecorated surface. If any hair crack or crack found, shall be filled with
Birala white cement putty as per instructions given by Engineer-in-charge or as directed by
company brochure. The filling of hair cracks & cracks with Birala white cement material is done
alter the wall/ceiling surface dries completely, the priming coat of Birala white cement material
shall be applied. Primer shall be a prepared by mixing Birala white cement material & water in
a required proportion given in company’s brochure or as directed by Engineer-in-charge.
Application of Primer shall be done as under:
The primer shall be applied with a brush on the clean dry and smooth surface. Horizontal
strokes shall foe given first and vertical strokes shall be applied immediately afterwards. This
entire operation will constitute one coat. The surface shall be finished as uniformly as possible
leaving no brush marks. It shall be allowed to dry for at least 48 hours before oil bound
distemper or Paint is applied.
Preparation and applicant of paint:
Apply two coat of finish paint as per manufacturer’s specifications. Acrylic paint in case of
newly plasters surface application of priming coat with Birala white cement materials. A gap of
four hours should be given between two subsequent coats. Horizontal surface like the top
evening and parapets shall be an extra coat for grater protection. As the furnish paint required:
2-3 days of complete hard, dry a sharp immediately after painting wall effect felon built up
necessary recoat.
Before pouring into small containers for use of applying, the paint shall be stirred thoroughly in
its container. Also, the paint shall be continuously stirred in the smaller container, so that its
consistency is kept uniform.
The paint shall be laid on evenly and smoothly by means of crossing and laying off. The
crossing and laying off consists of covering the area over with paint, brushing the surface hard
for the first time over and then brushing alternately in opposite directions two or three times and
then finally brushing lightly in direction at right angles to the same. In this process, no brush
marks shall be left after the laying off is finished. The full process of crossing and laying off will
constitute one coat. No hair marks from the brush or clogging of paint puddles in the corners of
panels, angles of moldings etc. shall be left on the work.
On the newly plastered surface, the first coat shall be applied with 100% dilution and second
and third coat shall be applied with 40 % dilution or as per the supplier’s instructions. The
second or subsequent coat shall not be started until the preceding coat has become sufficiently
hard to resist marking of the brush being used.
2.6 Precautions:
(a) Old brushes if they are to be used with paints, shall be completely dried of turpentine or oil
paint by washing in warm soap water. Brushes shall be quickly washed in water immediately
after use and shall be kept immersed in water during break periods to prevent the paint from
hardening on the brush.
(b) In the preparation of walls for plastic emulsion painting, no oil base putties shall be used in
filling cracks, holes etc.
(c) Splashes on floors etc. shall be cleaned out without delay, as they will be difficult to remove
after hardening.
(d) Washing of surfaces treated with emulsion paint shall not be done within 3 to 4 weeks of
(e) Do not over thin paint stair wall and strain before use the paint. Do not use any universal
strainers or any other colour ants. Wear protective clothing like gloves one gaggle.
(f) The Finished surface shall be even and uniform shade without patches brush mortar paint
Protective measure:
The surface of doors, windows, ventilators, floors, of furniture etc. and such other parts of the
building not to be painted shall be protected from being splashed upon. Such surfaces shall be
cleaned of paint splashed, if any, immediately after completing the painting, at no extra cost.
Mode of Measurements and Payment:
For mode of measurement latest version of IS 1200 shall be followed. All the work shall be
measured in the decimal system as under:
(a)Dimensions shall be measured to the nearest 0.01 m.
(b) Area in individual items shall be worked out to the nearest 0.01 sqm.
All works shall be measured in sqm In jambs, soffits, sills etc. and for openings not exceeding
0.5 m2 each in area, for ends of joists, posts, beams, girders, steps etc. not exceeding 0.5 m2
each in area and for openings exceeding 0.5 m2 and not exceeding 3.0 m2 each in area,
deductions and additions shall be made as under:-
1) No deductions shall be made for ends of joists, beams, posts, etc. and for openings not
exceeding 0.5 m2 each. No addition shall be made for reveals, jambs, soffits, sills etc of these
openings not for finish around ends of joists, beams, posts etc.
2) Deductions for openings exceeding 0.5 sqm but not exceeding 3.0 sqm each shall be made
as follows and no addition shall be made for reveals, jambs, soffits etc. of these openings:
(a) When both the faces of walls are provided with the same finish, deduction shall be made for
(b) When each face of wall is provided with a different finish, deduction shall be made for that
side of frame for door, windows, etc. on which width of reveals is less than that of the other
side. Where widths of reveals on both faces of wall are equal, deduction of 50% of area of
opening on each face shall be made from total area of finish.
(c) When only one face of wall is treated and the other face is not treated, full deduction shall
be made if when width of reveal on the treated side is less than that on the untreated side, but
if the width of reveals is equal or more than on the untreated side neither deductions nor
additions to be made for reveals, jambs, soffits, sills etc.
3) In case of area of openings exceeding 3.0 sqm each, deduction shall be made for openings
but jambs, soffits shall be measured.
4) No deductions shall be made for attachment such as casing, conduits, pipe, electric wiring
and the like. Corrugated surfaces shall be measured flat as fixed and not girth. The quantities
measured shall be increased by the following percentage and the resultant shall be included
with the general areas:
(a) Corrugated steel sheets --------------------------------- 14%
(b) Corrugated A.C. Sheets -------------------------------- 20%
(c) Semi corrugated A.C. Sheets -------------------------- 10%
(d) Nainital pattern roof (Plain sheeting with rolls) ---- 10%
(e) Nainital pattern roof (with corrugated sheets) ----- 25%
Cornices and other wall/ceiling features, when they are picked out in a different finish/colour
shall be girthed and included in the general area.
The rate shall include the cost of all materials, labor, scaffolding, protective measures etc.
required for the above specified operation, for all floor , at any height, in any position. Priming
and Alkali resistant treatments, scrapping of surface washing etc. surface spoiled by smoke
soot, removal of oil and grease spots, treatment for infection with efflorescence moulds, moss,
fungi, algae and lichen and patch repairs to plaster wherever done shall not be paid extra. This
shall also include conveyance, delivery, handling, unloading, storing work etc.
The rate shall be for a unit of one square meter.
The Payment shall be made on square meter basis.
Removing, Providing and Fixing 90 cm high Stainless steel railing made of SS 304 of
50 mm inside dia. 16 gauge round pipe supported with S S 304 grade Baluster of
mm dia (16Gauge) as a vertical support fixed in RCC slab at 0.9 m c/c including
three horizontal S S pipes of 25 mm dia. (16Gauge) at equal distance fixed by
mm dia. (16Gauge) S S pipe with baluster including All accessories as directed etc.
1. Scope of Work:
Site Clearance & Dismantling: The scope encompasses the careful dismantling,
uninstallation, and removal of any existing damaged or obsolete railing systems,
debris clearing, and making good the affected surrounding surfaces as directed by
the Engineer-in-Charge.
New Installation: Providing, fabricating, assembling, erecting, and fixing a complete,
rigid 90 cm high stainless steel railing system.
Comprehensive Execution: The work includes all associated incidental tasks such
as precise layout marking, core cutting/drilling into RCC structures, heavy-duty
anchoring, Argon Arc TIG welding, mechanical grinding, and final polishing. All labor,
tools, scaffolding, safety gear, and hardware accessories required to complete the
installation as per architectural drawings and site instructions are included in the
2. Material Specifications:
All components must be fabricated exclusively from high-grade austenitic Stainless
Steel Grade SS 304 (containing a minimum of 18% Chromium and 8% Nickel) to
guarantee high corrosion resistance, long-term structural integrity, and stain-free
weathering in outdoor or semi-indoor environments.
Top Handrail: Premium quality 50 mm inside diameter round pipe, manufactured in
16 Gauge (approx. 1.5 mm thickness), running continuously along the top profile of
the entire railing span.
Vertical Balusters (Posts): 38 mm diameter round pipe, manufactured in 16 Gauge
thickness, functioning as the primary vertical load-bearing structural supports.
Horizontal Infill Members: Three (3) parallel runs of 25 mm diameter round pipes,
manufactured in 16 Gauge thickness, positioned horizontally at uniform/equal vertical
intervals between the balusters to ensure safety and aesthetic appeal.
Interlinking & Fixing Elements: 18.75 mm diameter round pipe, manufactured in
16 Gauge thickness, utilized structurally as connectors, sleeves, or supporting
braces to tie and lock the horizontal infill pipes securely with the vertical balusters.
Hardware & Accessories: Includes heavy-duty stainless steel or industrial-grade
base plates, matching floor cover shrouds/caps to conceal anchor points, factory-
fabricated bends, elbows, end caps, specialized SS welding rods/consumables, and
structural chemical/expansion anchor bolts suitable for insertion into RCC slabs.
3. Workmanship & Execution Methodology :
Structural Anchoring into RCC Slab:
Holes of precise depth and diameter shall be core-drilled or drilled into the structural
RCC floor slab or staircase steps at exactly 0.9 meters centre-to-centre (c/c)
The 38 mm vertical balusters must be anchored plumb and securely into the RCC
using heavy-duty expansion bolts or structural chemical anchors to withstand lateral
push loads without swaying.
Base plates must be tightly secured, and matching floor cover shrouds must be slid
down to flawlessly conceal raw fixing points and anchor bolts.
Alignment & Height Maintenance:
The entire assembly must be meticulously plumbed, levelled, and aligned.
The vertical height from the finished floor level (FFL) to the top of the 50 mm handrail
must maintain a strict, uniform level of 90 cm (0.9 meters) throughout its entire
Fabrication & Welding:
All cutting, notching, and shaping of pipes must be executed cleanly using
mechanical cutters without deformation, burrs, or scorching.
All permanent joints, intersections, and frame connections must be welded using
Argon Arc TIG (Tungsten Inert Gas) welding by certified welders to achieve
maximum structural fusion and strength without spatter.
Grinding & Surface Finishing:
Post-fabrication, all weld seams, joints, and connection points must be carefully
ground, dressed down, and buffed.
The entire system must be finished to a uniform uniform brush/matt or mirror polish
(as directed by the architect) to completely eradicate weld discoloration, leaving a
sleek, corrosion-resistant, architectural-grade finish.
4. Mode of Measurement & Payment :
Unit of Measurement: The finished stainless steel railing work shall be measured
and paid for in Running Meters (RMT).
Method of Measurement: Measurements will be taken along the true centreline of
the top 50 mm handrail from end to end, including all straight runs, raked sections
(staircases), and standard profile changes.
Inclusions in Rate: The unit rate quoted shall be fully inclusive of dismantling
existing works, cost of all SS 304 raw materials (handrail, balusters, horizontal pipes,
and fixing pipes), fabrication, TIG welding, structural anchoring hardware, base
covers, grinding, polishing, wastage, transportation, scaffolding, and all incidental
charges required to complete the job to the entire satisfaction of the Engineer-in-
Charge. No separate or extra measurements or payments will be entertained for
corner joints, structural bends, or vertical post fixings.
LIST OF MATERIALS OF APPROVED BRAND AND THEIR MANUFACTURERS
Sr. No. Material / Item Approved Make / Brand
Paints – Waterproof Paint,
Asian Paints, Garware, British Paints, ICI, Nerolac or
1 Synthetic Enamel / Plastic
equivalent approved make
/ Exterior Paint
UltraTech, ACC, Birla, Sanghi, Binani, Ambuja or
equivalent approved make
3 Structural Steel RINL, TATA, SAIL, Jindal
Kajaria, Asian, NITCO, Somany or equivalent
Asian, Kajaria, Somany or equivalent approved
5 Vitrified Tiles
Asian, Somany, Varmora or equivalent approved
6 Ceramic Tiles
7 Urinal Cera, Jaquar or equivalent approved make
Indian Type W.C. Seat &
8 Cera, Hindware or equivalent approved make
European W.C. Seat
9 PVC Water Tank Sintex, Dutron, Omtex or equivalent approved make
10 UPVC Pipes Astral, Dutron, Prince or equivalent approved make
Teak Wood / Chill Wood / Laminated, 1 mm thick, IS
12 PVC Flush Tank ISI Mark approved make
Pillar Tap & Sanitary Jaquar, Kohler, Croma, Crown or equivalent
Fittings approved make
14 Glass Modiguard, Saint-Gobain
15 Valves Zoloto or equivalent approved make
Featherlite, Sharda, Godrej or equivalent approved
Termite Treatment Chlorpyrifos (1% concentration by weight), as per
Chemical details/manufacturer's specifications, or Imidacloprid
Sundek, Formica, Greenlam, Century or equivalent
Ozone, Everite, Dunex, Ebco, Sterling or equivalent
19 Hardware Fittings
Unitex, Bajaj, Trans Asia, Hanwa or equivalent
20 Carpet / PVC Flooring
ACP (Aluminium Aldecore, Alstrong, Viva or equivalent approved
Composite Panel) make
22 Aluminium Sections Jindal or equivalent approved make
23 GI Sheet Tata, Jindal, Essar or equivalent approved make
24 Gypsum Board Indian Gypsum or equivalent approved make
(Note: - Where other materials are proposed to be used, these should be approved by The
GCSC / Architect/ PMC).
Signature of Agency Executive Director
GUJARAT COUNCIL OF SCIENCECITY
(A Government of Gujarat Society)
Name of Work: Repairing and Color works at Science City Campus , Ahmedabad
Gujarat Council of Science City
Village Hebatpur, Sola Santej Road,
Nr. Science City Cross Road, Ahmedabad -380060
Phone: 91-79-29703122, 28 Email: [email protected] Website: -www.scity.org
Name of Work: Repairing and Color works at Science City Campus , Ahmedabad.
Item of work Unit Quantity Rate Amount
Removing and scraping of old deteriorated
plaster of any thickness from wall / R.C.C
1 member including stacking of serviceable Sqm 484.00 19.38
material and disposal of unserviceable from
site of work with all lead and lift.
Demolition of Brick work and stone
masonry including stacking of serviceable
2 materials and disposal of unserviceable Cum 16.00 544.95
materials with alllead and lift.(ii) In Cement
Brick work using common burnt clay
building bricks having crushing strength not
3 less than 35 kg./Sq.Cm. in foundation and Cum 16.00 4011.66
plinth in Cement Mortar 1:5. (1- Cement :
-fine sand)(B) Conventional.
Providing 15mm thick cement plaster in
single coat on Rough (Similar)side of single
or half brick walls for interior plastering upto
floor two level and finished even and
smooth in (i) Cement mortar 1:3 (1-
Applying two coats of putty & two coats of
primer of approved brand and manufacture
on new wall surface to give an even shade
including thoroughly brushing the surface
free from mortar dropping and other
foreign matter and sand papered smooth..
Painting two coats (excluding priming coat)
on previously painted steel and other metal
with enamel paint, brushing to give an even
shade including cleaning the surface of all
dirt, dust and other foreign matter.
Finishing wall with weather proof exterior
emulsion paint on wall surface (two coats)
to give an required shape even shade after
7 thoroughly brushing the surface to remove Sqm 11804.00 113.40
all dirt, and remains of loose powdered
materials.etc complete.
Removing, Providing and Fixing 90 cm high
Stainless steel railing made of SS 304 of
50 mm inside dia. 16 gauge round pipe
supported with S S 304 grade Baluster of
38 mm dia (16Gauge) as a vertical support
8 fixed in RCC slab at 0.9 m c/c including Rmt 240.00 3387.50
three horizontal S S pipes of 25 mm dia.
(16Gauge) at equal distance fixed by
mm dia. (16Gauge) S S pipe with baluster
including All accessories as directed etc.
Total amount Rs (in words) Thirty one lacs fifty three Thousand Three Hundred and ninety six
Total amount Rs (in words) Thirty one lacs fifty three Thousand Three Hundred and ninety six
Rupees ninety three paisa
I/We am/are willing to carry out the work at………………% above/below percent (Should be
written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The rates quoted shall be excluding GST but including other taxes complete.
The material shall get approved by GCSC EIC, before procurement.
The quantity may vary as per GCSC requirements.
The electricity if required for the current work shall be provided by GCSC. Necessary
arrangement for DG set may be done by bidder for the work if power is not available at
location. Contractor shall make his own arrangement to carry the same at required site
location, under strict supervision and prior permission of GCSC.
The quantity if varied, the rates shall be paid for the actual work done on proportional basis
of the specified item
Name of Works: Repairing and Color works at Science City Campus , Ahmedabad
CREDIT OF THE DISMETAL MATERIALS
Sr No Item Unit Qty Usable Unit Rate
Signature of the Contractor with stamp Executive Director
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final Tender Document.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .