[1] Constructing B.T. Road on Approch Road on Bridge to Kharera River of Kelia Irrigation Scheme. [2] Constructing B.T. Road on Approch Road on Kharera River to Gate-01 of Kelia Irrigation Scheme. [3] Re-Carpeting Work of Gate to Spillway, Spillway to Gardan, Toe to HR Road, Reservior Approch Road At Kelia Irrigation Scheme. [4] Re-Carpeting Work of Spillway approch Road At Top of Kelia Earthen Dam Between Ch.0.00 to 350.00 mt. [5] Re-Carpeting Work of Spillway Approch Road At Top of Kelia Earthen Dam Between Ch.350.00 to 700.00 mt. [6] Re-Carpeting Work of Barm HR Approch Road, Barm HR Approch Spillway, Gate to Top Approch Road At Kelia Irrigation Scheme. Taluka : Valod. District : Tapi.
264412
E Tender Notice No.30 of 2025-26
Open
Civil Works - Roads
Works
Tapi
13 documents required · 11 mandatory · 2 optional
₹2,400
Yes
Executive Engineer, U.L.B.C.Inv.Dn.No.2,Valod
₹78,000
Yes
13 Jan 2026
13 Jan 2026
13 Jan 2026
27 Jan 2026
13 Jan 2026
Name of Work: [1] Constructing B.T. Road on Approch Road on Bridge to Kharera River
of Kelia Irrigation Scheme.
[2] Constructing B.T. Road on Approch Road on Kharera River to Gate-
01 of Kelia Irrigation Scheme.
[3] Re-Carpeting Work of Gate to Spillway, Spillway to Gardan, Toe to
HR Road, Reservior Approch Road At Kelia Irrigation Scheme.
[4] Re-Carpeting Work of Spillway approch Road At Top of Kelia
Earthen Dam Between Ch.0.00 to 350.00 mt.
[5] Re-Carpeting Work of Spillway Approch Road At Top of Kelia
Earthen Dam Between Ch.350.00 to 700.00 mt.
[6] Re-Carpeting
Taluka : Valod. Work of :Barm
District Tapi. HR Approch Road, Barm HR Approch
Memorandum showing items of works to be carried out : èë× ÔßäëÞë ÀëÜùÞí ÚëÚÖù ØåëýäÖí ÝëØí
Sr. Quantity Item of Work Estimated Unit Total
No. estimated In Figures Amount
but may be According to
more or Estimated
1 420.00 Cu.mt. Providing, laying and compacting 906.98 Cu.mt.
Unscreened Gravel / Sand Below Sub
Base Course including carriage of materials
spreading in uniform layer manually on
prepared base and compacted with
vibratory roller to achieve desired density
including all materials, labour etc. complete.
2 390.00 Cu.mt. Constructing of Granular Sub-Base Gr-II by 880.72 Cu.mt.
providing course graded B.T. machine
crushed material satisfying MOST
specification of Grading-II including
spreading in uniform layer with motor
grader on prepared surface, mixing by mix
in place method with rotavator at OMC and
compacting with vibratory roller to achieve
the desired density etc. complete.
3 449.00 Cu.mt. Providing and laying spreading and 970.61 Cu.mt.
compacting graded stone aggregate to Wet
Mix Macadam (WMM) in two layer as per
specification and drawing including
premixing the Material with water at OMC in
mechanical mix plant carriage by tipper to
site, laying in uniform layer in sub-base /
base course on well prepare surface and
compacting with vibrator roller to achieve
Providing and laying spreading and
Sr. Quantity Itemstone
compacting graded of Work
aggregate to Wet Estimated Unit Total
Mix Macadam (WMM) in two layer as per
No. estimated In Figures Amount
but may be specification and drawing including According to
more or premixing the Material with water at OMC in Estimated
mechanical mix plant carriage by tipper to
site, laying in uniform layer in sub-base /
base course on well prepare surface and
compacting with vibrator roller to achieve
the desired density as per MORTH Fifth
revision clause-406.
4 2388.00 Sq.mt. Providing and applying evenly Priming Coat 41.11 Sq.mt.
with emulsion asphalt at the rate of 7.50 Kg
/ 10 Sq.m on road surface using emulsion SS-
1 (Hincol Made) pressure sprayer etc.
complete including the cost of asphalt
5 6.00 No. Providing Vidiography on the ocassion of 1230.51 No.
function or for on going construction work
including dubbing, titeling etc. complete
including cost of cassette / CD. (b) Up to
6 914.00 M.Ton. Providing & laying Bituminous Base 1999.80 M.Ton.
Course 37.50 mm thick compacted in Single
layer asphalt VG-30 grade at 1.99% by
weight of mix for mixing and 4.0 kg / 10 smt
VG-30 grade Asphalt for tack coat & using
B.T. chips of required gradation including
cleaning and heating asphalt, premix
material by drum mix process in proper
gradation and laying with paver finisher
including rolling and consolidation with 8-
10 tonne vibratory roller and providing all
material equipment, tools, and plants, fire
wood, oil, kerosene labour charges etc.
complete using contractor's own
machineries, drum mix plant and paver
finisher etc. complete.
7 608.00 M.Ton. Providing, laying 25mm thick Compacted 2569.44 M.Ton.
Bituminous Carpet considering 0.66 cmt. /
10Smt. Stone chips for one M.ton as per
specification, using the asphalt at rate
Kg / M.ton (i.e. 3.36% by weight of total mix)
(VG-30) and asphalt for tack coat at rate
Kg / 10sq.mt VG-30. including heating and
mixing the asphalt and stone aggregates by
continuous batching of drum mix plant and
transporting and spreading the same by
paver finisher and consolidation with
vibratory roller with necessary equipments
oil, kerosene, fire wood labour charges etc
comp. With contractor's own machineries
8 300.00 M.Ton. and equipment
Providing and tools
with B.T. 2799.72 M.Ton.
aggregate as specified using aggregate at the
rate of 0.18 Cu.mt. / 10 Sq. mt. and bitumen
grade VG-30 for mixing with aggregate at the 2 of
rate of 4.50 % i.e. 45.00 Kg. / M.T including
Sr. Quantity Item of Work Estimated Unit Total
No. estimated In Figures Amount
but may be According to
more or Estimated
1 2 Providing and laying3 Seal Coat with B.T. 4 6
aggregate as specified using aggregate at the
rate of 0.18 Cu.mt. / 10 Sq. mt. and bitumen
grade VG-30 for mixing with aggregate at the
rate of 4.50 % i.e. 45.00 Kg. / M.T including
heating & mixing in hot / drum mix plant &
transporting & spreading the same by paver
finisher & consolidation with vibratory
roller incl. necessary firewood, oil,
lubricants, labour charges etc. using
contractor's own drum mix plant,
machineries & equipment, tools etc.
9 10995.00 Sq.mt. complete
accordance with thePainting on
laying Asphalt 29.51 Sq.mt.
B.T. surface with bitumen VG-30 at rate of
Kg / 10 sqmt. of bitumen and spreading
stone dust on painting surface at the rate of
0.03 Cu.mt / 10 Sqmt.
10 733.00 Rmt Road Marking with Hot Applied 367.72 Rmt
Thermoplastic Paints with reflectorising
glass beads on bitumen surface providing
and laying a hot applied thermoplastic
compound 2.5 mm thick including
reflectorising glass beads @ 250gms per
sqm area, thickness of 2.5mm is excluding of
surface applied glass beds as per IRC:35-
2015. The finished surface to be level,
11 308.00 Cu.mt. Excavation for Foundation in all sorts of soil 81.50 Cu.mt.
including yellow, sand,. gravel, soil, soft
murrum, etc. dry condition including
depositing the excavated stuff in uniform
layers in banks or as directed etc. complete
for lead up to 1.0 Km and all lifts. (By
12 64.00 Cu.mt. Providing and laying Plain / Reinforced 3899.10 Cu.mt.
Nominal Mix Cement Concrete of various
grade with cement, sand and coarse
aggregate including centering, shuttering.
batching, mixing transporting. placing. vibra
cting smooth finishing, curing etc complete
for all lead and lift. (Manual with
conventional mixer, Excluding dewatering)
(Wing wall, Head wall etc) (A) Foundation
13 189.00 Cu.mt. Providing and laying Plain / Reinforced 4559.30 Cu.mt.
Nominal Mix Cement Concrete of various
grade with cement, sand and coarse
aggregate including centering, shuttering.
batching, mixing transporting. placing. vibra
cting smooth finishing, curing etc complete
for all lead and lift. (Manual with
conventional mixer, Excluding dewatering) 3 of
(Wing wall, Head wall etc) M-15 (B) Raft,
Sr. Quantity Item of Work Estimated Unit Total
No. estimated Providing and laying Plain / Reinforced In Figures Amount
but may be Nominal Mix Cement Concrete of various According to
more or grade with cement, sand and coarse Estimated
less aggregate including centering, shuttering. Quantity
batching, mixing transporting. placing. vibra
cting smooth finishing, curing etc complete
for all lead and lift. (Manual with
conventional mixer, Excluding dewatering)
(Wing wall, Head wall etc) M-15 (B) Raft,
14 64.00 Cu.mt. Supplying and spreding Hard Murram 386.83 Cu.mt.
inside. Shoulders of Canal Roads
15 1414.00 Cu.mt. Providing and laying plain / reinforced 387.80 Cu.mt.
Cement Concrete lining of M-15 grade in
bed, side slopes and curvature including
batching, mixing, transporting placing, m2
smooth finishing, curing including
dewatering where required. (Manually with
conventional mixer) (a) 7.50 cm thick
linning in Bed & Slope
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1SBD - Re Carpeting work of Road - 6 Rd_compressed.pdf
1Sch B.pdf
Tender Notice No.30 of 2025-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .