Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹11.0 Cr
EMD Value
₹10 L
Closing Date
5 Nov 2026, 2:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE CTU
Central Tender Unit Jalasampad Bhawan, 8thFloor, Salt Lake, Kolkata-700091
Reconstruction, remodeling and Improvement of Embankment in Sundarban and adjoining areas in the district of South 24- Parganas, West Bengal, damaged by severe Cyclone AILA along the right bank of river Matla at Mouza Gopalganj in Block - Kultali
2026_IWD_5079523_1
WBIW/CTU/CE(S)/e-NIT-20(e)/ 2026-27
Open Tender
CIVIL WORKS
Item Rate
730 days
Mouza Gopalganj
Please refer Tender documents.
9 documents required · 9 mandatory
₹10 L
Yes
O/O THE CTU
14 Oct 2026
14 Oct 2026
6 Nov 2026
14 Oct 2026
5 Nov 2026
18 Oct 2026
17 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 416 | Cubic Metre | 9,982.25 | ₹41,52,616 |
| 2 | Providing and laying 400 G Polythene sheet over damp proof course, below flooring or roof terracing or in foundation or in foundation trenches , over earthen slope etc. as directed by the Engineer - in - charge. | 1,665 | Sqm | 35.51 | ₹59,124.15 |
| 3 | Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size Including spreading, well ramming, consolidating and grouting with Fine sand (zone IV), including finishing smooth etc. complete as per direction of Engineer-in-charge. | 555 | Cubic Metre | 233.97 | ₹1,29,853.35 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 4,390 | Cubic Metre | 234.57 | ₹10,29,762.3 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns. | 1,138 | Sqm | 469.32 | ₹5,34,086.16 |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including setting out as directed by Engineer-in-charge. | 4,848 | Cubic Metre | 121.2 | ₹5,87,577.6 |
| 6.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains ( Not execeeding 1.5 m in width or 10 Sqm on plan ) including dressing of sited and ramming of bottom, for all lift, including geetting out the excavated soil. All kind of Soil | 430 | Cubic Metre | 174.66 | ₹75,103.8 |
| 7Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of - NB :- Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Note : 1 Extra rate towards compensation for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Departmen has been added in this derivation @ ₹ 43.00/m3 [ Vide Ref : Page No : 87,Item No : 16(Note) of NH Schedule of Rates 2019] Note: 2 The rate of royalty for earth/soil/fine sand/silt used for filling/brick making (including such material derived from dredging/de-silting) as notified same as that of Ordinary Earth/Brick Earth/Fuller Earth vide Gazatee notification No. 581-ICE-12013(99)/6/2022-MINES SEC-Dept. of ICE, Date:- 26.09.2022 of Department of Industry, Commerce & Enterprises Mines Branch @ ₹ 29.00/m3 has been added in this derivation .The royalty will be paid to the agency on production of necessary documents in support of payment made toward the royalty. Note : 3 Extra rate towards cess for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹ 5.30/m3 [Vide Ref: Memo No: 138/3512-29/C/99 Dated; 22.06.2000 of DLR & Jt. LRC, WB] | |||||
| 7.01 | Beyond 500 metre and upto 1.00 k.m. | 9,330 | Cubic Metre | 351.93 | ₹32,83,506.9 |
| 7.02 | Beyond 1.00 k.m. and upto 2.00 k.m. | 13,995 | Cubic Metre | 362.66 | ₹50,75,426.7 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.84 MB
Tendernotice_2.pdf
PDF • 0.05 MB
Tendernotice_3.pdf
PDF • 0.84 MB
Tendernotice_4.pdf
PDF • 1.69 MB
Tendernotice_5.pdf
PDF • 0.84 MB
Tendernotice_6.pdf
PDF • 0.08 MB
BARCHART_01.pdf
Tender Documents • 0.40 MB
DRAWING_1.pdf
Tender Documents • 1.08 MB
BOQ_5183065.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .