| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 LAccepted-AOC | ₹25.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹28.2 L+₹2.3 L (9.09%)Rejected-Finance | ₹28.2 L+₹2.3 L (9.09%) | L2 | Rejected-Finance HIGHER BID VALUE |
| 3 | L3₹28.5 L+₹2.7 L (10.4%)Rejected-Finance | ₹28.5 L+₹2.7 L (10.4%) | L3 | Rejected-Finance HIGHER BID VALUE |
| 4 | L4₹33.5 L+₹7.7 L (29.9%)Rejected-Finance | ₹33.5 L+₹7.7 L (29.9%) | L4 | Rejected-Finance HIGHER BID VALUE |
| 5 | L5₹33.9 L+₹8.0 L (31.2%)Rejected-Finance | ₹33.9 L+₹8.0 L (31.2%) | L5 | Rejected-Finance HIGHER BID VALUE |
Tender Value
₹33.5 L
EMD Value
₹67,033
Closing Date
30 May 2026, 11:30 amClosed
The Executive Engineer, PWD. Berhampore Division -
THE EXECUTIVE ENGINEER BERHAMPORE DIVISION - I PUBLIC WORKS DIRECTORATE B.K-II Building FOUZDARI COURT COMPOUND Cantonment Road, Berhampore Murshidabad Pin-742101 West Bengal
Construction of Separate toilet facilities within the Court Premises for the litigant public Male and Female and also for use of the Transgender and the PwD at Jangipur Sub-Divisional Court under Berhampore Division No-I, PWD in the District of Mursh
2026_WBPWD_5013904_1
WBPWD/EE/BD-I/eNIT-1/26-27
Open Tender
CIVIL WORKS
Percentage
60 days
Jangipur Sub-Division
Please refer Tender documents.
4 documents required · 4 mandatory
₹67,033
Yes
Executive Engineer,PWD. Berhampore Division - I
30 Jul 2026
11 May 2026
2 Jun 2026
15 May 2026
30 May 2026
15 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.4 | CUM | 119.27 | ₹47.71 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) Quantity taken 1/3th of of excavated earth | - | CUM | 77.54 | - |
| 3 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 1 | CUM | 599.61 | ₹599.01 |
| 4 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | - | Sqm | 326 | - |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety | 1 | CUM | 5,019.29 | ₹5,014.27 |
| 6 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation | - | Sqm | 205 | - |
| 7 | (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work | 300.69 | Sqm | 365 | ₹1,09,751.85 |
| 8 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] M 25 Grade | - | CUM | 5,884.86 | - |
| 9 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL | - | MT | 54,375.54 | - |
| 10 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth | - | CUM | 4,883.05 | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_5081774.xls
BOQ • 0.45 MB
2911_update.pdf
Tender Documents • 0.56 MB
corri1.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .