Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC NANDA VIHAR DHANAURI PATTI RAMNAGAR ROAD KASHIPUR DISTT U S NAGAR UTTARAKHAND | ALMORA | UTTARAKHAND | 244715 | ₹14.8 L | L1 | Accepted-AOC First Lowest Bid Rs. 1478550.00 |
| 2 | L2₹14.9 LRejected-Finance KHASRA NO 203 KHARAKPUR DEVIPURA KASHIPUR U S N | GORAKHPUR | UTTAR PRADESH | 273001 | ₹14.9 L | L2 | Rejected-Finance Due to Second Highest Bid Rank |
| 3 | L3₹14.9 LRejected-Finance BASIONWALA MANDIR ROAD NEAR TOWER JASPUR KHURD KASHIPUR U S NAGAR | PITHORAGARH | UTTARAKHAND | 262501 | ₹14.9 L | L3 | Rejected-Finance Due to Highest Bid Rank |
| 4 | Not Admitted-Fee OLD AVAS VIKAS KASHIPUR U S NAGAR | - | - | Not Admitted-Fee Others-No documents were Submitted by this firm in the offline Etender. |
| 5 | Not Admitted-Fee SHIVAJI COLONY NEAR SESSION COURT HALDWANI | PAURI GARHWAL | UTTARAKHAND | 246001 | - | - | Not Admitted-Fee Others-No documents were Submitted by this firm in the offline Etender. |
| Sl No | Description | Qty | Unit | KUMAUN ELECTRICALS L2 | SHIKHAR ENTERPRISES L1 | SURENDRA KUMAR CONTRACTOR L3 |
|---|---|---|---|---|---|---|
| 1.00A- Supply of Non- centralized Items | ||||||
| 1.01 | Earth wire clamp with N&B | 35 | Nos | 282 ₹9,870 | 276 ₹9,660 | 285 ₹9,975 |
| 1.02 | Suspension clamp with Eye Hook | 170 | Nos | 240 ₹40,800 | 235 ₹39,950 | 241 ₹40,970 |
| 1.03 | MS clamp with N&B for Distribution Box | 60 | Nos | 502 ₹30,120 | 498 ₹29,880 | 505 ₹30,300 |
| 1.04 | MS clamp for Dead End clamp with N&B | 80 | Nos | 282 ₹22,560 | 278 ₹22,240 | 282 ₹22,560 |
| 1.05 | Dead End clamp with I Hook | 80 | Nos | 315 ₹25,200 | 312 ₹24,960 | 316 ₹25,280 |
| 1.06 | Stay Insulator | 35 | Nos | 85 ₹2,975 | 83 ₹2,905 | 88 ₹3,080 |
| 1.07 | Shear Head Type PRC 120 to 25 Sqmm | 456 | Nos | 283 ₹1.3 L | 282 ₹1.3 L | 286 ₹1.3 L |
| 1.08 | LT Bare N. connector PG clamp 95-25 sqmm | 150 | Nos | 230 ₹34,500 | 229 ₹34,350 | 236 ₹35,400 |
| 1.09 | IPC for 120 sqmm to 120 sqmm | 300 | Nos | 329.5 ₹98,850 | 329 ₹98,700 | 331 ₹99,300 |
Tender Value
Refer Docs
EMD Value
₹45,000
Closing Date
15 Dec 2025, 12:00 pmClosed
Executive Engineer
Office of the EE EDD Jaspur
Work of replacing damaged LT AB cable and additional phase under Avas Vikas feeder under Electricity Distribution Sub Division (First) Jaspur.
2025_UPCL9_89410_1
Tender No 10/EDD(J)/2025-26
Open Tender
Electrical Works
45 days
EDD Jaspur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
EE EDD Jaspur
₹45,000
7 Mar 2026
3 Dec 2025
16 Dec 2025
3 Dec 2025
15 Dec 2025
3 Dec 2025
A- Supply of Non- centralized Items
Earth wire clamp with N&B
Suspension clamp with Eye Hook
MS clamp with N&B for Distribution Box
MS clamp for Dead End clamp with N&B
Dead End clamp with I Hook
Stay Insulator
Shear Head Type PRC 120 to 25 Sqmm
LT Bare N. connector PG clamp 95-25 sqmm
IPC for 120 sqmm to 120 sqmm
LT Distribution Box 3 Phase 4 wire
Bolt & Nuts off Size
MS Clamp with N&B for Suspension clamp
LT Bare N Con. PG clamp for L-L 95-95 sqmm
Stay clamp with N&B
AL. Crimping type lugs 25 sqmm
AL. Crimping type lugs 120 sqmm
B- Labour Charges
Erection of Earthing Rod
Excavation of Pit for Stay Set
Erection of LT Stay Set
Grouting of Stay Set
Excavation of Pit for Pole
Excavation of Single Pcc Pole
Excavation of Single SP-33 Pole
Excavation of Single SP-55 Pole
Grouting of Pole
Muffering of Pole
Painting of SP-33 Pole
Painting of SP-55 Pole
Cartage Pcc Pole, 21-50 KM
Cartage SP-33 Pole, 21-50 KM
Cartage SP-55 Pole, 21-50 KM
Cartage of Petty Material, 21-50 KM
Headload Cartage PCC Pole (0-1 KM)
Headload Cartage SP-33 Pole (0-1 KM)
Headload Cartage SP-55 Pole (0-1 KM)
Disconnection & Reconnection of Consumer
Resagging of Loose Lt line
Realignment of Tilted Pole
Installation of ACB LT Distribution Box
Re-Erection of Stay with Diggingof Pit
Supply & Fix of Stay clamp for PCC Pole
Supply & Fix of Stay clamp for SP-55
Supply & Fixing of LT clamp for PCC Pole
Erection of Dead End Clamp
Erection of Suspension Clamp
Back Headload Cart. Of Petty Mat. 0-1 KM
Headload Cart. Of Petty Mat. Above 3 KM
Erection & Laying of LT AR. Cable 4x25
Renozzeling of Existing Stay Set
Installation of 120 sqmm LT Al Lugs
Installation of 25 sqmm LT Al Lugs
Fixing of Piercing Connector 120-35 Sqmm
Fixing of PG clamp 95-95 sqmm
Fixing of PG clamp 95-70 sqmm
Supply & Fixing PRC L2L 120-120
Laying / Erection & comm. LT AB 3x120+95sq
Back Carriage of Scrap Material
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
PQR10.pdf
Tender Documents • 1.06 MB
BOQ_106022.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid