| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.4 CrAccepted-AOC | ₹22.4 Cr | L1 | Accepted-AOC First lowest agmt executed |
| 2 | L2₹23.0 Cr+₹58.3 L (2.60%)Rejected-AOC | ₹23.0 Cr+₹58.3 L (2.60%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹23.9 Cr+₹1.5 Cr (6.57%)Rejected-Finance | ₹23.9 Cr+₹1.5 Cr (6.57%) | L3 | Rejected-Finance Third lowest not admitted to net stage |
| 4 | L4₹32.6 Cr+₹10.2 Cr (45.6%)Rejected-Finance | ₹32.6 Cr+₹10.2 Cr (45.6%) | L4 | Rejected-Finance Fourth Lowest not admitted to next stage |
| 5 | Rejected-Technical | - | - | Rejected-Technical vide CE order HECE/270/2021/CE/DR1/D8 datd 22.10.21 |
Tender Value
₹20.4 Cr
EMD Value
₹5 L
Closing Date
2 Aug 2021, 6:00 pmClosed
Superintending Engineer HENC
Office of the Superintending Engineer, Harbour Engineering North Circle, Puthiyanirath, Elathur. P .O., Kozhikode-673 303
Rebuild Kerala Initiative (RKI) - Estuary training works at Puthiyangadi in Kannur District- Construction of Breakwaters at Chuttad - Palakkod estuary and Shore Protection Works
2021_HED_429082_1
PQ 02/HED/NC/2021-22
Open Tender
Civil Works - Others
Item Rate
540 days
Puthiyangadi
Please refer Tender documents.
10 documents required · 10 mandatory
₹15,000
Yes
₹5 L
Yes
1 Nov 2021
7 Jul 2021
5 Aug 2021
7 Jul 2021
2 Aug 2021
7 Jul 2021
Amount
APPENDIX :A- Estuary Training Work- Construction of Break waters
od6508/2019_2020 : Supplying granite quarry run from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 5 kg to 10 kg category stones of approved quality with specific gravity ranging from 2.65 to 2.8 for forming the filter layer of breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater including conveyance from sorting platform and dumping stones using tippler (3.5x2.5 sqm size) or any suitable methods installed at site on a moving crane having a capaciaty of not less than 20T and placing the stones at sea bed in uniform layer of design thickness for forming filter layer of breakwater as per the approved drawing and design and inspecting the profile once in a week including hire and operational charges of T & P, tippler, crane and all incidental charges etc. complete as per the direction of departmental officers at site.<br><br>Kannur District
od6509/2019_2020 : Supplying blasted rock from approved quarry to sorting site by lorry/ tipper, and sorting the stones into 10kg to 200kg category stones of approved quality having specific gravity ranging from 2.65 to 2.8 for forming the core of rubble mound breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and measurements of categorized stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and rehandling and forming the core of the break water to the lines and levels as per the approved drawings and inspecting the profile once in a week with tolerance of +/- 20cm in final levels including all cost and labour charges, hire and operational charges of light crane and cost of spalls/ quarry muck and labour for forming the roadway for movement of lorries/ tippers / cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br> Kannur District
od6510/2019_2020 : Supplying blasted rock from approved quarry to sorting site and sorting the stones into 300kg to 500kg category stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the secondary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the secondary armour and berm of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br><br>Kannur District
od6573/2019_2020 : Supplying blasted rock from approved quarry to sorting site and sorting the stones into 1 to 2 T of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br><br>Kannur District
od6511/2019_2020 : Supplying blasted rock from approved quarry to sorting site and sorting the stones into 3 to 5 T stones of approved quality having specific gravity ranges from 2.65 to 2.8 for forming the primary armour and berm of rubble mount breakwater inclusive of cost of stones, hire of lorries and machineries, labour charges required at quarry and at sorting place and the measurements of catagorised stones after proper sorting are taken on weigh bridge installed at site at the cost of the contractor with approved software having printouts using contractors supplied papers, stationeries and conveyed to the approved alignment of the breakwater and forming the primary armour of the breakwater to the lines and levels as per approved drawings with tolerance of +/- 20 cm in final levels including all cost and labour charges, hire and operational charges of mobile crane and excavator, rehandling, placing and packing and using mobile crane, inspecting the profile once in a week and cost of spalls/quarry muck and hire of machineries for forming the roadway for movement of lorries/tippers/cranes etc including all incidental charges etc complete as per the direction of departmental officers at site <br><br>Kannur District
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
Appendix B: Construction of Access Road to Break waters
3.4 : Construction of Embankment with Material Obtained from Borrow Pits <br> Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
4.1.A.1 : Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
Appendix C: River Bank Protection works
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.6 : Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.7 : Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.8 : DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
pkmco constructions pvt ltd
T.M.CONSTRUCTIONS
PKV INFRACTECH PVT LTD
Bidder Name
T.M.CONSTRUCTIONS
SHAMEER M A
PKV INFRACTECH PVT LTD
pkmco constructions pvt ltd
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_608946.xls
BOQ Document • 0.29 MB
79809538.pdf
Tender Document • 0.16 MB
PuthiyangadiRFQ.pdf
Tender Document • 0.69 MB
prlm.pdf
Tender Document • 0.09 MB
dwg.pdf
Tender Document • 1.93 MB
79809540.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .