Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹99.3 LAccepted-Finance NOT AVAILABLE | NEW DELHI | DELHI | 110001 | 1 | Accepted-Finance 1 | |
| 2 | 2₹99.8 L+₹49,900 (0.50%)Rejected-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | 2 | Rejected-Finance 2 | |
| 3 | Not Admitted-Fee/PreQual/Technical M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | KULLU | HIMACHAL PRADESH | 172002 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹44.8 L
EMD Value
₹90,000
Closing Date
14 Feb 2024, 10:00 amClosed
EE HP PWD Katrain
EE HP PWD Katrain
C O Moterable link road to village Pool
2024_PWD_85214_1
17165-72 dated 05.02.2024
Open Tender
Civil Works
Item Rate
180 days
Kangti
C O Moterable link road to village Pool
5 documents required · 5 mandatory
₹2,000
EE HP PWD Katrain
₹90,000
26 Feb 2024
6 Feb 2024
14 Feb 2024
6 Feb 2024
14 Feb 2024
6 Feb 2024
Amount
Excavation in soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper, blasting work both in soft and hard rock with chiseling/wedging out of rock( where blasting is not required ) and their intermediate classification of soil including, dewatering wherever required setting out to the required line grades, side slopes trimming bottom and level as shown on the drawings as directed by Engineer-in-charge at site according to technical specifications clause 1603.1,&1603.2 and sorting out useful/un useful materials and stacking the same in all leads and lifts and transportation of the un-useful materials for filling in road ways, embankments for grades improvements and levelling to the required grade and then disposing of surplus excvatedearth in acquired width of roads or on approved dumping sites through all modes of transportation including head load animal load or mechanical means along with its leveling fine dressing and all labour, machineries, materials, tools equipments and safety measures and incidentals necessary to complete the work by all means (if any required) Recovery for use ful stone of 2016.66Cum@ 300/-per cubic metre amounting to Rs 604998.00/- only shall be done on prorata basis for the quantity of cutting in earth work effected. Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all respect.
Shanoo Sharma Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .