Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.7 Cr
EMD Value
₹2.2 L
Closing Date
30 Nov 2026, 5:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Staff Officer (Civil), WCL, Majri Area.
At/Post Kuchana, Tahsil Bhadrawati, District Chandrapur (MS) 442503.
Barbed wire fencing with RCC post around Telwasa, Dhorwasa, Navin Kunada and Juna Kunada OC Mine under Chargaon-Telwasa Sub Area of Majri Area.
2026_WCL_368887_3
ma9511cive02226-27/409 Dated 13112026
Open Tender
Civil Works - Buildings
Percentage
180 days
Chargaon-Telwasa Sub Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹2.2 L
14 Nov 2026
14 Nov 2026
1 Dec 2026
14 Nov 2026
30 Nov 2026
15 Nov 2026
14 Nov 2026 - 23 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area | 33,900 | Sqm | 13.85 | ₹4,69,515 |
| 2 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 22,600 | Sqm | 26.85 | ₹6,06,810 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 698 | Cum | 200.85 | ₹1,40,193.3 |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | 88 | Cum | 2,191.15 | ₹1,92,821.2 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 88 | Cum | 6,309.15 | ₹5,55,205.2 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement | 233 | Cum | 9,394.95 | ₹21,89,023.35 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement:1½coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 524 | Cum | 7,432.25 | ₹38,94,499 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more | 15,060 | Kg | 95.25 | ₹14,34,465 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 4,650 | Sqm | 742.35 | ₹34,51,927.5 |
| 10 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 1,16,030 | Mtr | 11.8 | ₹13,69,154 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.08 MB
Tendernotice_2.pdf
PDF • 2.71 MB
BOQ_381883.xls
BOQ • 0.29 MB
ma9511civcordm_26-27_413_16112026.pdf
PDF • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .