Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC | ₹8.9 L Quoted ₹10.0 L | L1 | Accepted-AOC Two bidders quoted lowest rate ,they were requested to quote rock bottom rate .Safiya Enterprise -3.7 percentage below and PV Abdul Majeed -10.3 percentage below.hence work awarded to PV Abdul Majeed |
| 2 | L1₹10.0 LRejected-AOC FLOOR NO GROUND FLOOR BUILDING NO FLAT NO EP X130A CHEMBANKOLLY P O MALAPPURAM KERALA | MALAPPURAM | MALAPPURAM | KERALA | ₹10.0 L | L1 | Rejected-AOC Two bidders quoted lowest rate ,they were requested to quote rock bottom rate .Safiya Enterprise -3.7 percentage below and PV Abdul Majeed -10.3 percentage below.hence work awarded to PV Abdul Majeed |
| 3 | L2₹10.3 L+₹33,732.86 (3.39%)Rejected-AOC | ₹10.3 L+₹33,732.86 (3.39%) | L2 | Rejected-AOC Highest quoted |
| 4 | L3₹10.4 L+₹42,165.86 (4.24%)Rejected-AOC | ₹10.4 L+₹42,165.86 (4.24%) | L3 | Rejected-AOC Highest quoted |
Tender Value
₹8.4 L
EMD Value
₹21,100
Closing Date
6 Apr 2026, 4:30 pmClosed
Executive Engineer PMU Sreekandapuram
Office of The Executive Engineer ,KSEBL, PMU Sreekandapuram
11 KV INTERLINKING WORK USING HT ABC THEEYYANNUR TO KVK POOVAM
2026_KSEB_838679_3
TENDER/2025-26/6159/90 dt. 20-02-2026
Open Tender
Electrical Works
Percentage
60 days
Karimbam
Refer tender document
6 documents required · 6 mandatory
₹2,006
Yes
₹21,100
Yes
11 Jun 2026
24 Mar 2026
8 Apr 2026
24 Mar 2026
6 Apr 2026
24 Mar 2026
24 Mar 2026 - 4 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. | 26 | No | 868.77 | ₹22,588.02 |
| 2 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 39 | No | 434.91 | ₹16,961.49 |
| 3 | Doing one cable end termination on HT ABC of sizes Up to 3x150+1x120 sqmm and connecting to existing MVT or other terminals,using the cable end termination kit supplied departmentally including charges for cable jointer etc. complete as per the direction of the departmental officers. | 24 | E | 370 | ₹8,880 |
| 4 | Additional rate for excavation of Pit for A type pole in Hard Laterite. | 9 | No | 1,303.68 | ₹11,733.12 |
| 5 | Stringing of 11 kV Aerial bunched cable of size 3 x 120 + 1 x 95 sqmm with bare/insulated Messenger through existing poles | 1,300 | m | 45.62 | ₹59,306 |
| 6 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 14 | Trip | 3,142.26 | ₹43,991.64 |
| 7 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 45 | No | 762.14 | ₹34,296.3 |
| 8 | Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. | 3 | No | 2,795.55 | ₹8,386.65 |
| 9 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. | 10 | No | 564.55 | ₹5,645.5 |
| 10 | Drilling hole of various sizes on existing Channel/Cross Arm. | 60 | No | 16.73 | ₹1,003.8 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1431788.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BidDocumentretender.pdf
Tender Documents • 2.12 MB
GSTregistertion.pdf
Other Document • 0.01 MB
BOQ_1431788.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .