Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LRejected-Finance | ₹4.6 L | L1 | Rejected-Finance Rejected Since quoated amount is higher than Estimate BOQ |
| 2 | L2₹4.7 L+₹2,897.80 (0.63%)Rejected-Finance | ₹4.7 L+₹2,897.80 (0.63%) | L2 | Rejected-Finance Higher rate |
| Sl No | Description | Qty | Unit | VALAYAM L1 | BIJU THOMAS L2 |
|---|---|---|---|---|---|
| 1.00concreting | |||||
| 1.00 | OD66389/2025-2026:Surface dressing of the ground in all kinds of soil including removing vegitation and in -equalities not exceeding 15cm deep and disposal of rubbish ,lead up to 50 m and lift up to 1.5m <br>all kinds of soil. | 99 | sqm | 30 ₹2,970 Lowest | 40 ₹3,960 |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 14.85 | cum | 10,471 ₹1,55,494.35 Lowest | 10,475 ₹1,55,553.75 |
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 24.2 | cum | 1,030 ₹24,926 Lowest | 1,030 ₹24,926 Lowest |
| 1.00 | OD346905/2025-2026: DRY RUBBLE MASONRY _ Random rubble masonry with hard stone,in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 57.4 | cum | 4,600 ₹2,64,040 Lowest | 4,630 ₹2,65,762 |
| 1.00 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 1 | cum | 10,461 ₹10,461 Lowest | 10,500 ₹10,500 |
| 1.01 | OD346910/2025-2026:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 2.2 | cum | 508 ₹1,117.6 Lowest | 525 ₹1,155 |
| 1.01 | OD66388/2025-2026: Supplying and fixing Granite Name Board | 1 | each | 3,600 ₹3,600 Lowest | 3,650 ₹3,650 |
Tender Value
₹4.2 L
EMD Value
₹10,584
Closing Date
23 Oct 2025, 5:00 pmClosed
Nithin D
O/o,Assistant Executive Engineer, LSGD Subdivision Kanjirappally
Annual Plan-2025-26 Kanjirappally Block (Project No 55/26)-Basic facilities development of SC Sanketham in Ponthenpuzha Division- General Civil Work
2025_LSGD_810505_1
05/2025/AEE/LIDEW/KPLY/5PHASE dtd.16/10/2025
Open Tender
Civil Works - Others
Item Rate
180 days
Kanjirappally
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,584
Yes
21 Aug 2026
16 Oct 2025
25 Oct 2025
16 Oct 2025
23 Oct 2025
16 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1353120.xls
BOQ • 0.30 MB
NIT55.pdf
Tender Documents • 0.03 MB
SBD55.pdf
Tender Documents • 2.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .