| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹57.2 LAdmitted-Finance | -1.25% | ₹57.2 L | L1 | Admitted-Finance |
| 2 | L2₹57.4 LAdmitted-Finance | -1.00% | ₹57.4 L | L2 | Admitted-Finance |
| 3 | L3₹57.7 LAdmitted-Finance E 315 1ST FLOOR SECTOR 27 NOIDA G B NAGAR 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | -0.50% | ₹57.7 L | L3 | Admitted-Finance |
| 4 | L4₹57.8 LAdmitted-Finance | -0.25% | ₹57.8 L | L4 | Admitted-Finance |
Tender Value
₹58.0 L
EMD Value
₹1.4 L
Closing Date
1 Apr 2026, 5:00 pmClosed
DIRECTOR(H)
SECTOR-39, NOIDA
M/o Green Belt (C/o Boundary wall of Green Belt, Sector-135) Noida.
2026_NOIDA_1111760_1
49/D(H)/DD(H)-III/2025-26
Open Tender
Civil Works - Others
120 days
NOIDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,832
NOIDA
₹1.4 L
16 Apr 2026
19 Mar 2026
2 Apr 2026
19 Mar 2026
1 Apr 2026
19 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m, as directed by Engineer-in-charge. The contractor has to detect different utilities like sewer line, water supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. (DSR Code No.-2.6.1) AOR | |||||
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) (DSR Code No.-4.1.8) AOR | - | Cum. | - | - | |
Brick work with common burnt clay F.P.S. bricks of class designation 100 in super structure above plinth level up to floor five level in all shapes and size in cement mortar 1 : 4 (1 Cement : 4 C. Sand). (DSR Code No.-6.4.1) AOR | - | Cum. | - | - | |
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) (DSR Code No.-5.1.2) AOR | - | Cum. | - | - | |
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) (DSR Code No.-5.2.2) AOR | - | Cum. | - | - | |
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). (DSR Code No.-5.3) AOR | - | Cum. | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete (DSR-18/ Item Code.No-5.9.1) AOR | - | Sqm. | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts (DSR Code.No-5.9.6) AOR | - | Sqm. | - | - | |
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers (DSR Code No.-5.9.5) AOR | - | Sqm | - | - | |
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (DSR-18/ Item Code No.-5.22.6) AOR | - | Kg. | - | - | |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_2065602.xls
BOQ • 0.35 MB
Capability49.xls
Additional Documents • 0.04 MB
49.pdf
Tender Documents • 2.49 MB
NITspecialconditions2026.pdf
Additional Documents • 2.52 MB