| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹141.3 CrAccepted-AOC | ₹141.3 Cr Quoted ₹149.8 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹160.0 CrRejected-AOC | ₹160.0 Cr | 2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹34.3 L
Closing Date
6 Nov 2024, 3:00 pmClosed
SE C and M
Office of Superintending Engineer, Contracts and Monitoring, 4th Floor, CMWSS Board, No.1, Pumping Station Road, Chintadripet, Chennai 600 002
Package III Replacement of various sizes of damaged SWP / RCC sewer mains Strengthening of sewer collection system in various SPS commanding areas in Area VI under Vada Chennai Valarchi Thittam.
2024_CMWSS_481677_1
CNT/SEW/NCB/VCVT/3632/2024-25
Open Tender
Civil Works
chennai
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹34.3 L
27 Feb 2025
6 Sept 2024
7 Nov 2024
6 Sept 2024
6 Nov 2024
4 Oct 2024
Amount
Serial No.24 Strengthening of Sewer collection system in Kennady Sqaure SPS Sembium SPS Jawagar Nagar SPS Perambur SPS Thiru Vi Ka Nagar SPS & Stephanson Road SPS commanding Area (Depot 66 67 68 70 & 71) Area - VI
Bill.No.24.a Strengthening of Sewer collection System in Stephenson SPS commanding Area
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4.5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 4.5m deep
at 5m deep
at 5.5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
State Highways/ National Highways
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Bus Route
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 5m deep
at 5.5m deep
Non Bus Route
Brick Machine holes
at 1.5m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 4.5m deep
at 5m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
RATES FOR TRENCHLESS TECHNOLOGY FOR PIPE LAYING WORK
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc < 2km
For the points Underground/ Surface Assets along the roads
For underground / surface assets along the road for the distance upto 2.0km
Overpumping using diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges, and other incidental charges etc and complete for pumping out the sewage from Machine holes
Using 5HP Diesel pumpset
Using 7.5HP Diesel pumpset
Bill.No.24.B Strengthening of Sewer collection System in Jawahar Nagar SPS commanding Area
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 4 m deep
at 4.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4.5 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 4.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4 m deep
at 4.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
250mm dia CI pipe
at 4.5 m deep
at 5 m deep
300mm dia CI pipe
at 5 m deep
400mm dia CI pipe
at 4.5 m deep
at 5 m deep
at 6 m deep
500mm dia CI pipe
at 6 m deep
Bus Route
250mm dia CI pipe
at 4.5 m deep
300mm dia CI pipe
at 4.5 m deep
400mm dia CI pipe
at 4.5 m deep
at 5 m deep
at 6.5 m deep
500mm dia CI pipe
at 6 m deep
at 6.5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.5m deep
at 5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
State Highways/ National Highways
Cutting DWC Pipes
Cutting CI Pipes
250mm dia CI pipe
300mm dia CI pipe
400mm dia CI pipe
500mm dia CI pipe
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Bus Route
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.5m deep
at 5m deep
Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
Lifting and removing C.I. pipes to stores(Excluding Excavation)
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
Non Bus Route
Brick Machine holes
at 1.5m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.5m deep
at 5m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
358/300mm OD/ID DWC PE or PP pipe
at 4 m deep
at 4.5 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 4.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
300mm dia CI pipe
at 5 m deep
400mm dia CI pipe
at 4.5 m deep
at 5 m deep
at 6 m deep
500mm dia CI pipe
at 6 m deep
Bus Route
400mm dia CI pipe
at 5 m deep
at 6.5 m deep
500mm dia CI pipe
at 6 m deep
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc < 2km
For the points Underground/ Surface Assets along the roads
For underground / surface assets along the road for the distance 2.0km to 5.0km
Overpumping using diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges, and other incidental charges etc and complete for pumping out the sewage from Machine holes
Using 5HP Diesel pumpset
Using 7.5HP Diesel pumpset
Bill.No.24.C Strengthening of Sewer collection System in Ekangipuram SPS commanding Area
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Road Cutting using braker
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus route
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Non Bus Route
Brick Machine holes
at 1.0m deep
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1 m deep
at 1.5 m deep
at 2 m deep
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.
Non Bus Route
For 1.5m deep
For 2.0m deep
Overpumping using Diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges and other incidental charges etc and complete for pumping out the sewage from Machine holes
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities
Pipe laying - 5 - 15 Km
Inspection chamber
Serial No.26 Strengthening of Sewer collection system in Purasaiwakkam SPS Edward park SPS & Nammalvarpet SPS commanding Area (Depot 72 73 75 76 & 78) Area - VI
Bill.No.2 Strengthening of Sewer collection System in TVK SPS commanding Areas
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1 m deep
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
597/500mm OD/ID DWC PE or PP pipe
at 4 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.0m deep
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.0m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Providing and constructing vertical drop arrangement of 0.6 m and more height as required including providing and jointing special such as double T. Bend required Upvc pipe fixed in m-100 C. C. at required level as type design cutting, jointing and fitting as per specification etc. complete.
Non Bus Route
250 ID DWC PE or PP pipe
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.0m deep
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Non Bus Route
Brick Machine holes
at 1.0m deep
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc < 2km
For the points Underground/ Surface Assets along the roads
For underground / surface assets along the road for the distance <2.0km
Overpumping using diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges, and other incidental charges etc and complete for pumping out the sewage from Machine holes
Using 5HP Diesel pumpset
Using 7.5HP Diesel pumpset
Bill.No.2.A Strengthening of Sewer collection System in Kennady Square SPS commanding Areas
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3.5 m deep
at 4 m deep
358/300mm OD/ID DWC PE or PP pipe
at 4 m deep
at 4.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
400mm dia CI pipe
at 5 m deep
500mm dia CI pipe
at 4.5 m deep
at 5 m deep
600mm dia CI pipe
at 5 m deep
400mm dia CI pipe
at 5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
at 4.0m deep
at 5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.5m deep
at 5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
State Highways/ National Highways
Extra cost for Road Cutting(if thickness of Bitumen>15cm)
Bus Route
Cutting DWC Pipes
Cutting CI Pipes
400mm dia CI pipe
500mm dia CI pipe
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Bus Route
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.5m deep
at 4.0m deep
at 5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.5m deep
at 5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 5m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Non Bus Route
Brick Machine holes
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 4.0m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 4 m deep
358/300mm OD/ID DWC PE or PP pipe
at 4 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
500mm dia CI pipe
at 5 m deep
600mm dia CI pipe
at 5 m deep
Bus Route
400mm dia CI pipe
at 5 m deep
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
RATES FOR TRENCHLESS TECHNOLOGY FOR PIPE LAYING WORK
Overpumping using diesel engine pumpset including hire chagres cost of diesel, engine oil, pump operator, labour charges and incidential chagres extra and complete for pumping out sewage from machine holes
using 5HP diesel pump
using 7.5HP diesel pump
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base.
Inspection chamber
Bill.No.2.C Strengthening of Sewer collection System in Nammalwarpet SPS commanding Areas
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1 m deep
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation including timbering the trenches for depths 2.5m and above, pumping out subsoil water etc., complete.
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3 m deep
at 3.5 m deep
at 4 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
597/500mm OD/ID DWC PE or PP pipe
at 4 m deep
at 4.5 m deep
715/600mm OD/ID DWC PE or PP pipe
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
500mm dia CI pipe
at 4.5 m deep
at 5 m deep
at 5.5 m deep
600mm dia CI pipe
at 5.5 m deep
at 6 m deep
at 6.5 m deep
700mm dia CI pipe
at 6 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.0m deep
at 4.5m deep
at 5m deep
at 5.5m deep
at 6m deep
at 6.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
Cutting DWC Pipes
Cutting CI Pipes
500mm dia CI pipe
600mm dia CI pipe
700mm dia CI pipe
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary/Permanent Plugging and blocking of sewer line, branch connections and diversion of flows and removal of all plugs, Hire charges for diesel pumpset for 3 HP/5HP/7.5HP with fuel and crew charges including transportation and Delivery and Suction Hose Pipe(160mm/120m).
Non Bus Route
300mm dia. & below sewer line
400 to 500mm dia sewer line
Bus Route
300mm dia. & below sewer line
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.0m deep
at 4.5m deep
at 5m deep
at 5.5m deep
at 6m deep
Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
Non Bus Route
Brick Machine holes
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 2.0m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 4 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4 m deep
597/500mm OD/ID DWC PE or PP pipe
at 4 m deep
at 4.5 m deep
715/600mm OD/ID DWC PE or PP pipe
Bus Route
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
500mm dia CI pipe
at 4.5 m deep
at 5 m deep
600mm dia CI pipe
at 6 m deep
700mm dia CI pipe
at 6 m deep
Overpumping using diesel engine pumpset including hire charges, cost of diesel, Engine oil, Pump operator, Labour charges, other incidental charges etc and complete for pumping out the sewage from machine holes
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities
Pipe laying - 5 to 15 km
Inspection chamber
Bill.No.2.D Strengthening of Sewer collection System in Sembium SPS commanding Areas
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 3 m deep
at 4 m deep
at 4.5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
at 5.5m deep
at 6m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 4.0m deep
at 4.5m deep
at 5m deep
at 5.5m deep
at 6m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
State Highways/ National Highways
Cutting DWC Pipes
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
at 5.5m deep
at 6m deep
Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 4.0m deep
at 4.5m deep
at 5m deep
at 5.5m deep
at 6m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
Brick Machine holes
at 1.5m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 4.5m deep
at 6m deep
Non Bus Route
Brick Machine holes
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 5m deep
at 6m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 3 m deep
at 3.5 m deep
at 4 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 4.5 m deep
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Bus Route
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.
Non Bus Route
For 1.5m deep
For 2.0m deep
Bus Route
For 1.5m deep
Overpumping using diesel engine pumpset including hire chagres cost of diesel, engine oil, pump operator, labour charges and incidential chagres extra and complete for pumping out sewage from machine holes
upto 2metre
using 5HP diesel pump
above 2 metre
using 5HP diesel pump
using 7.5HP diesel pump
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base.
2 km to 5 km
Inspection chamber and machine hole
Bill.No.2.E Strengthening of Sewer collection System in Ekangipuram SPS commanding Areas
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3.5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Bus Route
Road Cutting using braker
Bus Route
Asphalt Road
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Bus route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.
Bus Route
For 1.5m deep
For 2.0m deep
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.5m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
Overpumping using Diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges and other incidental charges etc and complete for pumping out the sewage from Machine holes
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone44N). The final base map with assets and utilities
Pipe laying - 5 - 15 Km
Inspection chamber
Bill.No.2.E Strengthening of Sewer collection System in Ekangipuram SPS commanding Areas
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1 m deep
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.0m deep
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Road Cutting using braker
Non Bus Route
Asphalt Road
Concrete Road
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.0m deep
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Non Bus Route
Brick Machine holes
at 1.0m deep
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1 m deep
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
Supply, delivery, erection of sheet piles and fixing in position using timbering for trenches of average depths of 1.5m to 2.0m, including hire charges of sheet piles, dismantling the shoring after completion of work, etc., complete.
Non Bus Route
For 1.5m deep
For 2.0m deep
Overpumping using Diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges and other incidental charges etc and complete for pumping out the sewage from Machine holes
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities
Pipe laying - 5 - 15 Km
Inspection chamber
Serial No.29 Strengthening of Sewer collection system in KP Park SPS commanding Area (Depot 77 & 73) Area - VI
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
358/300mm OD/ID DWC PE or PP pipe
at 1.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 1.5 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3 m deep
597/500mm OD/ID DWC PE or PP pipe
at 4.5 m deep
715/600mm OD/ID DWC PE or PP pipe
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3 m deep
at 3.5 m deep
at 4 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.5m deep
Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
Non Bus Route
Brick Machine holes
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
480/400mm OD/ID DWC PE or PP pipe
at 1.5 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3 m deep
597/500mm OD/ID DWC PE or PP pipe
at 4.5 m deep
715/600mm OD/ID DWC PE or PP pipe
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 3 m deep
at 3.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3 m deep
Overpumping using diesel engine pumpset including hire charges, cost of diesel, Engine oil, Pump operator, Labour charges, other incidental charges etc and complete for pumping out the sewage from machine holes
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities
Pipe laying - 2 to 5 Km
Serial No. 30 Replacement of existing erroded 1200mmdia RCC pipe at various locations in Depot 76 in Area VI
Bill.No.30.A Strengthening of Sewer collection System in Naermai Nagar SPS
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation including timbering the trenches for depths 2.5m and above, pumping out subsoil water etc., complete.
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
at 4.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4.5 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4 m deep
at 4.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
at 4.5 m deep
at 5 m deep
600mm dia CI pipe
at 5 m deep
Bus Route
250mm dia CI pipe
at 4.5 m deep
at 5 m deep
400mm dia CI pipe
at 4.5 m deep
at 5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
State Highways/ National Highways
Cutting DWC Pipes
Cutting CI Pipes
250mm dia CI pipe
400mm dia CI pipe
600mm dia CI pipe
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Bus Route
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary/Permanent Plugging and blocking of sewer line, branch connections and diversion of flows and removal of all plugs, Hire charges for diesel pumpset for 3 HP/5HP/7.5HP with fuel and crew charges including transportation and Delivery and Suction Hose Pipe(160mm/120m).
Non Bus Route
300mm dia. & below sewer line
Bus Route
300mm dia. & below sewer line
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Lifting and removing C.I. pipes to stores(Excluding Excavation)
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
Brick Machine holes
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
Non Bus Route
Brick Machine holes
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 4 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4.5 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
400mm dia CI pipe
at 5 m deep
600mm dia CI pipe
at 5 m deep
Bus Route
250mm dia CI pipe
at 4.5 m deep
at 5 m deep
400mm dia CI pipe
at 4.5 m deep
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc < 2km
For the points Underground/ Surface Assets along the roads
For underground / surface assets along the road for the distance <2.0km
Overpumping using diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges, and other incidental charges etc and complete for pumping out the sewage from Machine holes
Using 5HP Diesel pumpset
Using 7.5HP Diesel pumpset
Supply Laying ,Jointing 300 mm dia CI S/S pipes (A class) with EDPM rubber gaskets including earth work excavation in hard stiff clay, black cotton, hard red earth, shales, murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m, carting the pipes to the site of work lowering in to the trenches, aligning includng refilling the trenches, disposal of surplus earth etc; complete at an average depth of 1.5m
Supply Laying ,Jointing 300 mm dia CI S/S pipes (A class) with EDPM rubber gaskets including earth work excavation in hard stiff clay, black cotton, hard red earth, shales, murrum gravel, stoney earth and earth mixed with small size boulders depositing the earth on banks with initial lead of 10m, carting the pipes to the site of work lowering in to the trenches, aligning includng refilling the trenches, disposal of surplus earth etc; complete at an average depth of 1.5m
Supply, conveying and fixing CI specials like Tee, Bends and Tapers as per IS 1538 including earthwork excavation, lowering into the trenches, aligning, refilling the trenches with excavated soil, watering and ramming to consolidation, etc. at any depth.
300 mm D/Soc CI 90o Bend
300 mm D/Soc CI 45o Bend
300 mm D/Soc CI 22.5o Bend
300mm DN Sluice valve
200mm DN Scour valve
80mm Sluice valve
80mm Double Air valve
Specials for 300mm Sluice valve
300 mm 1.0m Cut Pipe
300 mm CI collars
300 mm F/Spi Tail Piece
300 mm F/Soc Tail Piece
Specials for 200 mm Scour valve
300 mm x 200 mm A/Soc C.I Tee
200 mm D/F C.I pipe - 0.5m long
200 mm D/F C.I pipe - 1.5m long
200 mm D/F C.I pipe - 2.0m long
200 mm D/F C.I pipe - 3.0m long
200 mm CI collars
200 mm F/Spi Tail Piece
200 mm F/Soc Tail Piece
200 mm D/F 90oDuck Foot Bend
200 mm D/F 90o Bend
200 mm 2.0m Cut Pipe
Specials for 80 mm Air valve
300 mm x 80 mm D/Soc/Fl Tee
Construction of Sluice valve chamber including providing and fixing L.S. cover and frame of size 60 x 60cm
300 mm Dia Sluice valve
200 mm Dia Scour valve
Construction of Air valve chamber of size 2.0m x 1.2m x 2.5m including providing and fixing L.S. cover and frame of size 60 x 60cm
80 mm Dia Double Air valve
Jointing the CI specials with molten lead and yarn including caulking the joints and testing to the required pressure with water. (Including cost of Jointing materials)
Cutting C.I Pipes
300 mm dia
Cutting Asphaltic Road
Non Bus Route
Jointing the double flanged specials with rubber insertion to the required specifications with M.S bolts and nuts, complete.
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites
Testing of M.S./C.I./P.V.C./D.I pipes with hydraulic testing equipment by filling with water(including cost of water@ Rs.77/KL) and testing to recommended pressure in convenient stetches and attending the bursts if any occured during the test, excluding the cost of pipes, including other incidental and operational charges, etc., complete for 300mm dia pipe
Cement concrete 1:2:4 using 20mm gauge hard broken stone jelly for PCC works excluding centering, shuttering, compacting, curing, finishing etc complete.
For Bed Block
Providing thrust blocks with Plain Cement Concrete in 1:3:6 with 40mm HBG for the CI pumping main including the cost of shuttering, compaction, curing etc. complete.
300 mm D/Soc CI 90o Bend
300 mm D/Soc CI 45o Bend
300 mm D/Soc CI 22.5o Bend
Wet Mix with 100mm thick Cement Concrete M20 Grade
Supply, delivery, erection, testing and commissioning of non-clog submersible sewage pumpset with following duty point, including required capacity 3 Ph, 415 V, AC, 50 Hz, Electrical Motor with suitable weather proof cable (Copper ) of total length of 35 m, VFD control panel, Pedestal Coupling, guide wire / guide pipe (GI-50 mm dia) of length 10m, M.S.(GLVD) lifting chain of length 10m, necessary level controlling probes with sufficient length of armoured copper LTUG cable to connect the probe from the junction box to the control panel, fasteners including laying of pump cable under ground with suitable conduit and clamping on walls / trays and incidental civil works etc.complete.
Pump 1 - 4166.4 lpm against a total head of 15.67 m
Supply, delivery, erection, testing and commissioning of electrically driven non-clog sewage submersible Grit pumpset including agitator arrangements, with the following duty point, including required capacity 3 Ph, 415 V, AC, 50Hz Electrical Motor with suitable weather-proof cable (copper ) of total length 25 m, control panel, Skirtbase, Flanged Elbow, lifting chain M.S.(GLVD) of length 10m, necessary level controlling probes with sufficient length of armoured copper LTUG cable to connect the probe from the junction box to the control panel, fasteners including laying of pump cable under ground with suitable conduit and clamping on walls / trays and incidental civil works etc.complete.
Supply, delivery, erection, testing and commissioning of following sizes of power shunt capacitor for power factor improvement, suitable to operate on 415V, 3Ph,50Hz A/C supply, on suitable angle iron frame-works (37.5 mm x 37.5 mm x 6.24mm ) at a height of 0.25m from the ground, including earthing and incidental civil works etc., complete.
Pump 1 - 10 kVAR
Supplying and fixing of 100 Amps Triple Pole fuse carrier in MS Sheet steel encloure with provision for accommodating the TNEB meter including earthing etc., complete.
Supplying and fixing of 100 Amps Triple Pole SFU with HRC fuses on suitable angle iron frame with earth connection only.
Capacity of M.V. Panel - 100 Amps 100 A FP(SN) MCCB 25 kA (for EB) 100 A FP(SN) MCCB 25 kA (for DG) 75 A TP MCCB 25 kA for Pump 1 63 A TP MCCB 25kA (for Pump 1 cap.)
32 A TPN MCB 10kA (for LDB & Spare )
Capacity of D.G. Set - 63 kVA
Supplying and clamping of variuos sizes of PVC insulated PVC sheathed armoured aluminium LT UG cable by MS clamps on wall or in a trench to be excavated at a depth of 2 ½ ' putting 6” layer of sand and covering the cable with brick and sand refilling the earth to make good as directed.
From 100 Fuse Carriers to 100 Amps SFU & from there to 100 Amps MCCB Switch of MV panel (Wall)
size 3.5C, 50 Sqmm
From Control Panel of DG to 100A MCCB of MV Panel (Under ground)
size 3.5C, 50 Sqmm
From 75 A MCCB of MV Panel to Control Panel of Pump 1 (Wall)
size 3.5C, 35 Sqmm
From A MCCB of MV Panel to Control Panel of Grit Pump (Wall)
From 63 A MCCB of MV Panel to Pump 1 Capacitors (Wall)
size 3C, 10 Sqmm
From A MCCB of MV Panel to Grit Pump Capacitor (Wall)
From 32A MCB of MV Panel to LDB (Wall) size 4 core 10 sq.mm
From control Panel of Pump to Local P.B. Station and for PLC signal cables size 3 core 2.5 sq.mm copper (Under ground)
Supplying and fixing of cable gland and termination with Al. cable lugsfor the following sizes of PVC insulated PVC sheathed armoured alumunium LT UG cable and with earth connection.
size 3.5C, 50 Sqmm (EB)
size 3.5C, 50 Sqmm (DG)
Size 3.5C, 35 sq.mm (Pump 1)
size 3C, 10 Sqmm (Pump 1 capacitor)
Size 4 core 10 sq.mm (LDB)
size 3 core 2.5 sq.mm copper
Supply delivery and fixing of out door weather proof junction box fabricated in MS sheet steel (12 SWG for front 14 SWG for other sides) near the suction well for terminating the Pump power cable and control cable on an angle iron frame at convenient height for working and above the local MFL with provision for terminal block & earthing as per IS including incidental civil works etc.,complete.
For Pump 1
Supply, delivery and fixing of out door wheather proof Local Push Button station in the compartment provided in the Junction Box with 1 No"ON" and 1 No "OFF" push buttons (the "OFF" push button shall be locable in "OFF" position).
Supply, delivery and erection of Three Phase 6 way 32 Amps, 10kA LDB with the following: 1 No of 40 A FP isolator for incoming supply 3 Nos. of 16A, DP RCCB 3 Nos. of 16A, SP MCB 1 No of 16A, DP MCB 3 Nos of 6A, DP MCB in sheet steel enclosure fitted with busbars and neutral links and suitable angle iron frame works with provision for earthing etc. complete.
Run of 2 of 2.5 sq mm PVC unsheathed copper single core cable in PVC pipe for mains with continuous earth connection by 14 SWG wire From the MCB DB to the Switch boards in office, store,and 16A power socket.
Wiring with 2.5 sq mm PVC insulated single core copper cables of 650 V Grade on suitable rigid PVC pipe on wall and ceiling with PVC accessories, with MS switch box covered with 3 mm thick hylam sheet with continous earth wire connection of 14 SWG TC wire.
Light points
Fan Points
Wiring with 2.5 sq.mm PVC unsheathed single core copper cable on suitable rigid PVC pipe for 5A 3 pin CS plug non interlocking including supply and fixing of plug pin top in MS box with continuous earth connection by 14 SWG TC wire.
Lighting Fixtures
Supplying and fixing of box type 4’ 20W single LED fitting complete with TW round block and tube on ceiling or wall with connection.
Supplying and fixing of 18 Watt LED lamp with round type LED Troffer recessed mounted fitting complete.
Supplying and fixing of 12" sweep AC exhaust fan complete including providing necessary opening in the wall.
Supply and fixing of 48" sweep AC ceiling fan complete with regulator with lm down rod (stem pipe) including supplying and fixing of fan clamp with side plates and cross arms.
a) Supply and erection of 1 No 3" dia 2 m long tubular Wall Mounted post with complete 120W LED lamp with necessary fitting and other accessories etc.
Supplying and clamping of PVC , LTUG cable by M.S.clamps on wall for 2 core 4 sq.mm
Suppling and fixing of cable gland and termination with earth connection for 2 core 4 sq.mm
Supplying and fixing of 15 amps, single phase, DP SFU switch with F&N on suitable TW Board with earth connection only
a) Supply and erection of 1 No 3" dia 5 m long tubular Pole Mounted post with complete 250W sodium vapour lampwith necessary fitting and other accessories etc.
Supplying and laying of PVC , LTUG cable under ground in a trench to be excavated at a depth of 2 ½ ' putting 6” layer of sand and covering the cable with brick and sand refilling the earth to make good as directed for 2 core 4 sq.mm
Supplying and clamping of PVC , LTUG cable by M.S.clamps on wall for 2 core 4 sq.mm
Suppling and fixing of cable gland and termination with earth connection for 2 core 4 sq.mm
Supplying and fixing of 15 amps, single phase, DP SFU switch with F&N on suitable TW Board with earth connection only
Supply and delivery of the following safety equipment a) 5 kg capacity ISI marked dry chemical powder type fire extinguisher
First Aid box ( medium)
Fire bucket - 3 Nos with MS stand
Rubber mat 6mmthick of 1.1 kv grade of size 2m x 1m
Fire safety rules chart
Shock treatment chart
Caution / Danger Board
Supply and delivery of the following tools:
Double ended open jaw spanner set of size in mm 6x7, 8x9, 10x11, 12x13, 14x15, 16x17, 18x19, 20x22, 20x23 24x27, 25x28 & 30x32
Ring spanner set of size in mm 6x7, 8x9, 10x11, 12x13, 14x15, 16x17, 18x19, 20x22 20x23 24x27, 25x28 & 30x32.
Screw driver of size 12 inches
Cutting plier of size 8 inches
Tong Tester ( clamp on type- multiutility) A C voltage 0 - 750 V AC current 0 - 1000 A D C voltage 0 - 1000 V Resistance 0 - 40 mega ohms
Electrical tester
Diesel Filling Pump (Hand operated )
Measuring Dip Rod (MS) (for measuring 200 ltr. standard Barrel )
Hack Saw frame with blade
Lever type Grease gun
Supply and delivery of Rechargeable emergency lamp with 600mm Fluorocuent lamp, dry type rechargable battery etc.,complete.
Earthing as per ISI specifications with necessary masonary work
Supply and connection of earthing conductor including two coats of approved painting and laying between earth pit and equipments
25 x 6 mm GI Flat
40 x 6 mm GI Flat
Operation and maintenance of the installation: Operation and maintenanceof the plant with all auxiliary equipment for a period of 120 days for each station after satisfactory supply, erection , commissioning and operating the entire plant for 30 days, free of cost by the contractor before handing over the plant to the Board.
Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murum, gravel, stoney earth or earth mixed with small size boulders and hard gravely soil as per SS20B with initial lead of 10m and lift of 2m etc. complete.
For 0 to 2 m depth
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for RCC well curb and well steining.
From 1.0m above ground level to 3.0m below ground level (Curved Surface)
7 m to 8 m below GL
Providing and laying in position machine batched machine mixed and machine vibrated design mix. Sulphate resistance cement concrete M30 grade (River sand) for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly excluding the cost of centering and shuttering and reinforcement but including curing, Mixer, vibrator, etc. as per standard specification and as directed at site
From 1.0m above ground level to 1.5m below ground level
From 1.5m to 4.5m below ground level
From 4.5m to 9.0m below ground level
Cement concrete 1:2:4 using Crushed stone sand (M-sand) and 20mm gauge hard broken stone jelly & SRC for plain concrete works including laying ramming curing, etc., complete..
4.5m to 9m depth
Providing point edge to well curb using ISA 200x150x16 mm of weight 42.2 kg/m
Sinking of well below water level including all incidental charges using special tools and plants such as air compressior, helmet etc., complete and including baling out water.
3 m dia well
First depth of 2m
Second depth of 2m
Third depth of 2m
Fourth depth of 2m
Plugging the bottom of the well using C.C 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly with 10% excess cement for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing etc complete
4.5m to 9m depth
Supplying, fabricating CRS bars manufactured by Primary steel including cost of steel, binding wire, cutting, cranking and tying, in position with binding wire assembly etc complete.
Plastering with cement mortar 1:3 (SRC) using Crushed stone sand (M-sand) for 20mm thick including curing, etc., complete
Plastering with cement mortar 1:3 using Crushed stone sand (M-sand)) for 12mm thick including curing, etc., complete.
Refilling with excavated earth complying with standard specifications for filling in foundations & basement other than sand including watering & consolidating etc.,
Disposal of surplus earth
Supplying and fixing C.I.steps.
Colour washing two coats over one coat of white washing
Supply and erection of Cast Iron single faced manually operated rising type 300mm dia penstock with extension rod of 7m length conforming to relevant IS with IS markings on it, having cast iron door and frame with Gunmetal seating, spindle made of Stainless steel, CI head stock with gear arrangment and hand wheel fitted in well.
Supplying and fixing SS screen of grade 316. The screen shall be fabricated out of stainless steel flats of 50 x 10mm. The outer frame also shall be of 50 x 10mm fixed inside the well for seating the screen. The screen shall be so fabricated that the inclined portion of the screen is fixed and the horizontal portion of the screen is a removable one for lifting the pump for maintenance purpose. Outer frame and 50x10mm SS flats spaced at 35mm centre to centre to serve bar screens inside the screen well
Supply and installation of SS open mesh flooring with 25x6mm thick flats for outer frame and 25x3mm SS and 12x3mm SS flats spaced at 30mm and 60mm respectively and 50x10mm SS flats for mesh support and 50x50x6mm SS angle for opening forming a mesh over the surface of the well etc,complete
Supplying and fixing PVC water bar, 150 mm wide for construction joint
Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m etc. complete.
Upto 2.0 m below GL
From 2.0 m to 3.0 m below GL
Supplying and filling crushed stone sand (M sand) for foundation and basement including watering, consolidating, ramming etc. complete.
Cement concrete 1:3:6 using 40mm gauge hard broken stone jelly including laying in layers of not more than 15cm thick including ramming curing etc complete (M-sand)
1.5 m to 4.5 m below GL
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3m high.
Upto 3.0 m height above and below GL
Providing and laying in position machine batched machine mixed and machine vibrated design mix. Sulphate resistance cement concrete M25 grade (M-sand) for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly excluding the cost of centering and shuttering and reinforcement but including curing, Mixer, vibrator, etc. as per standard specification and as directed at site
Upto 1.5 m below GL
From 1.5 m to 4.5 m below GL
Upto 1.5 m above GL
From 1.5 m to 4.5 m above GL
Supplying, fabricating CRS bars manufactured by Primary steel including cost of steel, binding wire, cutting, cranking and tying, in position with binding wire assembly etc complete.
Plastering with cement mortar 1:3 (SRC) using Crushed stone sand (M-sand) for 12mm thick including curing, etc., complete.
Colour washing two coats over one coat of white washing
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations & basement
Disposal of surplus earth
Supply and fixing ISMB 300mm of 44.2kg/m for 7m on column over suction well
Erecting pulley block of 1 Tonne capacity with a 3m chain including additional chain length of 11m facilitate for horizontal movement on the beam etc complete - For Suction well
Painting with superior quality ready mixed paint of chocolate, light green, grey or any other approved colour over ISMB (for new iron work two coats).
Earth work excavation in all kinds of soils except hard rock requiring blasting inclusing of shoring strutting and bailing out water whereever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing surplus earth within in compound in places as shown by the departmental officers clearing and levelling the site with initial lead of 10mts. and lift of 2m etc. complete.
Upto 2 m below GL
From 2 m to 3 m below GL
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing, etc., complete
From 1.5 m to 4.5 m below GL
Providing formwork with centering for soffits of reinforced cement concrete slabs or plain surface including strutting upto 3.0m high etc complete complying with standard specifications.
Upto 3 m below GL
Providing and laying in position machine batched machine mixed and machine vibrated design mix. Sulphate resistance cement concrete M25 grade (M-sand) for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly excluding the cost of centering and shuttering and reinforcement but including curing, Mixer, vibrator, etc. as per standard specification and as directed at site
Upto 1.5 m below GL
From 1.5 m to 4.5 m below GL
Supplying and fabricating CRS/Thermo Mechanically Treated High Corrosion Resistance bars manufactured by Primary steel producers/Integrated Steel Plants as per IS:1786-2008,including fixing with binding wires, assembling and laying in position for all RCC works
Cement concrete 1:2:4 using Crushed stone sand (M-sand) and 20mm gauge hard broken stone jelly & SRC for plain concrete works including laying ramming curing, etc complete.
From 1.5 m to 4.5 m below GL
Precast slab 100mm thk in Cement Concrete 1:2:4 using Crushed stone sand (M-sand) and 12 to 20mm gauge hard broken stone jelly for reinforced cement concrete works including cost of steel, centering, shuttering and cost of steel reinforcement and including laying in position, compacting, curing, finishing,as per drawings,or as directed etc., complete.
Plastering with cement mortar 1:3 using Crushed stone sand (M-sand) & SRC for 20mm thick including curing, etc., complete
Plastering with cement mortar 1:3 using Crushed stone sand (M-sand) for 12mm thick including curing, etc., complete
Refilling with excavated soil (other than sand) compling with standard specification for filling in foundation and basement etc. complete
Disposal of surplus earth
Supplying and fixing C.I.steps.
Excavation in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel stoney earth and earth mixed with small size boulders as per SS 20B with initial lead of 10m and lift of 2.0m etc. complete.
Supplying and filling sand for foundation and basement including watering, consolidating, ramming etc. complete. ( M Sand )
P.C.C 1:3:6 using 40mm gauge hard broken stone jelly including laying in layers of not more than 15cm thick including ramming curing etc complete (M Sand)
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including strutting upto 3m high.
Above 3m high
4 - 5 m high
Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade (M Sand) for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly excluding the cost of centering and shuttering and reinforcement but including curing, fixing, fan clamps etc., as per standard specification and as directed by the Board officers complete.
upto Plinth level
Ground floor
First floor
Sun shade laying C.C. 1:2:4 for RCC sunshade work using 20mm hard broken stone jelly 80mm thick at wall end and 50mm thick at free end projecting 600mm from wall face moulded along with RC lintels and tailed into the full thickness of wall where there are no lintels excluding cost of reinforcement but including centering, shuttering, compacting, curing and finishing, etc., complete
Supplying and fabricating CRS/Thermo Mechanically Treated High Corrosion Resistance bars manufactured by Primary steel producers/Integrated Steel Plants as per IS:1786-2008,including fixing with binding wires, assembling and laying in position for all RCC works
Stock brick work in cement mortor 1:4 using second class bricks including curring etc. complete for 23 cm thick wall (M sand)
upto 1.5m from G.L.
Ground floor
Stock brick work in cement mortor 1:4 using (Crushed stone sand (M-sand)) second class bricks including curring etc. complete for over 23 cm thick wall
Stock brick work in cement mortor 1:4 using (Crushed stone sand (M-sand)) second class bricks including curring etc. complete for 11cm thick wall.
Plastering with C.M 1:5 (Crushed stone sand (M-sand)) for 12mm thick including curing etc. complete
Special celling plastering 10mm thick with C.M. 1:3 Crushed stone sand (M-sand) for RCC slabs and beams, columns, roof slabs and sun shade
Flooring 100mm thick base concrete in C.M. 1:4:10 using 40mm B.G. jelly including laying, ramming, curing etc. complete complete
Granolithic flooring 25mm thick with cement concrete 1:2:4 using 3-10mm chips and top surface rendered smooth with cement including thread lining and 25mm dia G.I. pipe of necessary length for water outlet curing, etc. complete
Dadooing walls with glazed tiles of sizes 15cmx15cmx6mm thick laid in CM 1;2, 10mm thick and pointing with white cement using 0.4 Kg/m2 including finishing the joint and pointing flush with tile surface, etc., complete.
Terrace flooring with two course of pressed tiles 15x15x1.2 cm using cement mortor 1:3 mixed with crude oil 10% by weight of cement and pointed with same oiled mortor
Weathering course concrete with broken brick jelly 20mm guage in pure slacked lime over RCC roof slab in proportion of 32:12 (no sand to be sued) well beaten with wooden beaters to be required depth of 80mm thick and giving rerquired slope and thickness to roof as required etc. complete.
Best Indian TW cupboard with frames 100x60mm alround and shutters 40mm thick with moulded panels in 20mm thick planks and 4nos of iron hold fasts fixed in CC 1:2:4 using 3-10mm chips 6nos of butt hinges 100mm long including necessary fittings brass padlock 100mm long of suitable size and suitable brass handles, screws etc complete The cupboard will have 4nos of RCC precast slabs 40mm thick and 40mm bearing at sides nearly packed with CM etc. and firmly fixed in position. The RCC work will be 1:2:4 mix using stone jelly 6-10mm gauge with necessary reinforcement and rendered smooth with CM on all faces curing etc complete The rear face of the cupboard will be 50mm thick using country bricks in CM 1:4.
Supplying and erecting rolling shutters 76mm, 18 guage of galvanized steel sheet with push and pull tupe or self coiling type operated by operated by pulling hook with top cover including lock arrangements and fixing in position inside or out side etc. complete and painting with priming coat of red oxide with out lock (Payment will be made only for actual opening of shutters)
Maufacturing supplying and fixing in position Anodised Alu. Natural colour mat finish with openable type window with extruded Alu. Sections with two panels of size (Frame - 38 x 33 x21 x 2.4mm @ 0.615 Kg/m, Shutter: Bottom, Top - 38.5 x 33 x 24.5 x 3 & 4mm @ 0.706 Kg/m, Interlocking vertical - 59 x 33 x 25 x 2.5mm @ 1.135 Kg/m) with necessary accessaries such as rubber beadings best quality of lock handle hinges,stays and fixing 4 mm thick plain / frosted/ pin headed glass including cost of all materials labour for electrical consumption required for drilling holes in RCC columns, beams, masonry wherever necessary with power drill to the extent required and made good to the original conditions after fixing as directed by the Board officers.The Al.Surfaces is to be anodised with matt finish usder electrically condition in accordance with ISI1868/1962 specification for an average anodic film thick of not less than 15 microns. (All materials should be got approved by the Site Engineer before fixing in position)
Supplying, fabricating and fixing in position of Alumi.Anod.natural colour matt finish door half glazed and half PLB board using 12 mm thick PLB board and 5.5 mm thick glazed door using rectangular Alu.Box section of size (Frame : Section - 101.60 x 44.45 x 3.18 mm @ 2.399 Kg/m, Shutter : Top, Middle, Vertical style- 50 x 44.45 x 2.5mm @ 1.292 Kg/m, Bottom - 100 x 44.45 x2.5mm @ 1.974 Kg/m) with necessary accessories such as rubber beading, Al. Clips, Best double action floor springs, Aluminium Handles on both sides,floor stopper,Tower bolt, Locks and glass including all materials,Labour, power consemption charges required for fabrication if necessary chipping, dismantling making necessary holes in RCC Coloums, Beams or Masonry wherever necessary with power drill to the extent required and made good to the original conditions after fixing etc.,complete. The Alumi. surface must be anodised with matt finish under electrically controlled condition in accordance with IS specification 1868 / 1962 of Anodic filthickness of not less than 15 Microns (Fifteen) for all sections.All the materials should be got approved by the Site Engineer before fixing as directed.
Solid PVC door shutters using 19 Gauge 19mm MS square tubes for styles and outer frames for top, lock and bottom rails. The steel tubes shall be covered with 5mm thick solid PVC sheets. Shutter using 5mm thick solid PVC sheets for panelling shall rigidly fixed and fittings. The overall size of rail, Lock rail and bottom rail shall be 75mm x 30mm. The overall size of frames shall be 50mm x 45mm, with suitable rabate for housing the shutter. a. Solid panel PVC door with frame
Supplying and fixing in position of aluminium anodised colour matt finish Louvered Ventilator. The outer frame will be 62x38x2mm @ 1.17 Kg / m and the louvers with moving arrangements will be made with Alu. Channel of size 60x30x4 mm @ 1.27 kg /m with necessary glass pans for louvers 4mm thick Al. Clips, including all materials, labour & power consumption charges required for fabrication if necessary chipping dismantling making holes in RCC columns,beamsor masonry wherever necessary with power drill to the extent required and make good to the original conditions after fixing etc., complete. The Aluminium surface is to be anodised with matt finish under electrically controlled condition in accordance with ISI specification 1868/1962 of anodic film thickness of not less than15 microns (fifteen) for all sections. All the materials should be got approved by the Site Engineer before fixing in position as directed.
Supplying and fixing M.S. grills for window and gate including one coat of primer with red lead etc. complete as directed.
Colour washing two coats over one coat of white washing
White washing three coats ( Ceiling)
Painting two coats with superior quality of ready mixed paints of chocholate colour, light green or grey colour or any other approved colour over painting with primary coat (red lead) on new iron work.
Supplying, and fixing 100mm down fall pipe including cost of 100mm AC pipe, shoe bend, bracket and teek wood plugs, grating etc. complete with door arrangments
Precast slab in Cement Concrete 1:2:4 using 12-20mm BG jelly for reinforced cement concrete works including cost of steel, centering, shuttering and cost of steel reinforcement and including laying in position, compacting, curing, finishing, etc., complete
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations & basement
SANITARY ARRANGEMENTS
Providing and fixing colour glazed European water closet with rose wood seatings (Black) low level flushing tank with fittings, etc., complete.
Providing and fixing 100 mm dia CI soil pipe
Providing and fixing 50 mm dia CI soil pipe bend without door arrangement for bathroom
Providing and fixing 100mm dia CI soil pipe bend without door arrangements
Providing and fixing 50 mm dia CI soil pipe for bathroom
Providing and fixing 15 x 10 cm SW gully trap with CI gratings in BJ concrete in CM 1:4:10 with silt pit diaphragm arrangements etc., complete.
Supplying, laying , jointing and testing 100mm dia SW pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil depositing the earth on banks with initial lead of 10m , lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23 cm thick watering, ramming to consolidation, depositing the surplus earth, etc. complete at an average depth of 2.0m.
Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 45x45cm medium weight L.S. cover and frame, etc., complete for a. 60cm x 60cm x 75cm
WATER SUPPLY ARRANGEMENTS
Supplying and fixing 55cm x 40cm colour glazed wash basin with lead and brass connections, C.P. Pillar Tap and other fittings, etc., complete
Supplying and fixing best mirror of size 60cmx45cm of 6mm thick with plywood back including necessary fittings, etc., complete
Supplying and fixing C.P towel rails 45cmx 20mm
Supplying GI pipes and specials of size 25mm dia including cutting, threading and jointing with necessary specials including carting the materials, fixing to wall with necessary clamps and screws, making holes in roof, repacking the same with necessary brickwork and plastering wherever necessary with scaffolding etc., complete
Supplying and fixing 25 mm GM Gate Valve
Supplying and fixing 20mm C.P Screw down Tap
Supply and delivery of domestic pumpset (centrifugal monobloc pumpset of capacity 100lpm and 20m head with ISI mark as per IS 9079/1989-1HP) including necessary electrical works etc., complete.
Supply and delivery and fixing of HDPE tank 1000 litres capacity as per IS 12701 / 1996 including loading, unloading, transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges as directed at site etc.,
250 mm dia CI d/f duckfoot bend
250 mm dia CI - 2.0m d/f pipe
250 mm dia CI - 1.0m d/f pipe
250 mm dia CI - 0.5m d/f pipe
250 mm dia CI d/f 90 deg bend
250 mm dia CI - 2.0m d/f pipe
250 mm dia CI - 0.5m d/f pipe
250 mm dia CI sluice valve
250 mm dia CI - 0.5m d/f pipe
250 mm dia CI non-return valve
300x250mm CI A/F tee
300 mm dia CI - 0.5m d/f pipe
300 mm dia CI sluice valve
300 mm dia CI fl/spi TP
300 mm dia Blank flange
Jointing the C.I.Double flanged pipes and specials with rubber insertion to the required specifications with M.S. bolts and nuts, complete and testing the pipies to the required pressure with water (including cost of jointing materials) For depth upto 2m,
300mm dia
250mm dia
250mm dia
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete. (For Gravity Sewers) 250mm dia pipe at 2.0m depth
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for plain cement concrete works including laying in layers of not more than 15cm thick including ramming curing, etc., complete for End concrete. 1.5m to 4.5m below GL
Providing formwork with centering for soffits of reinforced cement concrete slabs or plain surface including strutting upto 3.0m high etc complete complying with standard specifications @ 2m depth
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe for DWC PE pipes including ramming, consolidation etc., complete
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length)
Disposal of surplus earth (for DWC PE or PP pipe length)
RTK Survey for the Underground sewer system along the roads for the distance <15Km
Survey for the surface assets like SPS, LS, etc
Bill.No.30.B Strengthening of Sewer collection System in Purasaivakkam SPS
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation including timbering the trenches for depths 2.5m and above, pumping out subsoil water etc., complete.
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary/Permanent Plugging and blocking of sewer line, branch connections and diversion of flows and removal of all plugs, Hire charges for diesel pumpset for 3 HP/5HP/7.5HP with fuel and crew charges including transportation and Delivery and Suction Hose Pipe(160mm/120m).
Non Bus Route
300mm dia. & below sewer line
400 to 500mm dia sewer line
Bus Route
300mm dia. & below sewer line
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Bus Route
at 1.5m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
Non Bus Route
Brick Machine holes
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
Overpumping using diesel engine pumpset including hire charges, cost of diesel, Engine oil, Pump operator, Labour charges, other incidental charges etc and complete for pumping out the sewage from machine holes
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities
Pipe laying - 5 to 15 km
Inspection chamber
Serial No.31 Replacement of existing erroded 1200mmdia RCC pipe at various locations in Depot 78 in Area VI
Bill.No.31.A Strengthening of Sewer collection System in Perambur SPS
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
358/300mm OD/ID DWC PE or PP pipe
at 4 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
358/300mm OD/ID DWC PE or PP pipe
at 2.5 m deep
at 3 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
at 4.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths of 2.5m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
600mm dia CI pipe
at 4.5 m deep
at 5 m deep
at 5.5 m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Bus Route
Construction of Machine Holes using sulphate resistant cement at various depths to invert including earthwork excavation as per SS 20B, laying cement concrete in C.M. 1:3:6 using Crushed stone sand (M sand) and 40mm B.G.jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M. 1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M. 1:3, 20mm thick and exterior with C.M. 1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G.jelly fixing the frame, providing C.I. steps, Machine Hole cover and frame, benching and channelling including refilling the trench with excavated earth and disposal of surplus earth etc. complete for the following sizes for each Machine Hole
Non Bus Route
at 1.5m deep
Bus Route
at 1.5m deep
Construction of Precast circular RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B including timbering and pumping charges(for 2.5m depth and above),Providing Plain Cement Concrete 1:1.5:3 using 20mm B.G. jelly for foundation,supplying and filling sand for bedding, Providing base units of 1m height(base slab and sidewall),riser unit (without corbel) of varying heights to suit the various depth requirements and roof slab including cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles including material and labour cost, Providing CI steps,fixing FRC Machine Hole frame and door,benching and channelling ,refilling with excavated earth and disposal of surplus earth, joining of precast units by grouting with CM1:1 and polyurethane based water proofing compound 1% (by weight of cement ) at shear key and protruded bars- grout holes locations,Cost of conveyance and erection charges of precast Machine Holes at the required position as directed by the engineer at site including testing the Machine Hole with water for 48 hours to check water tightness and rectifying the defects if anyfor the following sizes and depths.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
at 5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.5m deep
at 5m deep
at 5.5m deep
Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 5.5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Bus Route
Road Cutting
Non Bus Route
Asphalt Road
Concrete Road
Bus Route
Asphalt Road
State Highways/ National Highways
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Non Bus Route
Bus Route
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Non Bus Route
Bus Route
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer.
Non Bus Route
For manholes of pipes upto 1200 mm dia
Bus Route
For manholes of pipes upto 1200 mm dia
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
Non Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.5m deep
at 5m deep
at 5.5m deep
Bus Route
at 1.5m deep
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 5.5m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Bus Route
Brick Machine holes
at 1.5m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.5m deep
at 4.0m deep
Non Bus Route
Brick Machine holes
at 1.5m deep
Precast circular RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 2.0m deep
at 2.5m deep
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.0m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
at 2 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 1.5 m deep
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
Non Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 2.5 m deep
at 3 m deep
at 3.5 m deep
at 4 m deep
480/400mm OD/ID DWC PE or PP pipe
at 3.5 m deep
at 4 m deep
Bus Route
295/250mm OD/ID DWC PE or PP Pipe
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4 m deep
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete For Parallel line Connection
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
The contractor must obtain the existing static GCP points from CMWSSB which shoud be considered as the control point with known coordinates X,Y and Z. Survey consultant to ensure the closing error is wtihin permissible limits while transfering the levels from the existing static GCP points and the same to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base etc < 2km
For the points Underground/ Surface Assets along the roads
For underground / surface assets along the road for the distance 5 km to 15 km
Overpumping using diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges, and other incidental charges etc and complete for pumping out the sewage from Machine holes
Using 5HP Diesel pumpset
Using 7.5HP Diesel pumpset
Bill No.31.B. Strengthening of Sewer collection system in Ekangipuram SPS commanding Areas
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete
358/300mm OD/ID DWC PE or PP pipe
at 3 m deep
at 3.5 m deep
at 4 m deep
at 4.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4 m deep
at 4.5 m deep
Supply, delivery of CI socket spigot pipes of LA class including rubber gaskets as per the latest revision of IS 1536, laying, jointing and testing CI pipes (LA class) including earth work excavation for trenches in hard stiff clay, black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and initial lift of 2m, lowering the pipes in to the trenches, aligning, making rubber joints, testing CI pipes, refilling the trenches with excavated soil, watering and ramming to consolidation, disposal of surplus earth including timbering the trenches for the depths up to 2.0m and above, pumping out sub soil water etc., complete. (For Gravity Sewers)
Non Bus Route
500mm dia CI pipe
at 4.5m deep
at 5m deep
600mm dia CI pipe
at 6m deep
Cement concrete 1:3:6 using Crushed stone sand (M-sand) and 40mm gauge hard broken stone jelly & SRC for Plain cement concrete works including laying in layers of not more than 15cm thick,compacting, curing etc complete for encasing and end concrete.
Non Bus Route
Construction of RCC Machine Holes using sulphate resistant cement with M30 design mix concrete using Crushed stone sand (M sand) including earthwork excavation as per SS20B , providing point edge to well kerb using ISA 150x75x10mm weighing at 16.9kg/m,sinking well kerb below 2m from G.L.or by open excavation for various depth as per site condition with M30 mix for side wall, raft and roof slab,including cost of steel reinforcement ,including bailing and pumping out water, formwork, plugging the bottom with PCC 1:3:6 using 40mm hard broken granite jelly, laying plain cement concrete 1:3:6 using 12mm to 20mm hard broken granite jelly for fixing frame, fixing FRC Machine Hole cover and frame, providing CI steps, ,benching and channelling including refilling the trenches with excavated earth and disposal of earth etc. Including testing the Machine Hole with water for 48hours to check water tightness and rectifying the defects if any complete for the following size of Machine Holes.
Non Bus Route
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.5m deep
at 5m deep
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Providing Iron Barricading of size 2.50 m width and 1.75 m height using 40x40x4 mm angle for outer frame supports, 25 x 25 x 3 mm angle for inner frame supports and 20 gauge thickness MS sheet for name board (as per drawing) including cutting, welding, fabrication charges and one coat of primer and 2 coats of enamel paint of approved quality, writing "METRO WATER" & work detail/ caution sign, providing necessary interlocking arrangements with adjoining units, fixing danger flags, danger lights, reflectors, fixing stickers etc, including watching during night and placing the barricading units as directed at the sites.
Non Bus Route
Road Cutting using braker
Non Bus Route
Asphalt Road
Concrete Road
Cutting DWC Pipes
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Non Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Supplying and filling with stone dust for bedding for a thickness of 10cm and back fill envelope for a thickness of 150mm above the crown of the pipe, including ramming, consolidation etc., complete.
Non Bus Route
Bedding
Backfill Envelope (Sidefill)
Refilling with excavated soils (other than sand) complying with standard specifications for filling in foundations and basement.(for DWC PE or PP pipe length).
Non Bus Route
Disposal of surplus earth (for DWC PE or PP pipe length)
Non Bus Route
Making through holes in plain or reinforced cement concrete with diamond core drilling system by using BOSCH power tools of following diameters - depth per cm
Providing form work with centering for soffits of reinforced cement concrete slabs or plain surfaces including shuttering for
For end concrete
Construction of precast anchor block using machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade with Sulphate resistant cement for reinforced cement concrete structural elements under controlled water cement ratio with plasticiser using 20mm and down graded machine broken granite stone jelly including curing, the cost of steel reinforcement, cost of fabricating the steel mould using MS sheet and ISA angles with material and labour cost, conveyance and erection charges at the required position as directed by the Board Engineer at site.
Dismantling of manhole including R.C.C. top slab, C.I. cover with frame including stacking of useful material including bricks duly cleaned from mortar near the site and disposal of unserviceable materials into railway dumps within 50m lead including all excavation, refilling watering and ramming etc. complete
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
at 4.5m deep
at 5m deep
Supplying and filling Crushed stone sand (M-sand) for foundations and basement including watering consolidating ramming, etc., complete for Permanent plugging of Machinehole
Cast-Insitu RCC Machine Holes
1200mm dia Circular Machine Hole for Sewers (upto 450mm dia)
at 3.0m deep
at 3.5m deep
at 4.0m deep
at 4.5m deep
1500mm dia Circular Machine Hole for Sewers (500mm dia & above)
Supply, delivery, laying and jointing of Double wall corrugated /structured wall plastic polyethylene/polypropylene pipes DWC PE or PP of class SN-8 with non-smooth external Annular Corrugated and Smooth Internal Surfaces in Standard lengths with online coupler and spigot type confirming to IS 16098 (Part-2) 2013 / EN: 13476-3 (latest revision) including elastomeric sealing ring gasket suitable for DWC PE or PP pipes conforming to IS: 5382 (latest revision), freight,insurance, loading into the truck and transporting to the stores / site.. etc including earth work excavation in hard stiff clay,stiff black cotton,hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m and lowering into trenches, aligning and testing of DWC PE or PP pipes, watering and ramming to consolidation, etc., complete For Connection of existing conduit with replaced conduit in case of Parallel laying
358/300mm OD/ID DWC PE or PP pipe
at 3.5 m deep
480/400mm OD/ID DWC PE or PP pipe
at 4 m deep
at 4.5 m deep
Overpumping using Diesel engine pumpset including Hire charges, cost of diesel, engine oil, pump operator, labour charges and other incidental charges etc and complete for pumping out the sewage from Machine holes
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone44N). The final base map with assets and utilities
Pipe laying - 5 - 15 Km
Inspection chamber
Bill No.31.C. Strengthening of Sewer collection system in KP SPS commanding Areas
Supplying and fixing 150mm dia MS Ventilating columns 6.0m length with CI Base for Ventilating column, Wire Cowl, Supplying, Laying, Jointing and Testing of 150mm dia stoneware pipe to a length of 6m for each column with 100mm SW stopper including cost of joining materials such as cement, sand and spun yarn with necessary civil works for construction of Masonry Pillars, earthwork excavation, refilling etc., complete.
Non Bus Route
Bus Route
Providing House service connection: Supplying, laying jointing and testing UPVC pipe including earthwork excavation for trenches in hard stiff clay, stiff black cotton, hard red earth, shales, murams, gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil, depositing the earth on banks with initial lead of 10m. lowering the pipes into the trenches, aligning, refilling the trenches with excavated earth in layers of not more than 23cm thick watering, ramming to consolidation and disposal of surplus earth etc., complete
Bus Route
110mm dia upto a depth of 1.0m
160mm dia upto a depth of 1.5m
Inspection Chamber : Construction of inspection chambers of following sizes with earth work excavation for foundation, 23cm thick concrete bed using 40mm brick jelly concrete in C.M. 1:4:10 for foundation, brick work in C.M. 1:6 for chamber, plastering with C.M. 1:3,12mm thick, benching, channelling, supplying and fixing 60x60cm medium weight L.S. cover and frame, etc., complete for
Overpumping using diesel engine pumpset including hire charges, cost of diesel, Engine oil, Pump operator, Labour charges, other incidental charges etc and complete for pumping out the sewage from machine holes
The Contractor must obtain the existing Static GCP points from CMWSSB which should beC onsidered as the control point with known coordinates X, Y and Z. Survey consultant to ensure the closing error is within permissible limits (SoI Standards) while transferring the levels from the existing Static GCP points and the to be presented as a report. The same process shall be adopted for random verification of positional accuracy of points established using the PBMs as base. As built survey for every sewage and water pipeline and other assets must be done using DGPS based RTK method by transferring the coordinates from the nearest Static GCP of CMWSSB. Where there are signal interruptions for the RTK method, Total Station can be used. The coordinates from the static GCP shall be transferred to the Total Station by RTK method and the co- ordinates of the assets can then be captured by Total Station. All the features, attributes of all the assets, utilities captured shall be Geo referenced as per standard Coordinate reference system (WGS 84 UTM Zone 44N). The final base map with assets and utilities
Inspection chamber
Sub Total (excluding GST)
AYYAPPA INFRA PROJECTS PRIVATE LIMITED (BID ID -1178775)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid