Chief General Manager (P), Gujarat Water Infrastructure Limited
Comprehensive Operation, Maintenance and Repair of the entire Electro-Mechanical Installations under NC-28, SPP-3A, SPP-3B, SPP-3, SPP-3 (Voltas) and SPP-4 Projects, comprising all Electrical Equipment, Electrical Sub-station, Mechanical Equipment and Instrumentation/SCADA Systems along with all associated accessories installed at Navda Pumping Station, including Civil Structures like Pump House and Sump, execution of required civil and electrical scheme strengthening works, including proper supply of water as per demand and maintaining complete and accurate records of all operation and maintenance activities, for a total period of 60 months under NC-28, SPP-3A, SPP-3B, SPP-3, SPP-3 (Voltas) and SPP-4 Projects at Navda Pumping Station, Dist: Botad.
264384
1/2026
Open
Water Supply/ Sanitation Works
Works
Gandhinagar
3 documents required · 3 mandatory
₹18,000
Chief General Manager (P), Gujarat Water Infrastructure Limited
₹17.7 L
13 Jan 2026
13 Jan 2026
13 Jan 2026
16 Feb 2026
13 Jan 2026
Estimated Cost: Rs.
DETAILED SPECIFICATIONS FOR SCHEDULE C
Chief General Manager (Project)
Gujarat Water Infrastructure Limited
1st floor Block – 1, Jivraj Mehta Bhavan, Sector-10 Gandhinagar,
Detailed Specifications for Schedule C
Name of Work ::
Comprehensive Operation, Maintenance and Repair of the entire Electro-Mechanical
Installations under NC-28, SPP-3A, SPP-3B, SPP-3, SPP-3 (Voltas) and SPP-4 Projects,
comprising all Electrical Equipment, Electrical Sub-station, Mechanical Equipment
and Instrumentation/SCADA Systems along with all associated accessories installed
at Navda Pumping Station, including Civil Structures like Pump House and Sump,
execution of required civil and electrical scheme strengthening works, including
proper supply of water as per demand and maintaining complete and accurate
records of all operation and maintenance activities, for a total period of 60 months
under NC-28, SPP-3A, SPP-3B, SPP-3, SPP-3 (Voltas) and SPP-4 Projects at Navda
Pumping Station, Dist: Botad.
SECTION:2 SURVEY & GEOTECHNICAL INVESTIGATION FOR DESIGN ...................
SECTION – 5 STRUCTURAL STEEL WORK ....................................................
SECTION -6 WATER SUPPLY AND SANITARY WORKS ....................................
SECTION 8 : ITEMWISE SPECIFICATIONS ...................................................
SECTION: 1 GENERAL AND MATERIAL
GENERAL AND MATERIAL
1.0 Employer’s Drawings:
The drawings listed in the Tender document are the Employer’s conceptual drawings and
are to be got approved prior to start of the works with actual site conditions & level in
consultation with EIC.
2.0 Drawing Sheet Format:
➢ All drawings provided by the Contractor shall be on standard size sheets, prepared on
computer with AutoCAD and shall show the following particulars in a title block located
in the lower right hand corner, in addition to the name of Contractor and equipment
manufacturer, date, scale, drawing number, revision number (R0 for drawings submitted
initially, R1, R2, etc. for drawings submitted subsequently) and title.
➢ Senior Manager ……,GWIL
➢ Project name: -
➢ A blank space of 90 mm x 100 mm shall be provided for the Engineer’s approval stamp
and provision shall be made for details of revisions to be recorded.
➢ All drawings submitted by the Tenderer/Contractor shall use the English language and
SI units. All drawings shall be clearly and fully cross-referenced to the other drawings as
3.0 Tender / Contract Drawings:
➢ Drawings submitted by the Tenderer shall show all the essential items of the Plant offered
together with sufficient details to enable the general arrangement of the Plant to be
➢ The drawings and documents to be provided by the Tenderer / Contractor shall be as
per the schedules of price but shall not be limited to those listed:
4.0 Submissions and Approval of Drawings:
➢ The following shall be the procedure for submission and approval of drawings:
➢ The Contractor shall submit minimum 6 copies of the drawings to the Employer. All the
drawings are to be signed by the Contractor or his authorized representatives.
➢ The Engineer’s Representative will review the drawings and, if found fit for approval,
the Employer will return 2 copies to the Contractor duly approved.
➢ In case the drawings/documents are not fit for approval but worth for review, the
Engineer’s Representative will mark the comments on the drawings and return 2 copies
to the Contractor. In such case, the Contractor shall resubmit the revised drawings
within two weeks as per above and the same shall be repeated till the drawings are
finally approved as per sub-clause above.
➢ If the submitted drawings/documents are not worth for review, the Contractor will be
informed accordingly.
➢ On receipt of the approved drawings as per sub-clause above, the Contractor shall
submit CD/Pen-Drive, Soft Copy and documents to the employer as and when
➢ After tests on completion, the Contractor shall submit, within 15 days of the conclusion
of the tests, CDs/Pen-Drive, Soft Copy, Hard Copy of the “As Built Drawings” to the
➢ When the drawings are received by the Engineer’s Representative after revision by the
Contractor, he will only review the revision made and hence the Contractor shall
carefully identify all the revised details / dimensions and also describe the revisions in
the revision block.
➢ No drawings, with corrections made after taking the prints, will be accepted.
➢ Approval of drawings by the Engineer shall not relieve the Contractor of his
responsibility in terms of the Contract.
5.0 Delivery, Unloading and Storing at Site:
➢ The Contractor shall be responsible for checking all materials delivered to Site and shall
keep the Engineer’s Representative fully informed of the state of deliveries. The
Contractor shall carry out, at his cost, all instructions of Engineer or his Representative
for proper unloading, preservation, maintenance, storage and security of materials
delivered to Site until he fulfills all his obligations under the Contract.
➢ The Contractor shall erect and maintain on the Site any temporary storage facility as
required and approved by the Engineer.
➢ Multiple handling and movement of materials during storage and retrieval shall be
6.0 Spare Parts:
➢ Spare Parts required after the taking over the Plant shall be filled up by the bidder in
➢ Spares during pre-commissioning trials, commissioning tests/maintenance, guarantee
etc. shall be provided by the Contractor. The necessary spares shall be brought by the
Contractor prior to the pre-commissioning test so as to avoid the downtime of equipment
due to non-availability of them. All these spares have to be provided as required, by
Contractor free of cost.
➢ All spare parts shall be new, unused and strictly interchangeable with the parts for which
they are intended to be replacements and shall be treated and packed for long storage
under the climatic conditions prevailing at the site. Each spare part shall be clearly
marked or labeled on the outside of its packing with its description, number and
purpose. When more than one spare is packed in a single case or other container, a
general description of its contents shall be shown on the outside of such case or
container and a detailed list enclosed. All cases, containers and other packages shall be
marked and numbered in an approved manner for the purpose of identification. Spares
shall be delivered to Site after the completion of erection but before start of
commissioning of Plant along with technical leaflets and details. Spare parts shall be
indicated in the assembly drawing showing clearly the part numbers.
➢ All cases, containers or other packages are liable to be opened for such examination as
the Engineer’s Representative may require and packing shall be designed to facilitate
opening and thereafter re-packing. In the event of some specific spares offered in the
Contract being withdrawn from manufacture owing to changes in design of equipment
or similar reasons viz., model being obsolete etc., the Contractor shall inform the
Employer before such withdrawal so that the Employer can take timely alternative steps.
➢ Tools shall be delivered to site just prior to Tests on Completion.
➢ The specified tools shall not be used for the erection of the Plant being supplied and
except that the Engineer may call upon the Contractor to demonstrate their use or
effectiveness, they must be handed over to the Employer in a completely new and unused
condition. Should the Contractor require any such tools at site for erection, he shall
provide his own.
➢ The test equipment shall include special purpose items essential to the testing or re-
calibration of related items of Facilities.
MATERIALS AND WORKMANSHIP:
1.0 Introduction:
➢ This part of the Specification sets out the general standards of materials to be supplied
and the workmanship required to be ensured by the Contractor. All component parts of
the works shall, unless otherwise specified, comply with the provisions of employer’s
requirement or be subject to the approval of the Employer.
➢ Particular attention shall be paid to a neat, orderly and well-arranged installation carried
out in a methodical competent manner.
2.0 Reference Specifications and Standards:
➢ Where reference is made in the Specification to a British Standard Specification
(hereinafter abbreviated to `B.S’) issued by the British Standards Institution of 2, Park
street, London W.I., or to an Indian Standard Specification (I.S.) issued by the Bureau of
Indian Standards, (earlier known as Indian Standard Institution), Manak Bhavan, 9 Bahadur
shah Zafar Marg, New Delhi 110 002, or American Society for Testing and materials (ASTM)
issued by ASTM 1916 Race Street, Philadelphia, P.A., 19103, U.S.A. or American national
Standards Institute (ANSI) issued by ANSI 1430, Broadway, New York, N.Y., 10018, U.S.A.
or Japanese Industrial Standards (JIS) issued by Japanese Standards Association, 4-1-24,
Alaska, Minato-Ku, Tokyo 107, Japan or to any other equivalent Standard it shall be to the
latest revision of that Standard on the Tender opening date.
➢ The Contractor may propose at no extra cost to the Employer, the use of any relevant
authoritative internationally recognized Reference Standard.
➢ All details, materials and utensils supplied and workmanship performed shall comply with
the specified Standards. If Tenderer offers equipment to other Standards, the
equipment/material should be equal or superior to those specified and full details of the
difference shall be supplied.
➢ In the event of conflict between this Specification and the Codes for equipment, provisions
of this Specification shall govern. Certain specifications issued by national or other widely
recognized bodies are referred to in this Specification. In referring to the Standard
Specifications the following abbreviations are used:
IS: Indian Standard
ANSI: American National Standards Institute
API: American Petroleum Institute
ASME: American Society of Mechanical Engineers
ASTM: American Society of Testing and Materials
AWS: American Welding Society
AWWA: American Water Works Association
ISO: International Organization for Standardization
DIN: Deutsches Institute fur Normung
BS: British Standard
IEC: International Electro technical Commission
IEE: Institution of Electrical Engineers
IEEE: Institute of Electrical and Electronic Engineers
NEMA: National Electrical Manufacturers Association
AGMA: American Gear Manufacturer’s Association
3.0 Materials – General:
➢ All materials incorporated in the Works shall be the most suitable for the duty concerned
and shall be new and of reputed make/approved quality, free from imperfections and
selected for long life and minimum maintenance. Non-destructive tests, if called for in
the specification, shall be carried out. All submerged moving parts of the Plant, or shafts
and spindles or faces etc. in contact with them shall be of corrosion resistant materials.
All parts in direct contact with various chemicals, shall be completely resistant to
corrosion, or abrasion by these chemicals, and shall maintain their properties without
aging due to the passages of time, exposure to light or any other cause.
4.0 Workmanship – General:
➢ Workmanship and general finish shall be of first-class quality and in accordance with
best workshop practice.
➢ All similar items of the Plant and their component parts shall be completely
interchangeable. Spare parts shall be manufactured from the same materials as the
originals and shall fit all similar items.
➢ All parts, which can be worn or damaged by dust, shall be totally enclosed in dust proof
housings. All materials incorporated in the Works shall be the most suitable for the duty
concerned, free from imperfections and selected for long life and minimum
maintenance. All necessary accessories required for satisfactory and safe operation of
the Plant shall be supplied by the Contractor unless it is specifically excluded from his
scope. Suitable provision by means of eyebolts or other means are to be provided to
facilitate handling of all items that are too heavy or bulky for lifting and carrying by two
➢ Welding shall comply with the latest revision of the BS 5135 Code.
➢ Welders shall be qualified in accordance with the requirement of the appropriate section
of BS 4871. The Engineer shall have the right to call for further qualification from time to
time from any welder who in the opinion of the Engineer does not produce weld in
accordance with the qualification. Each welder shall be assigned a number and letter.
Each welding elements shall clearly be identified as to its welder marking the welder’s
Code adjacent to the welds. A record chart shall be maintained for each welder showing
the procedures, for which he has qualified, the date of such qualification, the type of
defects produced and their frequency. The Engineer shall disqualify the welder whose
Work requires a disproportionate amount of repairs. All procedures where required shall
be qualified as per BS EN 283-3.
➢ Inspection and quality of surveillance shall not be limited to the examination of finished
welds. The techniques employed shall be based on methods which are known to produce
good results and which have been verified at Site by actual demonstration.
➢ Haphazard striking of the electrodes for establishing an arc shall not be permitted. The
arc shall be struck either on the joint or on a starting tag. The starting tag shall be of the
same material or a material compatible with the base metal being welded. In case of any
inadvertent strike on place other than the welding, the area affected shall be ground
flushed and examined by liquid penetration method.
➢ Generally, a stringer bead technique shall be used with a slight oscillation of necessary
to avoid slag and to minimize the number of beads needed to fill exceed 3 times the wire
diameter. Vertical welds shall be made in upward direction. For all pipes above 300 mm
dia., welding shall be done whenever possible, by 2 welders working simultaneously along
both sides of the pipe.
➢ The root pass shall have less than 1.5 mm internal reinforcement. Defects like icicles,
burn through and excessive “such back”, etc. shall be cause for rejection of welds.
➢ Final welds shall be suitable for appropriate fabrication of the non-destructive
examination of the weld. If grinding is necessary, the weld shall be blended into the
parent metal without gouging or thinning of the parent metal in any way. Uneven and
excessive grinding may be a cause for rejection. Fillet weld shall preferably be convex
and free from undercutting and overlap at the toe of weld. Convexity and concavity shall
not exceed 1.5 mm. The leg lengths shall not exceed the specified size by more than
➢ All attachments such as lugs, brackets and other non-pressure parts shall also be done by
qualified welders in accordance with the design details and materials specifications.
Temporary attachments shall be removed in a manner that will not damage the parent
metal. Areas of temporary attachments shall be dressed smooth and examined by
ultrasonic or liquid penetration methods.
➢ All tack welds shall be made using qualified procedure and welders, the number of sizes
of tack welds shall be kept as small as to consist of adequate strength and joint
alignments. All tack welds shall be examined visually for defects and if found defective
shall be completely removed. As welding proceeds, tack welds shall be either removed
completely or shall be properly prepared by grinding or filling their starting ends so that
they may be satisfactorily incorporated in the welds. Unacceptable defects shall be
removed by grinding machine or chipping or gouge. Flame gouging may be permitted
provided gouged surfaces are ground at least by 1.0 mm below the deepest indentation.
➢ All weld repairs shall be carried out using the approved welding procedures and welders.
Re-welded areas shall be re-examined by the methods specified for the original welds and
the Engineer’s Representative shall duly qualify repair procedures.
6.0 Pre-heating and Post-Heating Treatment:
➢ Pre-heating and post heating treatment shall conform to the relevant application Codes.
Pre-heating not exceeding 121 deg. C for all carbon steel construction above 25 mm
thickness would be mandatory. Such pre-heating would be maintained during flame
cutting, flame or arc gouging, welding and repairs and may be done by gas heating by
gas torches/gas rings with neutral flame. The temperature shall be checked by
temperature indicating crayons. However, such pre-heating will not be necessary for
welds less than 6 mm size. In large diameter pipe fabricated out of plate materials,
production control test plates in accordance with the BS 4870-part 1 Table 6 to represent
30% of the long seams and each welder’s performance would be mandatory.
7.0 Electrodes:
➢ All electrodes shall be stored in their original sealed containers under dry conditions.
Electrodes shall remain identified until consumed. All electrodes shall be dried before
use. Drying ovens shall be provided in Work areas for drying purposes. Electrodes
withdrawn from oven shall be promptly used and excess unused electrodes shall be
promptly returned to oven.
8.0 Examination/NDT/Radiography
➢ The various stages of examination and types shall be as stipulated in the respective
fabrication Codes. Radiographic examination shall be carried out as per provisions of BS
2600 or BS 2910; Ultrasonic tests where called for shall be carried out as per provisions
of BS 3926; magnetic particle tests shall be carried out as per BS 6072. Liquid
penetration tests shall be carried out as per BS
9.0 Stainless Steel Welding:
➢ All welding consumable such as electrodes, filler weirs, argon gas for shielding and
purging shall be of high quality and the proposed brand shall be furnished for approval
of the Engineer. Weld deposits shall have similar or higher physical properties and similar
chemical composition to the members joined.
➢ All electrodes shall be purchased in sealed containers only and stored in their packing
intact. The packets opened shall be consumed as early as possible. The electrodes
removed from the containers shall be kept in holding ovens at temperatures
recommended by electrode manufacturer. Special care shall be taken in avoiding mixing
of electrodes in the oven. The electrodes and filling wires shall be free from rust, oil,
grease, earth and other foreign matter.
➢ Argon gas with purity 99.5% shall be used for shielding and purging. The purity of gas
shall be certified by the gas manufacturers.
➢ Non-destructive examination of the welds shall be carried out to ensure quality of weld.
➢ The electric current for welding shall be direct current, straight polarity (electrode
negative). The welding current shall be kept minimum possible to ensure minimum heat
affected zone in the parent material. Other side of the weld joint shall be periodically
flushed with argon gas.
➢ Cast iron shall be of standard grey close-grained quality. The structure of the castings
shall be homogeneous and free from non-metallic inclusions and other injurious defects.
All surfaces of castings, which are not machined, shall be smooth and shall be carefully
fettled to remove all foundry irregularities.
➢ Minor defects in depth not exceeding 12.5 percent of total metal thickness and which
will not ultimately affect the strength and serviceability of the casting may be repaired
by approved welding techniques. The Engineer shall be notified of large defects and no
repair welding of such defects shall be carried out without prior approval of the
Engineer. If the removal of metal for repair should reduce the stress resisting cross
section of the casting by more than 25 percent, or to such an extent that the computed
stress in the remaining metal exceeds the allowable stress by more than 25 percent,
then casting shall be rejected. Test coupons cast simultaneously with the main castings
shall be identified to check physical, chemical analysis of casting. Major defects on
casting are not acceptable. Castings repaired by welding for minor defects shall be
stress-relieved after such welding. Non-destructive tests as directed by the Engineer will
be required for any casting containing defects whose extent cannot otherwise be judged,
or to determine where repair welds have been properly made.
➢ All major stress-bearing forging shall be made to a Standard Specification. Forging shall
be subjected to magnetic particle testing or dye penetration test at the areas of fillets
and change in section. The testing shall be conducted after rough machining (10
microns). Any defect, which will not machine out during the final machining, will be
gouged out fully, inspected by dye penetration or magnetic particle inspection to ensure
that the defect is fully removed and repaired using an approved repair procedure. Any
indication, which proves to penetrate deeper than 2.5% of the finished thickness of the
component, shall be reported to the Engineer giving the details like location, length,
width and depth. For the magnetic particle inspection, the choice of wet or dry particles
shall be at the Contractor’s discretion.
➢ All forging shall be demagnetized after test and shall be heat-treated for the relief of
residual stresses.
12.0 Design Life:
➢ The Works as a whole shall be new, of sound workmanship, robustly designed for a long
reliable operating life and shall be capable of 24 hours per day continuous operation for
prolonged period in the climatic and working conditions prevailing at the site, and with
the minimum of maintenance. Particular attention shall be given to temperature
changes, the stability of paint finish for high temperatures, the rating of engines,
electrical machinery, thermal overload services, cooling systems and the choice of
lubricants for possible high and prolonged operating temperatures. The Contractor shall
be called upon to demonstrate this for any component part either by service records, or
evidence of similar equipment already installed elsewhere or relevant type tests.
Routine maintenance and repair shall as far as possible not requires the services of highly
skilled personnel.
➢ The Plant shall be designed to provide easy access to and replacement of component
parts, which are subject to wear, without the need to replace whole units. No parts in
contact with water shall have a life from new to replacement or repair of less than five
➢ Design features shall include the protection of Plant against damage caused by vermin,
dirt, dust and dampness and to reduce risk of fire. Plant shall operate without undue
vibration, and parts shall be designed to withstand the maximum stresses under the
most severe condition of normal service. Materials shall have a high resistance to change
in their properties due to the passage of time, exposure to light, temperature and any
other cause, which may have a detrimental effect upon the performance or life of the
➢ Plant located outside lockable areas/building shall have additional features to prevent
un-authorized operation.
➢ Design shall be carried out as per following:
RCC footings: Limit state method of design
RCC columns: Limit state method of design
RCC beams and slabs: Limit state method of design
Retaining wall: Limit state method of design with limiting crack width of 0.2mm as per IS
Also provide the seismic design calculation of RCC Water retaining structures as per
IS:1893 (Part – II, Draft Code).
Steel Structures: Limit state/Working Stress method of design.
RCC water retaining structure shall be designed as per Working Stress Method as per IS :
Seismic Zone for Civil Structures as per IS 1893 :
RCC structures shall be designed as per IS 456 and reinforcement details shall be done as
per IS : 13920 (Ductile detailing).
➢ Foundation shall be designed to carry all the loads from equipment or super structure,
which they support in accordance with the relevant codes.
Net safe bearing capacity of soil & Ground water table: As per geo-technical report
Type of foundation.
For buildings and structures: As per geo-technical report
Allowable increase in soil bearing capacity in event of storm(wind) 25%, Earthquake
25%,factor of safety as per IS 1904 against overturning 1.5, Sliding 1.5, and buoyancy 1.2.
As a general rule following features will be adopted, unless decided otherwise in a
specific or exceptional case:
Top of footing will be horizontal and flat/Trapezoidal as case.
Minimum depth of foundation is considered as per latest geotechnical report for various
locations of the proposed structure.
Foundation plinth for structural columns and equipment supports shall extend not less
than 5 mm from the edge of base plate.
The clear distance between a standard mild-steel anchor bolt or anchor sleeve and the
face of the foundation shall be not less than 75 mm.
Minimum thickness of lean concrete layer shall be 100 mm for building and 150 mm for
retaining structure, also extend 75 mm beyond the foundation edge.
For heavier loads and restricted settlements pile foundation may be considered as an
alternative as per IS
Wherever columns are very near pedestals of footing are considered combined to take
unbalance loading. Sufficient reinforcement is provided to take care of unbalancing load.
Centre of footing and combined loading is match to nullify eccentricity in load.
Where stresses due to wind (or seismic) and temperature are combined with those due
to other loads, the allowable stresses in concrete and reinforcement steel shall be
increased by 33.33% in case of working stress design. However steels having definite yield
stress, stress limited to yield stress, for steels without definite yield point, the stress will
be limited to 80 percentage of ultimate strength or 0.2 percent proof stress whichever is
All building shall have a minimum 1.0 m wide, 100 mm thick plinth protection paving in
grade concrete or stone slabs/tiles. All plinth protection shall be supported on well
compacted strata.
HFL of nearby dam & NGL shall be checked before finalizing the uplift pressure.
Contractor shall take HFL data from concerned authority & FGL shall be considered as
1.0 mt. above HFL.
If the compound wall is in contact with HFL/ FSL/ permanent water logged area than
RCC compound wall shall be designed as Retaining wall.
➢ All underground or partly underground liquid containing structures shall be designed for
the following conditions:
Liquid depth to be considered up to full height of wall and no relief due to soil pressure
from the other side to be considered.
i. RCC water retaining structures like storage tanks shall be leak proof and designed by
working stress method. (Stress in steel limited to 130 N/mm2) or limit state method with
limiting crack width 0.1 mm.
ii. Structure empty condition (i.e., empty of liquid, any material, etc.) : full earth
with saturation and surcharge pressure wherever applicable, to be considered.
iii. Partition wall between dry sump and wet sump: to be designed for full liquid depth up
full height of wall.
iv. Partition wall between two compartments: to be designed as one compartment empty
and the other full for both the directions.
v. Structures shall be designed for uplift in empty conditions with no live load with the
water table as per Geotechnical report or high flood level or rock level, whichever is
maximum. If uplift pressure is more than 2000 Kg/m2, use of pressure relief valves to
reduce uplift pressure due to ground water table shall be allowed. In this case
minimum thickness of raft shall with provision of under drainage arrangement (as per IS
4558) be kept as per below para viii.
vi. Walls shall be designed under operating conditions to resist earthquake forces from
earth pressure mobilization and dynamic water loads.
vii. Underground or partially underground structures shall also be checked against stresses
developed due to any combination of full and empty compartments with appropriate
ground/uplift pressures from below to base slab. A minimum factor of 1.2 shall be ensured
against uplift or floatation and due to other loads shall be 1.5.
➢ The minimum clear cover to reinforcement in all R.C.C structures shall be as per IS:
456/IS: 3370 (Part –II), except as mentioned for following:
1. The following minimum clear cover shall be provided for RCC (non-Water retaining)
Slab (roof & floors, Canopies, Chajjas, lintels, waist slab in stair etc.) 25 mm
Plinth beams 40 mm
Columns, pedestals 40 mm
Dry pits / retaining walls
2. Face in contact with earth 50 mm
3. Free face 50 mm
RCC Water / Liquid retaining structures
4. Face in contact with liquid 50 mm
5. Away from liquid but in contact with earth 50 mm
RCC Foundation
6. Sides and top 50 mm
7. Bottom 60 mm
13.0 Name Plate:
➢ Each item of the Plant shall have permanently attached to it in a conspicuous position,
a nameplate and rating plate. Upon these shall be engraved or stamped, the
manufacturer’s name, type and serial number of Plant, details of the loading and duty
at which the item of Plant has been designed to operate, and such diagrams as may be
required by the Engineer. All indicating and operating devices shall have securely
attached to them or marked upon them designations as to their function and proper
➢ Nameplates, rating plates and labels shall be of a non-flame propagating material, either
non-hygroscopic or transparent plastic with engraved lettering of a contrasting colour.
Fixing shall be by means of non-corrosive screws; drive rivets or adhesives shall not be
➢ Warning labels shall be provided where necessary to warn of dangerous circumstances
or substances. Inscriptions or graphic symbols shall be black on a yellow background
circumstances or substances. Inscriptions or graphic symbols shall be black on a yellow
➢ Instruction labels shall be provided where safety procedures such as wearing of
protective clothing are essential to protect personnel from hazardous or potentially
hazardous conditions. These labels shall have inscriptions or graphic symbols in white on
a blue background.
14.0 Nuts, Bolts, Studs and Washers:
➢ Nuts, bolts, studs and washers for incorporation in the Plant shall conform to the
requirements of the appropriate standard. Nuts and bolts shall be of the best quality of
specified grade, machined on the shank and under the head and nut.
➢ Fitted bolts shall be a light driving fit in the reamed holes they occupy, shall have the
screwed portion of such a diameter that it will not be damaged in driving and shall be
marked in a conspicuous position to ensure correct assembly at Site.
➢ Washers, locking devices and anti-vibration arrangements shall be provided where
necessary Jointing hardware for the entire Plant shall be provided with sufficient spares
to cater for site losses.
➢ Where bolts pass through structural members taper washers shall be fitted, where
necessary, to ensure that no bending stress is caused in the bolt. Where there is a risk
of corrosion, bolts, nuts and studs shall be designed so that the maximum stress does
not exceed half the yield stress of the material under any conditions. All bolts, nuts and
washers that are subject to frequent adjustment or removal in the course of
maintenance and repair shall be made of nickel-bearing stainless steel.
➢ The Contractor shall supply all holding down, alignment and leveling bolts complete with
anchorages, nuts, washers and packing required to attach the Plant to its foundations,
and all bed plates, frames and other structural parts necessary to spread the loads
transmitted by the Plant to concrete foundations without exceeding the design stresses.
15.0 Allowances for Wastage:
➢ The Contractor shall supply reasonable excess quantities to cover wastage of those
consumable, which will be normally subject to waste during erection, commissioning
and setting to Work.
16.0 Painting – General:
➢ The Contractor shall be responsible for the cleaning, preparation for painting, and
priming or otherwise protecting, as specified, all parts of the Plant at the place of
manufacture prior to packing.
➢ Parts may be cleaned but surface defects may not be filled in before testing at the
manufacturer’s works. Parts subject to hydraulic test shall be tested before any surface
treatment. After test, all surfaces shall be thoroughly cleaned and dried out, if
necessary by washing with an approved de-watering fluid prior to surface treatment.
Except where the specification provides to the contrary all painting materials shall be
applied in strict accordance with the paint manufacturer’s instructions.
➢ All protective coatings shall be suitable for use in warm humid climates. All primers,
under coats and finishes shall be applied by brush or airless spray, except where
otherwise specified. Consecutive coats shall be in distinct but appropriate shades. All
paints shall be supplied from the store to the painters, ready for application, and
addition of thinners or any other material shall be prohibited.
17.0 Painting at Place of Manufacture:
➢ Steel and cast-iron parts shall be sand blasted to near white cleaning before painting.
Edges, sharp covers etc. shall be ground to a curve before sand blasting. A primer coat
of a zinc rich epoxy resin-based coating with at least 75 microns’ dry film thickness is to
be provided. In addition, the parts are to be provided with adequate number of coats of
coal tar epoxy polyamine coating to a dry film thickness of 175 microns including primer
18.0 Painting at Site:
➢ Immediately on arrival at the site, all items of Plant shall be examined for damage to
the paint coat applied at the manufacturer’s works, and any damaged portions shall be
cleaned down to the bare metal, all rust removed, and the paint coat made good with
➢ After erection, such items, which are not finish painted, shall be done so and, items
that have been finish painted at the manufacturer’s works shall be touched up for any
damaged paintwork. For finish painting, two coats of synthetic enamel conforming to
IS: 2932 shall be applied. Dry film thickness of each coat shall be at least 25 microns.
➢ The dry paint film thickness shall be measured by Electrometer or other instruments
approved by the Employer. In order to obtain the dry film thickness specified the
Contractor should ensure that the coverage rate given by the paint manufacturer would
enable this thickness to be obtained. Strength of adhesion shall be measured with an
adhesion tester and this value shall not be less than 10 kg/cm2. Painted fabricated steel
work which is to be stored prior to erection shall be kept clear of the ground and shall
be laid out or stacked in an orderly manner that will ensure that no water or dirt can
accumulate on the surface. Suitable packing shall be laid between the stacked
materials. Where cover is provided, it shall be ventilated.
19.0 Galvanizing:
➢ Wherever galvanizing has been specified the hot dip process shall be used. The
galvanized coating shall be of uniform thickness. Weight of zinc coatings for various
applications shall not be less than those indicated below:
a) Fabricated steel :
Thickness less than 2 mm but not less than 1.2 mm - 340 gms/sq.m
Thickness 2 mm and above - 460 gms/sq.m
Up to nominal size M10 - 270 gms/sq.m
Over M10 - 300 gms/sq.m
➢ Galvanizing shall be carried out after all drilling; punching, cutting, bending and welding
operations have been carried out. Burrs shall be removed before galvanizing. Any Site
modification of galvanized parts should be covered well by zinc rich primer and
aluminum paint.
20.0 Support for Pipe work & Valves:
➢ All necessary supports, saddles, sling, fixing bolts & foundation bolts shall be supplied
to support the pipe work. Valve and other facilities mounted in the pipe work shall be
supported independent of the pipes to which they connect.
INSPECTION AND TESTING AT MANUFACTURER’S PREMISES
1.0 Inspection and Tests:
1.1.1 During testing there shall be no visible evidence of structural damage to any of the
valve component.
1.1.2 Motorized valves shall be tested with their actuators, with a differential head
equivalent to their maximum working pressure, to prove that the actuators are capable
of opening and closing the valves under maximum unbalanced head condition within
the specified opening or closing period.
1.1.3 The following test shall be carried out for sluice valves:
a) Seat leakage test at rated pressure
b) Hydrostatic test at 1.5 times the rated pressure
c) Valve operation
1.1.4 The following test shall be carried out for non-return valves:
a) Seat leakage test at rated pressure
b) Body hydrostatic test at 1.5 times rated pressure
1.2.1 Testing of pipes and fitting shall be carried out in accordance with relevant Indian
Standard and internationally approved standard. Pipes, fittings and expansion bellows
shall be hydrostatically tested for 1.5 times the rated pressure.
1.4 Equipment/material for testing:
Equipment required for testing of all construction materials such as sieve analysis,
cone for slump, concrete cubes casting and testing machine shall be available on site.
All construction materials like sand, cement, aggregate etc. have to be tested on site
in representative of engineer in-charge.
Testing of steel bars are to be installed at site or shall be tested in Government/NABL
approved laboratory or as directed by engineer in-charge.
SECTION:2 SURVEY & GEOTECHNICAL INVESTIGATION FOR
Specifications for Minimum Investigations required for Project:
1.0 Survey and Soil Exploration:
➢ To plan out and obtain pre-approval and subsequently carry out Topographic and level
Survey, preparing cross sections, Longitudinal sections, Soil exploration to obtain
foundation design data at various locations for all the components listed in preamble on
previous page, complete all as per general pre-approved plan and as per detailed
description and specifications and including submitting survey, soil exploration and
analysis reports in six copies along with two soft copies and getting the same approved
by the engineer in charge.
➢ Work consists of providing all equipment, materials, labour etc. to carry out survey, to
provide permanent markers of various points for later use, to create permanent bench
mark of approved design and approved location on the site, to carry out soil exploration
to obtain information for foundation design as well as collecting data to determine various
design parameters, to collect all data, prepare interim and final reports for submission
and approval of the Engineer in-charge, all as per detailed description, specifications and
as directed by the Engineer in-charge.
➢ It must be clearly understood that the data furnished with the tender and suggested
procedure for survey and soil exploration are purely for general guidance of the bidders
for selecting the best design criteria. The contractor is expected to carry out additional
work if it becomes necessary in the process of selecting appropriate criteria. In any case
responsibility of assuring the guaranteed water supply will fully rests with him.
2.0 Work Description:
➢ Work under this item involves survey, soil exploration and investigation as described
below. Survey maps and all interim as well as final reports of soil investigation, other
tests as well as the reporting of final tests shall be submitted in six paper copies as well
as two soft copies and these will form part of a permanent record of the project for use
during construction, operation, and maintenance stages as well as for future use. All
below mentioned work shall be all inclusive and will be carried out as per detailed
specifications and as directed by the Engineer in-charge.
➢ Survey and soil investigation shall be completed within one & half month. In case after
delay of 15 calendar days the department will get completed the work from departmental
agency at the risk and cost of the contractor which shall be binding to the contractor.
3.0 Survey work shall consist of the following:
➢ To carry out Block level survey based on GTS benchmark, prepare longitudinal section
along alignment of all types of pipeline and prepare contour survey of the allotted plot
of land and the river bed of the width of 100m – 50m on either side - of the suggested
center line of the alignment, and prepare contour maps to a scale of 1:500 or larger.
Survey in the river may be carried out with help of sounding technique or long metallic
rod inserted in water from the boat. All the levels/ distance may be measured with help
of total station or DGPS.
➢ Selecting most appropriate location (on the basis of survey) to determine various
geotechnical parameters for carrying out design of various components shall be
responsibility of the contractors and it shall be carried out by laboratory approved by
GOG acceptable to GWIL.
➢ Above survey shall be carried out in stages as and when required, using the latest
equipment like TOTAL STATION or DGPS with high accuracy. In case dumpy level/ auto
level is used, then fly back as well as closing error must be performed without which
survey will be considered as NOT completed. All levels will be based on GTS, and the
work shall include transferring level from a reliable established GTS benchmark in the
vicinity of the site of work and establishing a permanent bench mark on site at a suitable
location as per approved design and location. Above survey will be carried out jointly
with the representative of the owner, as per his convenience during day time.
➢ Detailed Longitudinal Section for each pipe shall be prepared and HGL marked on it for
approval of GWSSB. After marking of such data only, execution of pipeline shall be
➢ Detailed contour plan of the headwork/ sub headwork etc. prepared with interval of
m so as to determine position of various units.
Soil exploration work for intake, RCC and framed structures, underground sumps, Pump
Houses (positive/ negative suction) shall consist of the following:
➢ 150 mm bores or more diameters (Minimum one no per unit/ structure) will be made to
collect information for the foundation design of the intake well, approach bridge
supports, underground sump, Pump House, other structures. Minimum depth of bores
from the existing level at the location of proposed sump 12 m depth, and pump house
m depth, or more as per requirement of structural design. Disturbed and undisturbed soil
samples will be collected, and grain size analysis by dry sieving/Wet analysis,
determination of liquid/plastic limit and other necessary tests like C value, N value, Ø
value and important parameters to carry out structural design and facilitate execution of
structures shall be carried out. All levels including ground level of the bore point, levels
of various strata and water levels etc. will be noted in reference to GTS.
4.0 Specification for drilling, investigation, furnishing details of bore logs, laboratory testing
➢ The investigation bores shall be made by percussion method and not by rotary method.
No bentonite slurry or drilling mud shall be used. The bores shall be cased when it is to
be done in sandy and silty strata.
➢ The quantity of boring mentioned in work description is approximate and likely to vary
materially if investigating alternative location of Infiltration Well becomes necessary. Any
change in the quantity of boring work shall not entitle the contractor for any claim or
compensation. His rates shall be deemed to cover such an eventuality.
➢ The disturbed samples shall be collected at every 1.5 Mt. Depth or at the points where
the strata changes whichever is less.
➢ The samples so collected shall be preserved in systematic manner in core boxes, when
the bore is in progress. After the bore is completed, each of the samples shall be packed
in two separate poly thin bags with contents of approx. 0.5 Kg and properly numbered
giving other details so as to identify the position to which the samples represent. All other
details such as the bores Sr. Nos., the depth from which the samples are taken etc. should
be clearly given with the samples.
➢ Out of the two sets of samples collected for every bore one set of samples with all
requisite details shall be sent to the laboratory for testing and the second set of samples
together with requisite details shall be supplied to the clients in their office for record.
The casing pipes shall be removed after above compliance and with the approval of the
Engineer in-charge. The recovered samples shall be tested in the laboratory for grain size
analysis and Atterberg’s limits to identify the samples in accordance with the provision
in IS.1498, 1971. The testing of samples shall have to be done at the recognized laboratory
approved by the engineer-in charge.
➢ The drilling shall be terminated at approx. 2.0 Mts. below the impervious (e.g. clay)
strata, when bores are being made primarily to find the level of impervious strata. And
if the samples collected indicate the soil being predominantly clayey further drilling shall
be discontinued. In sandy strata including sand with gravels and small size boulders, Bores
shall be extended at least up to 15 Mts. below bed level or low water level whichever is
lower, however if required by Client /Consultants, the bores may have to be carried
➢ Where bores are required to be done in water channel in river/ nallah bed, necessary
island/islands shall be prepared in sand or sand filled gunny bags. The cost of which shall
be covered within the rates quoted.
➢ The rates quoted shall be inclusive for drilling in all kinds of strata including boulders,
soft or hard rock.
➢ For every bore water level encountered shall be recorded together with variation in water
level if during the period of boring.
➢ All levels shall be with reference to the GTS Bench Hark. For this purpose, a pucca GTS
Bench mark shall be established in the region of proposed survey and investigation area.
➢ The readings are to be recorded and observations are to be submitted with the reports in
the format as per prosoma 1 and 2 shown below. The Contractor shall prepare bore charts
for each and every bore in the approved manner and Performa as required by Client.
➢ The disturbed samples are to be analyzed as per relevant clause of I.S. 2720 Part I to IV.
➢ The water samples of water pumped out during pump test shall be collected and analyzed
covering requirements of I.S. 10500 to establish its portability and the results of the
chemical and other tests submitted in the format shown in Performa
➢ A Technical report covering the observations and tests is to be submitted to the client
with the contractor’s recommendations for selecting the most suitable site for the Radial
well which could give the desired yield. The site for location of the pumping test shall be
finalized in consultation with the clients before the work of pumping test including
necessary boring work for the same is taken up.
5.0 Specification for preparing and submitting the full technical report:
➢ The survey work shall be carried out with proper accuracy and permanent Bench Marks
shall be established at points which are approved by the Engineer in-charge. Also,
sufficient number of permanent identification marks shall be established on the bank to
enable establishment of base lines and the survey map to be included in the report shall
contain sufficient details with respect to these permanent marks to enable the contractor
to relocate the soil investigation bores as well as pump well and piezometric bores
➢ Based on the soil investigation carried out, a contour map of the area investigated
showing the soil strata shall be prepared and included in the technical report.
➢ The soil investigation work shall be carried out as per specifications and information will
be recorded in the format given in attached Performa 1 and
➢ The short chemical analysis of water samples shall be carried out as per I.S. 10500 and
results reported in format given in attached Performa
➢ The Performa included in the tender are only for guidance and by no means are they to
be considered as the only ones required for reporting the investigation. Additional
information which is considered necessary shall be collected and recorded systematically
in proper format to arrive at the relevant conclusions.
➢ Using these parameters discharge shall be calculated for different water levels of the
river, and the report shall make definite recommendations as regards to the number of
radials, their levels, and their lengths required to obtain the desired yield.
Bore dia in cm Bore hole no.
Penetration test
Bore Date of Date of Termination depth Revision no.
hole no. start comp.
Depth of Grain size analysis
% Gravel % sand Hydrometer LL% PL% PI%
PERFORMA 3: CHEMICAL ANALYSIS OF WATER
Date of arrival Location Village:
Sr. Characteristics Permissible value as per IS
Desirable Relaxation in absence Analytical value
of alternate source
4 Dissolved solids
6 Total hardness as CaCO3
SECTION:3 CONCRETE
SECTION -3: CONCRETE
1.0 Applicable Codes with latest revisions.
➢ IS.269 Specification for 33 grade ordinary Portland cement.
➢ IS.455 Specification for Portland slag cement.
➢ IS.1489 Specification for Portland- Pozzolana cement (Part 1&2).
➢ IS:8112 Specification for 43 grade ordinary Portland cement.
➢ IS:12269 Specification for 53 grade ordinary Portland cement.
➢ IS:12330 Specification for sulphate resisting Portland cement.
➢ IS:383 Specification for coarse and fine aggregates from natural sources for concrete.
➢ IS:432 Specification for mild steel and medium (tensile steel bars and hard-drawn
steel) wires for concrete reinforcement. (Part 1 and 2)
➢ IS:1786 Specification for high strength deformed steel bars and wires for Concrete
➢ IS:1566 Specification for hard-drawn steel wire fabric for concrete Reinforcement.
➢ IS:9103 Specification for admixtures for concrete.
➢ IS:2645 Specification for integral cement water- proofing compounds.
➢ IS:4990 Specification for plywood for concrete shuttering work.
2.0 Material Testing:
➢ IS.4031 Methods of physical tests for hydraulic cement (Parts 1 to 15)
➢ IS:4032 Method chemical analysis of hydraulic cement.
➢ IS:650 Specification for standard sand for testing of cement.
➢ IS:2430 Methods for sampling of aggregates for concrete.
➢ IS: 2386 Methods of test for aggregates for concrete (Parts 1 to 8)
➢ IS:3025 Methods of sampling and test (physical and chemical) for water used in industry.
➢ IS:6925 Methods of test for determination of water-soluble chlorides in Concrete
3.0 Material Storage:
➢ IS:4082 Recommendations on stacking and storing of construction Materials at site.
4.0 Concrete Mix Design:
➢ IS:10262 Recommended guidelines for concrete mix design.
➢ SP:23 (S&T) Handbook on Concrete Mixes
5.0 Concrete Testing:
➢ IS.1199 Method of sampling and analysis of concrete.
➢ IS:516 Method of test for strength of concrete.
➢ IS:9013 Method of making, curing and determining compressive strength of accelerated
cured concrete test specimens.
➢ IS:8142 Method of test for determining setting time of concrete by Penetration
➢ IS:9284 Method of test for abrasion resistance of concrete.
➢ IS:2770 Methods of testing bond in reinforced concrete.
➢ IS:1791 Specification for batch type concrete mixers.
➢ IS:2438 Specification for roller pan mixer.
➢ IS:4925 Specification for concrete batching and mixing plant.
➢ IS:5892 Specification for concrete transit mixer and agitator.
➢ IS:7242 Specification for concrete spreaders.
➢ IS:2505 General Requirements for concrete vibrators: Immersion type.
➢ IS:2506 General Requirements for screed board concrete vibrators.
➢ IS:2514 Specification for concrete vibrating tables.
➢ IS:3366 Specification for pan vibrators.
➢ IS:4656 Specification for form vibrators for concrete.
➢ IS:11993 Code of practice for use of screed board concrete vibrators.
➢ IS:7251 Specification for concrete finishers.
➢ IS:2722 Specification for portable swing weigh batchers for concrete (Single and double
➢ IS:2750 Specification for steel scaffoldings.
7.0 Codes of Practice:
➢ IS:456 Code of practice for plain and reinforced concrete.
➢ IS:457 Code of practice for general construction of plain and reinforced Concrete for
dams and other massive structures.
➢ IS:3370 Code of practice for concrete structure for storage of liquids (Part 1 to 4).
➢ IS:3935 Code of practice for composite construction.
➢ IS:2204 Code of practice for construction of reinforced concrete shell roof.
➢ IS:2210 Criteria for the design of reinforced concrete shell structures and Folded Plates.
➢ IS:2502 Code of practice for bending and fixing of bars for concrete Reinforcement.
➢ IS:5525 Recommendation for detailing of reinforcement in reinforced Concrete works.
➢ IS:2751 Code of practice for welding of mild steel plain and deformed bars used for
reinforced concrete construction.
➢ IS:9417 Specification for welding cold worked bars for reinforced concrete construction.
➢ IS:3558 Code of practice for use of immersion vibrators for consolidating concrete.
➢ IS:3414 Code of practice for design and installation of joints in buildings.
➢ IS:4326 Code of practice for earthquake resistant design and construction of building.
➢ IS:4014 Code of practice for steel tubular scaffolding (Parts 1 & 2)
➢ IS:2571 Code of practice for laying in situ cement concrete flooring.
➢ IS:7861 Code of practice for extreme weather concreting: Part 1 Recommended practice
for hot weather concreting.
8.0 Construction Safety:
➢ IS: 3696 Safety code for scaffolds and ladders.
➢ IS:7969 Safety code for handling and storage of building materials.
➢ IS:8989 Safety code for erection of concrete framed structures.
➢ The Engineer in charge shall have the right at all times to inspect all operations including
the sources of materials, procurement, layout and storage of materials, the concrete
batching and mixing equipment and the quality control system. Such an inspection shall
be arranged and the Engineer in charge’s approval obtained, prior to starting of concrete
work. This shall however, not relieve the Contractor from any of his responsibilities. All
materials which do not conform to the Specifications shall be rejected.
➢ Materials should be selected so that they can satisfy the design requirements of strength,
serviceability, safety, durability and finish with due regards to the functional
requirements and the environmental conditions to which the structure will be subjected.
Materials complying with codes/standards shall generally be used. Other materials may
be used after approval of the Engineer in charge and after establishing their performance
suitability based on previous data, experience or tests.
10.0 Materials:
➢ Unless otherwise called for by the Engineer in charge, cement shall be ordinary Portland
cement/Sulphate resistant cement (As per instruction of engineer in-charge) conforming
to IS: 12269. However, in any case, cement grade shall not be lower than 53 grades.
➢ Fresh quality cement shall be procured only from approved manufacturer /Supplier and
shall be subject to prior approval of the Engineer-in-charge.
➢ All cement used for the work shall ordinary Portland cement of 53 grade only. Ordinary
Portland Cement shall comply with the requirements of the latest version of IS:
➢ Only one type of cement shall be used in a particular unit. The source of supply, type or
brand of cement within the same structure or portion thereof shall not be changed
without approval from the Engineer in charge.
➢ Cement which is not used within 90 days from its date of manufacture shall be tested at
a laboratory approved by the Engineer in charge and until the results of such tests are
found satisfactory, it shall not be used in any work.
➢ The white cement shall conform to I.S. 8042-1978.
Aggregates (General):
➢ Aggregates shall consist of naturally occurring stones (crushed or uncrushed), gravel and
sand. They shall be chemically inert, strong, hard, clean, durable against weathering, of
limited porosity, free from dust/silt/ organic impurities/deleterious materials and
conform to IS:383. Aggregates such as slag, crushed over burnt bricks, bloated clay ash,
sintered fly ash and tiles shall not be used.
➢ Aggregates shall be washed and screened before use where necessary or if directed by
the Engineer in charge.
➢ Aggregates containing reactive materials shall be used only after tests conclusively prove
that there will be no adverse effect on strength, durability and finish, including long term
effects, on the concrete.
➢ The fineness modulus of sand shall neither be less than 2.2 nor more than 3.2.
➢ The maximum size of coarse aggregate shall be as stated on the drawings but in no case
greater than 1/4 of the minimum thickness of the member.
➢ Plums 160 mm and above of a reasonable size may be used in mass concrete where
directed. Plums shall not constitute more than 20% by volume of the concrete.
Grit shall be consist of machined crushed stone and shall be hard, strong, tough, dense,
durable, clean, of proper gradation and free from skin or coating likely to prevent proper
adhesion of mortar. Grit shall generally be cubical in shape and as far as possible flaky
elongated pieces shall be avoided. It shall generally comply with the provisions of I.S. 383-
2016. Grit shall be obtained from the best black trap. The grit shall have no deleterious
reaction with cement.
The grit shall conform to the following gradation as per sieve analysis:
I.S. Sieve % by weight passing I.S. Sieve % by weight passing
Designation sieve Designation sieve
Sand shall consist of natural sand, crushed stone sand or crushed gravel sand or
combination of any of these. The sand shall be clean, well graded, strong, durable and
gritty particles free from injurious amounts of dust, clay, kankar nodules, soft or flaky
particles, shale, alkali, salts, organic matter, loam, mica or other deleterious substances
and shall be got approved from the Engineer-in-charge. The sand shall not contain more
than 3% of silt as determined by field tests. If necessary the sand shall be washed to make
➢ FM of sand used for different work:
Sr. Type of Work IS Code FM Range
1 For Cement concrete IS 383 zone-I & II 2.11 to
2 For Masonry IS 2116, Table:1 1.15 to
3 For plaster IS 1542 1.20 to
4 For sand bedding below pipe IS 383 zone-I & II 2.11 to
➢ Water to be used for both mixing and curing shall conform to IS:456. Potable water is
generally satisfactory. Water containing any excess of acid, alkali, sugar or salt shall not
➢ Water shall not be salty or brackish and shall be clean, reasonably clear and free from
objectionable quantities of silt and traces of oil and injurious alkalis, salts, organic
matter and other deleterious material, which will either weaken the mortar or concrete
or cause efflorescence or attack the steel in R.C.C. Container for transport, storage and
handling of water shall be clean.
➢ Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It
shall be free of elements, which significantly affect the hydration reaction or otherwise
interfere with the hardening of mortar or concrete during curing or those which produce
objectionable stains or other unsightly deposits on concrete or mortar surfaces.
➢ Hard and bitter water shall not be used for curing.
➢ Potable water shall generally be found suitable for curing mortar or concrete.
➢ Permissible Limit for Solids
Tested as per Permissible Limit Max.
Organic IS: 456 200 mg/lit
Inorganic IS: 456 3000 mg/lit
Sulphate (as SO3) IS: 456 400 mg/lit
Chlorides (as CI) IS: 456 2000 mg/lit for PCC and
500 mg/lit for RCC
Suspended Matter IS: 456 2000 mg/lit
➢ All reinforcement steel shall be CRS-FE-500 steel conforming to relevant I.S. for all RCC
structure with conforming to IS-1786.
➢ All reinforcement shall be clean, free from pitting, oil, grease, paint, loose mill scales,
rust, dirt, dust, or any other substance that will destroy or reduce bond.
➢ All Grade of reinforcement steel shall be as per Price bid & Data-sheet.
➢ Accelerating, retarding, water-reducing and air entraining admixtures shall conform to
IS: 9103 and integral water proofing admixtures to IS:
➢ Admixtures may be used in concrete as per manufacturer's instructions only with the
approval of the Engineer in charge. An admixture's suitability and effectiveness shall be
verified by trial mixes with the other materials used in the works. If two or more
admixtures are to be used simultaneously in the same concrete mix, their interaction
shall be checked and trial mixes done to ensure their compatibility. There should also be
no increase in risk of corrosion of the reinforcement or other embedment.
➢ Calcium chloride shall not be used for accelerating set of the cement for any concrete
containing reinforcement or embedded steel parts. When calcium chloride is permitted
such as in mass concrete works, it shall be dissolved in water and added to the mixing
water by an amount not exceeding 1.5 percent of the weight of the cement in each batch
of concrete. The designed concrete mix shall be corrected accordingly.
➢ Wastage allowance for cement and steel shall be considered in the item rate and no extra
payment shall be paid to the Contractor on any account.
Samples and Tests:
➢ All materials used for the works shall be tested before use.
➢ Manufacturer's test certificate shall be furnished for each batch of cement/steel and
when directed by the Engineer in charge samples shall also be got tested by the Contractor
in a laboratory approved by the Engineer in charge at no extra cost. Engineer in charge
may appoint separate third-party inspection for the material testing to ensure the quality
of the work. The Contractor shall replace the defective material as an outcome of these
➢ Sampling and testing shall be as per IS:2386 under the supervision of the Engineer in
➢ Water to be used shall be tested to comply with requirements of IS:456.
➢ The Contractor shall furnish manufacturer's test certificates and technical literature for
the admixture proposed to be used. If directed, the admixture shall be got tested at an
approved laboratory at no extra cost.
Storing of Materials:
➢ All materials shall be stored in a manner so as to prevent its deterioration and
contamination which would preclude its use in the works. Requirements of IS:4082 shall
be complied with.
➢ The Contractor will have to make his own arrangements for the storage of adequate
quantity of cement. If such cement is not stored properly and has deteriorated, the
material shall be rejected. Cement bags shall be stored in dry weatherproof shed with a
raised floor, well away from the outer walls and insulated from the floor to avoid moisture
from ground. Not more than 15 bags shall be stacked in any tier. Storage arrangement
shall be approved by the Engineer in charge. Storage under tarpaulins shall not be
permitted. Each consignment of cement shall be stored separately and consumed in its
order of receipt.
➢ Each size of coarse and fine aggregates shall be stacked separately and shall be protected
from leaves and contamination with foreign material. The stacks shall be on hard, clean,
free draining bases, draining away from the concrete mixing area.
➢ The Contractor shall make his own arrangements for storing water at site in tanks to
prevent contamination.
➢ The reinforcement shall be stacked on top of timber sleepers to avoid contact with
ground/water. Each type and size shall be stacked separately.
➢ Concrete grade shall be as designated on drawings. In concrete grade M15, M20 etc. the
number represents the specified characteristic compressive strength of 150X150X150 mm
cube at 28 days, expressed in N/mm2 as per IS:456. Concrete in the works shall be "DESIGN
MIX CONCRETE" or "NOMINAL MIX CONCRETE". All concrete works of grade M5, M7.5 and
M10 shall be NOMINAL MIX CONCRETE whereas all other grades, M15 and above, shall be
DESIGN MIX CONCRETE. Concrete grade shall not be lower than M-25 for building and M-
30 for water retaining structures (all units of STP including distribution chambers, sludge
chambers, inlet/ outlet chambers adjacent to PST/ AT/ SST, sump).
12.0 Design Mix Concrete:
Mix Design & Testing
➢ For Design Mix Concrete, the mix shall be designed according to IS:10262 and SP:23 to
provide the grade of concrete having the required workability and characteristic strength
not less than appropriate values given in IS:456. The design mix shall be cohesive and
does not segregate and should result in a dense and durable concrete and also capable of
giving the finish as specified. For liquid retaining structures, the mix shall also result in
water tight concrete. The Contractor shall exercise great care while designing the
concrete mix and executing the works to achieve the desired result.
➢ The minimum cement content for Design Mix Concrete shall be as per Appendix-A of IS:456
or as given below, whichever is higher.
Minimum Cement Content in Kg/m3 of
Grade of Concrete
➢ The minimum cement content stipulated above shall be adopted irrespective of whether
the Contractor achieves the desired strength with less quantity of cement. The
CONTRACTOR's quoted rates for concrete shall provide for the above eventuality and
nothing extra shall be paid to the CONTRACTOR on this account. Even in the case where
the quantity of cement required is higher than that specified above to achieve desired
strength based on an approved mix design, nothing extra shall become payable to the
➢ It shall be the Contractor's sole responsibility to carry out the mix designs at his own cost.
He shall furnish to the EMPLOYER at least 30 days before concreting operations, a
statement of proportions proposed to be used for the various concrete mixes and the
strength results obtained. The strength requirements of the concrete mixes ascertained
on 150 mm cubes as per IS:516 shall comply with the requirements of IS:456.
Grade of Minimum Compressive Specified Characteristic Compressive
Concrete Strength N/sq.mm at 7 days Strength N/sq.mm at 28 days
➢ A range of slumps which shall generally be used for various types of construction unless
otherwise instructed by the Engineer in charge is given below:
Slump in millimeters
Structure/Member
Maximum Minimum
Reinforced foundation walls and 75
Plain footings, caissons and 100
Slabs, Beams and reinforced walls 75
Pump & miscellaneous Equipment
Building columns 50
Heavy mass construction 50
➢ Characteristic Compressive Strength Compliance Requirement (Table 11: IS 456).
13.0 Batching & Mixing of Concrete:
➢ Proportions of aggregates and cement, as decided by the concrete mix design, shall be
by weight. These proportions shall be maintained during subsequent concrete batching by
means of weigh batchers capable of controlling the weights within one percent of the
➢ Amount of water added shall be such as to produce dense concrete of required
consistency, specified strength and satisfactory workability and shall be so adjusted to
account for moisture content in the aggregates. Water- cement ratio specified for use by
the Engineer in charge shall be maintained. Each time when the work stops, the mixer
shall be cleaned out, and while recommencing, the first batch shall have 10% additional
cement to allow for sticking in the drum.
➢ Arrangement should be made by the Contractor at his own cost to have the cubes tested
in an Government/NABL approved laboratory as per IS 10262-2009 or in field with prior
consent of the Engineer in charge. Prior to start the work as per approved Mix Design, the
cubes shall be casted at site and it shall be sent to “GERI” for testing, confirmation and
to compare the test results for 7 and 28 days with the approved Mix Design. Concrete
work can be started after approval of testing results from GERI for 7 and 28 days. At least
10% of tests shall be carried out in Government engineering college or in the GERI.
Sampling and testing of strength and workability of concrete shall be as per IS:1199, IS:516
14.0 Nominal Mix Concrete
Mix Design & Testing
➢ Mix design and preliminary tests are not necessary for Nominal Mix Concrete.
➢ However, works tests shall be carried out as per IS:456. Proportions for Nominal Mix
Concrete and Water Cement Ratio may be adopted as per Table 3 of IS:456. However, it
will be the Contractor's sole responsibility to adopt appropriate nominal mix proportions
to yield the specified strength.
15.0 Batching & Mixing of Concrete:
➢ Based on the adopted nominal mixes, aggregates shall be measured by volume. However,
cement shall be by weight only.
➢ Formwork shall be all inclusive and shall consist of shoring, bracings, sides of footings,
walls, beams and columns, bottom of slabs etc. including ties, anchors, hangers, inserts,
false work, wedges etc.
➢ The design and engineering of the formwork as well as its construction shall be the
responsibility of the Contractor. However, if so desired by the Engineer in charge,
➢ The drawings and calculations for the design of the formwork shall be submitted to the
Engineer in charge for approval.
Formwork shall be designed to fulfill the following requirements:
➢ Sufficiently rigid and tight to prevent loss of grout/ slurry or mortar from the concrete at
all stages and appropriate to the methods of placing and compacting.
➢ Formwork shall be made of suitable materials as directed by engineer in-charge.
➢ Capable of providing concrete of the correct shape and surface finish within the specified
tolerance limits.
➢ Capable of withstanding without deflection the worst combination of self-weight,
reinforcement and concrete weight, all loads and dynamic effects arising from
construction and compacting activities, earthquake, wind and weather forces.
➢ Capable of easy striking out without shock, disturbance or damage to the concrete.
➢ Soffit forms capable of imparting a camber if required.
➢ Soffit forms and supports capable of being left in position if required.
➢ Capable of being cleaned and/or coated if necessary immediately prior to casting the
concrete; design temporary openings where necessary for these purposes and to facilitate
the preparation of construction joints.
➢ The formwork may be of timber, plywood, steel, plastic or concrete depending upon the
type of finish specified. Sliding forms and slip form may be used with the approval of the
Engineer in charge. Timber for formwork shall be well seasoned, free from sap, shakes,
loose knots, worm holes, warps and other surface defects. Joints between formwork and
between formwork and structures shall be sufficiently tight to prevent loss of slurry from
concrete, using seals if necessary.
➢ The faces of formwork coming in contact with concrete shall be cleaned and two coats of
approved mould oil applied before fixing reinforcement. All rubbish, particularly
chippings, shavings, sawdust, wire pieces dust etc. shall be removed from the interior of
the forms before the concrete is placed. Where directed, cleaning of forms shall be done
by blasting with a jet of compressed air at no extra cost.
➢ Forms intended for reuse shall be treated with care. Forms that have deteriorated shall
not be used. Before reuse, all forms shall be thoroughly scraped, cleaned, nails removed,
holes suitably plugged, joints repaired and warped lumber replaced to the satisfaction of
the Engineer in charge. The Contractor shall equip himself with enough shuttering to allow
for wastage so as to complete the job in time.
➢ Permanent formwork shall be checked for its durability and compatibility with adjoining
concrete before it is used in the structure. It shall be properly anchored to the concrete.
➢ Wire ties passing through beams, columns and walls shall not be allowed. In their place
bolts passing through sleeves shall be used. Formwork spacers left in situ shall not impair
the desired appearance or durability of the structure by causing spilling, rust staining or
allowing the passage of moisture.
➢ For liquid retaining structures, sleeves shall not be provided for through bolts nor shall
through bolts be removed if provided. The bolts, in the latter case, shall be cut at 25 mm
depth from the surface and the hole made good by cement mortar of the same proportion
as the concrete just after striking the formwork.
➢ Where specified all corners and angles exposed in the finished structure shall have
chamfers or fillets of 20 mm x 20 mm size.
➢ Forms for substructure may be omitted when, in the opinion of the Engineer in charge,
the open excavation is firm enough (in hard non-porous soils) to act as a form. Such
excavations shall be larger, as approved by the Engineer in charge, than that required as
per drawing to compensate for irregularities in excavation.
➢ The Contractor shall provide adequate props carried down to a firm bearing without
overloading any of the structures.
➢ The shuttering for beams and slabs shall be so erected that the side shuttering of beams
can be removed without disturbing the bottom shuttering. If the shuttering for a column
is erected for the full height of the column, one side shall be built up in sections as placing
of concrete proceeds or windows left for placing concrete from the side to limit the drop
of concrete to 1.0m or as approved by the Engineer in charge. The Contractor shall
temporarily and securely fix items to be casted (embedment / inserts) in a manner that
will not hinder the striking of forms or permit loss of grout.
➢ Formwork showing excessive distortion, during any stage of construction, shall be
repositioned and strengthened. Placed concrete affected by faulty formwork, shall be
entirely removed and formwork corrected prior to placement of new concrete at
Contractor's cost.
The striking time for formwork shall be determined based on the following requirements:
➢ Development of adequate concrete strength.
➢ Permissible deflection at time of striking form work.
➢ Curing procedure employed - its efficiency and effectiveness.
➢ Subsequent surface treatment to be done;
➢ Prevention of thermal cracking at re-entrant angles;
➢ Ambient temperatures; and
➢ Aggressiveness of the environment (unless immediate adequate steps are taken to prevent
damage to the concrete).
➢ Under normal circumstances (generally where temperatures are above 20oC) forms may
be struck after expiry of the time period given in IS:456 unless approved otherwise by the
Engineer in charge. For Portland Pozzolana/slag cement the stripping time shall be
suitably modified as approved by the Engineer in charge. It is the Contractor's
responsibility to ensure that forms are not struck until the concrete has developed
sufficient strength to support itself, does not undergo excessive deformation and resist
surface damage and any stresses arising during the construction period.
17.0 Reinforcement Workmanship
➢ Reinforcing bars supplied bent or in coils shall be straightened cold without damage. No
bending shall be done when ambient temperature is below 5°C. Local warming may be
permitted if steel is kept below 10° C. All bars shall be accurately cut and bent gradually
and according to the sizes and shapes shown on the drawings/ schedules or as directed
by Engineer in charge. Re-bending or straightening incorrectly bent bars shall not be done
without the approval of the Engineer in charge.
➢ Reinforcement shall be accurately fixed and maintained firmly in the correct position by
the use of blocks, spacers, chairs, binding wire etc. to prevent displacement during
placing and compaction of concrete. The tied in place reinforcement shall be approved
by the Engineer in charge prior to concrete placement. Spacers shall be of such materials
and designs as will be durable, not lead to corrosion of the reinforcement and not cause
spilling of the concrete cover. Binding wire shall be 16-gauge soft annealed wires. Ends
of the binding wire shall be bent away from the concrete surface and in no case encroach
into the concrete cover.
➢ Substitution of reinforcement, laps/splices not shown on drawing shall be subject to
Engineer in charge’s approval.
18.0 Tolerances:
➢ Tolerance for formwork and concrete dimensions shall be as per IS:456 unless specified
➢ Tolerances specified for horizontal or vertical building lines or footings shall not be
construed to permit encroachment beyond the legal boundaries.
➢ The formwork shall be designed and constructed to the shapes, lines and dimensions
shown on the drawings within the tolerances given below:
Deviation from specified dimensions
of cross section of columns and beams
Deviations from dimensions of footings
(Tolerances apply to concrete
dimensions only, not to positioning of
vertical reinforcing steel or dowels
1) Dimension in plan - 12 mm+ 50 mm
0.02 times the width of the
footing in the direction of
2) Eccentricity
deviation but not more than
± 0.05 times the specified
19.0 Preparation Prior to Concrete Placement:
➢ Before concrete is actually placed in position, the inside of the formwork shall be cleaned
and mould oil applied, inserts and reinforcement shall be correctly positioned and
securely held, necessary openings, pockets, etc. provided.
➢ All arrangements-formwork, equipment and proposed procedure, shall be approved by
the Engineer in charge. Contractor shall maintain separate Pour Card for each pour as per
the format enclosed.
20.0 Transporting, Placing and Compacting Concrete:
➢ Concrete shall be transported from the mixing plant to the formwork with minimum time
lapse by methods that shall maintain the required workability and will prevent
segregation, loss of any ingredients or ingress of foreign matter or water.
➢ In all cases concrete shall be deposited as nearly as practicable directly in its final
position. To avoid segregation, concrete shall not be re handled or caused to flow. For
locations where, direct placement is not possible and in narrow forms the Contractor shall
provide suitable drops and "Elephant Trunks". Concrete shall not be dropped from a height
of more than 1.0m.
➢ Concrete shall not be placed in flowing water. Under water, concrete shall be placed in
position by tremie or by pipeline from the mixer and shall never be allowed to fall freely
through the water.
While placing concrete the Contractor shall proceed as specified below and also
ensure the following:
➢ Continuously between construction joints and pre-determined abutments.
➢ Without disturbance to forms or reinforcement.
➢ Without disturbance to pipes, ducts, fixings and the like to be cast in; ensure that such
items are securely fixed. Ensure that concrete cannot enter open ends of pipes and
➢ Without dropping in a manner that could cause segregation or shock.
➢ In deep pours only when the concrete and formwork designed for this purpose and by
using suitable chutes or pipes.
➢ Do not place if the workability is such that full compaction cannot be achieved.
➢ Without disturbing the unsupported sides of excavations; prevent contamination of
concrete with earth. Provide sheeting if necessary. In supported excavations, withdraw
the linings progressively as concrete is placed.
➢ If placed directly onto hardcore or any other porous material, dampen the surface to
reduce loss of water from the concrete.
➢ Ensure that there is no damage or displacement to sheet membranes.
➢ Record the time and location of placing structural concrete.
➢ Concrete shall normally be compacted in its final position within thirty minutes of leaving
the mixer. Concrete shall be compacted during placing with approved vibrating
equipment without causing segregation until it forms a solid mass free from voids
thoroughly worked around reinforcement and embedded fixtures and into all corners of
the formwork. Immersion vibrators shall be inserted vertically at points not more than
450 mm apart and withdrawn slowly till air bubbles cease to come to the surface, leaving
no voids. When placing concrete in layers advancing horizontally, care shall be taken to
ensure adequate vibration, blending and melding of the concrete between successive
layers. Vibrators shall not be allowed to come in contact with reinforcement, formwork
and finished surfaces after start of initial set. Over-vibration shall be avoided.
➢ Concrete may be conveyed and placed by mechanically operated equipment after getting
the complete procedure approved by the Engineer in charge. The slump shall be held to
the minimum necessary for conveying concrete by this method. When concrete is to be
pumped, the concrete mix shall be specially designed to suit pumping. Care shall be taken
to avoid stoppages in work once pumping has started.
➢ Except when placing with slip forms, each placement of concrete in multiple lift work
shall be allowed to set for at least 24 hours after the final set of concrete before the start
of subsequent placement. Placing shall stop when concrete reaches the top of the opening
in walls or bottom surface of slab, in slab and beam construction, and it shall be resumed
before concrete takes initial set but not until it has had time to settle as approved by the
Engineer in charge. Concrete shall be protected against damage until final acceptance.
21.0 Mass Concrete Works:
➢ Sequence of pouring for mass concrete works shall be as approved by the Engineer in
charge. The Contractor shall exercise great care to prevent shrinkage cracks and shall
monitor the temperature of the placed concrete if directed.
➢ At the time of placing concrete, thickness of layer shall not be more than 450 mm for
vibrated concrete per layer and limiting height of concrete shall be applicable as per IS
457, clause 4.10.7 for particular component.
Curing and protection shall start immediately after the compaction of the concrete to
protect it from:
➢ Premature drying out, particularly by solar radiation and wind;
➢ Leaching out by rain and flowing water;
➢ Rapid cooling during the first few days after placing;
➢ High internal thermal gradients;
➢ Low temperature or frost;
➢ Vibration and impact which may disrupt the concrete and interfere with its bond to the
➢ All concrete, unless approved otherwise by the Engineer in charge, shall be cured by use
of continuous sprays or ponded water or continuously saturated coverings of sacking,
canvas or other absorbent material for the period of complete hydration with a minimum
of 7 days. The quality of curing water shall be the same as that used for mixing.
➢ Where a curing membrane is approved to be used by the Engineer in charge, the same
shall be of a non-wax base and shall not impair the concrete finish in any manner. The
curing compound to be used shall be approved by the EMPLOYER before use and shall be
applied with spraying equipment capable of a smooth, even textured coat.
➢ Curing may also be done by covering the surface with an impermeable material such as
polyethylene, which shall be well sealed and fastened.
23.0 Construction Joints and Keys:
➢ Construction joints will be as shown in the drawing or as approved by the EMPLOYER.
Concrete shall be placed without interruption until completion of work between
construction joints. If stopping of concreting becomes unavoidable anywhere, a properly
formed construction joint shall be made with the approval of the Engineer in charge.
➢ Dowels for concrete work, not likely to be taken up in the near future, shall be coated
with cement slurry and encased in lean concrete as indicated on the drawings or as
approved by the Engineer in charge.
➢ Before resuming concreting on a surface which has hardened all laitance and loose stone
shall be thoroughly removed by wire brushing/hacking and surface washed with high
pressure water jet and treated with thin layer of cement slurry for vertical joints and
horizontal layers.
➢ When concreting is to be resumed on a surface which has not fully hardened, all laitance
shall be removed by wire brushing, the surface wetted, free water removed and a coat
of cement slurry applied. On this, a layer of concrete not exceeding 150 thickness shall
be placed and well rammed against the old work. Thereafter work shall proceed in the
24.0 Foundation Bedding:
➢ All earth surfaces upon which or against which concrete is to be placed, shall be well
compacted and free from standing water, mud or debris. Soft or spongy areas shall be
cleaned out and back filled with either soil-cement mixture, lean concrete or clean sand
compacted as approved by the Engineer in charge. The surfaces of absorptive soils shall
➢ Concrete shall not be deposited on large sloping rock surfaces. The rock shall be cut to
form rough steps or benches by picking, barring or wedging. The rock surface shall be
kept wet for 2 to 4 hours before concreting.
➢ The formwork for concrete works shall be such as to give the finish as specified. The
Contractor shall make good any unavoidable defects as approved consistent with the type
of concrete and finish as specified. Defects due to bad workmanship (e.g. damaged or
misaligned forms, defective or poorly compacted concrete) will not be accepted. The
Contractor shall construct the formwork using the correct materials and to meet the
requirements of the design and to produce finished concrete to required dimensions,
plumbs, planes and finishes.
Surface Finish Type F1:
➢ The main requirement is that of dense, well-compacted concrete. No treatment is
required except repair of defective areas, filling all form tie holes and cleaning up of
loose or adhering debris. For surfaces below grade, which will receive waterproofing
treatment, the concrete shall be free of surface irregularities, which would interfere with
proper and effective application of waterproofing material specified for use.
Surface Finish Type F2:
➢ The appearance shall be that of a smooth dense, well-compacted concrete showing the
slight marks of well fitted shuttering joints. The Contractor shall make good any
Surface Finish Type F3:
➢ This finish shall give an appearance of smooth, dense, well-compacted concrete with no
shutter marks, stain free and with no discoloration, blemishes, arises, air holes etc. Only
lined or coated plywood with very tight joints shall be used to achieve this finish. The
panel size shall be uniform and as large as practicable. Any minor blemishes that might
occur shall be made good by the Contractor.
Integral Cement Finish on Concrete Floor:
➢ In all cases where integral cement finish on a concrete floor has been specified, the top
layer of concrete shall be screened off to proper level and tamped with tamper having
conical projections so that the aggregate shall be forced below the surface. The surface
shall be finished with a wooden float and a trowel with pressure. The finish shall be
continued till the concrete reaches its initial set. No cement or cement mortar finish shall
be provided on the surface. Where specified, a floor hardener as approved by the
Engineer-In-Charge shall be supplied and used as recommended by the manufacturer.
➢ The formwork for concrete works shall be such as to give the finish as specified. The
Contractor shall make good any unavoidable defects as approved consistent with the type
of concrete and finish specified; defects due to bad workmanship (e.g. damaged or
misaligned forms, defective or poorly compacted concrete) will not be accepted. The
Contractor shall construct the formwork using the correct materials and to meet the
requirements of the design and to produce finished concrete to required dimensions,
plumbs, planes and finishes.
26.0 Repair and Replacement of Unsatisfactory Concrete:
➢ Immediately after the shuttering is removed, all the defective areas such as honey-
combed surfaces, rough patches, holes left by form bolts etc. shall be inspected by the
Engineer in charge who may permit patching of the defective areas or reject the concrete
➢ All through holes for shuttering shall be filled for full depth and neatly plugged flush with
➢ Rejected concrete shall be removed and replaced by the Contractor at no additional cost
to the Employer.
➢ For patching of defective areas all loose materials shall be removed and the surface shall
be prepared as approved by the Engineer in charge.
➢ Bonding between hardened and fresh concrete shall be done either by placing cement
mortar or by applying epoxy. The decision of the Engineer in charge as to the method of
repairs to be adopted shall be final and binding on the Contractor. The surface shall be
saturated with water for 24 hours before patching is done with 1:5 cement sand mortar.
The use of epoxy for bonding fresh concrete shall be carried out as approved by the
Engineer in charge.
27.0 Vacuum Dewatering of Slabs:
➢ Where specified floor slabs, either grade or suspended, shall be finished by vacuum
dewatering including all operations such as poker vibration, surface vibration, vacuum
processing, floating and toweling as per equipment manufacturers recommendation. The
equipment to be used shall be subject to the Engineer in charge's approval.
28.0 Hot Weather Requirements:
➢ Concreting during hot weather shall be carried out as per IS:7861 (Part I).
➢ Adequate provisions shall be made to lower concrete temperatures which shall not exceed
40º C at the time of placement of fresh concrete.
➢ Where directed by the Engineer in charge, the Contractor shall spray non-wax based
curing compound on unformed concrete surfaces at no extra costs.
29.0 Cold Weather Requirements.
➢ Concreting during cold weather shall be carried out as per IS: 7861 (Part II).
➢ The ambient temperature during placement and up to final set shall not fall below 5º C.
Approved antifreeze/accelerating additives shall be used where directed.
➢ For major and large-scale concreting works the temperature of concrete at times of
mixing and placing, the thermal conductivity of the formwork and its insulation and
stripping period shall be closely monitored.
30.0 Liquid Retaining Structures:
➢ The Contractor shall take special care for concrete for liquid retaining structures,
underground structures and those others specifically called for to guarantee the finish
and water tightness.
➢ The minimum level of surface finish for liquid retaining structures shall be as defined
elsewhere. All such structures shall be hydro-tested.
➢ The Contractor shall make all arrangements for hydro-testing of structure, all
arrangements for testing such as temporary bulk heads, pressure gauges, pumps, pipe
➢ The Contractor shall also make all temporary arrangements that may have to be made to
ensure stability of the structures during construction.
➢ Any leakage that may occur during the hydro-test or subsequently during the defects
liability period or the period for which the structure is guaranteed shall be effectively
stopped either by cement/epoxy pressure grouting, guiniting or such other methods as
may be approved by the Engineer in charge. All such rectification shall be done by the
Contractor to the entire satisfaction of the Engineer in charge at no extra cost.
Placing Concrete Underwater:
➢ Under all ordinary conditions all foundations shall be completely dewatered and concrete
placed in the dry. However, when concrete placement under water is necessary, all work
shall conform to IS:456 and the procedure shall be as described in the following
➢ Concrete shall be deposited underwater by means of tremies, or drop bottom buckets of
➢ All work requiring placement of concrete underwater shall be designed, directed and
inspected with due regard to local circumstances and purposes. All underwater concrete
shall be placed according to the plans or Specifications and as directed and approved by
Engineer In-charge.
31.0 Testing Concrete Structures for Leakage:
Hydro-static test for water tightness shall be done at full storage level or soffit of
cover slab, as may be directed by the Engineer in charge, as described below:
➢ In case of structures whose external faces are exposed, such as elevated tanks, the
requirements of the test shall be deemed to be satisfied if the external faces show no
sign of leakage or sweating and remain completely dry during the period of observation
of seven days after allowing a seven-day period for absorption after filling with water.
➢ In the case of structures whose external faces are buried and are not accessible for
inspection, such as underground tanks, the structures shall be filled with water and after
the expiry of seven days after the filling; the level of the surface of the water shall be
recorded. The level of water shall be recorded again at subsequent intervals of 24 hrs.
Over a period of seven days. Backfilling shall be withheld till the tanks are tested. The
total drop in surface level over a period for seven days shall be taken as an indication of
the water tightness of the structure. The Engineer in charge shall decide on the actual
permissible nature of this drop in the surface level, considering whether the structures
are open or closed and the corresponding effect it has on evaporation losses.
➢ Unless specified otherwise, a structure whose top is covered shall be deemed to be water
tight if the total drop in the surface level over a period of seven days does not exceed
➢ Each compartment/segment of the structure shall be tested individually and then all
➢ For structures such as pipes, tunnels etc. the hydrostatic test shall be carried out by filling
with water, after curing as specified, and subjecting to the specified test pressure for
specified period. If during this period the loss of water does not exceed the equivalent of
the specified rate, the structure shall be considered to have successfully passed the test.
Optional Tests:
➢ If the Employer feels that the materials i.e. cement, sand, coarse aggregates,
reinforcement and water are not in accordance with the Specifications or if specified
concrete strengths are not obtained, he may order tests to be carried out on these
materials in laboratory, to be approved by the Engineer in charge, as per relevant IS
Codes. Contractor shall have to pay for these tests.
➢ In the event of any work being suspected of faulty material or workmanship requiring its
removal or if the works cubes do not give the stipulated strengths, the Engineer in charge
reserves the right to order the Contractor to take out cores and conduct tests on them or
do ultrasonic testing or load testing of structure, etc. The Engineer in charge also reserves
the right to ask the Contractor to dismantle and re-do such unacceptable work, at no cost
to the Engineer in charge. Alternately Engineer in charge also reserves the right to ask
the CONTRACTOR to dismantle and re-do such unacceptable work at the cost of
Standard Grout:
➢ Grout shall be provided as specified on the drawings.
➢ The proportion of Standard Grout shall be such as to produce a flow able mixture
consistent with minimum water content and shrinkage. Surfaces to be grouted shall be
thoroughly roughened and cleaned. All structural steel elements to be grouted shall be
cleaned of oil, grease, dirt etc. The use of hot, strong caustic solution for this purpose
will be permitted. Prior to grouting, the hardened concrete shall be saturated with water
and just before grouting, water in all pockets shall be removed. Grouting once started
shall be done quickly and continuously. Variation in grout mixes and procedures shall be
permitted if approved by the Engineer in charge. The grout proportions shall be limited
Use Grout Thickness Mix Proportions
Cement Ratio (max)
One-part Portland Cement
1. Fluid mix Under 25mm
to one-part sand
25mm and over but One-part Portland Cement
less than 50mm to 2 parts of sand
One-part Portland Cement
c) Stiff mix 50mm and over
to 3 parts of sand
Non-Shrink Grout:
➢ Non-shrink grout where required shall be provided in strict accordance with the
manufacturer's instructions / specifications on the drawing.
➢ All materials, workmanship and finished construction shall be subject to continuous
inspection and approval of Engineer in charge. Materials rejected by Engineer in charge
shall be expressly removed from site and shall be replaced by Contractor immediately.
➢ Upon the completion of concrete work, all forms, equipment, construction tools,
protective coverings and any debris, scraps of wood, etc. resulting from the work shall be
removed and the premises left clean.
Acceptance Criteria:
➢ Any concrete work shall satisfy the requirements given below individually and collectively
for it to be acceptable.
➢ Properties of constituent materials;
➢ Characteristic compressive strength;
➢ Specified mix proportions;
➢ Minimum cement content;
➢ Maximum free-water/cement ratio;
➢ Temperature of fresh concrete;
➢ Density of fully compacted concrete;
➢ Cover to embedded steel;
➢ Tolerances in dimensions;
➢ Tolerances in levels;
➢ Surface finishes;
➢ Special requirements such as;
➢ Water tightness
➢ Resistance to aggressive chemicals
➢ Resistance to freezing and thawing
➢ Very high strength
➢ Improved fire resistance
➢ Wear resistance
➢ Resistance to early thermal cracking
➢ The Engineer in charge's decision as to the acceptability or otherwise of any concrete
work shall be final and binding on the Contractor. For work not accepted, the Engineer in
charge may review and decide whether remedial measures are feasible so as to render
the work acceptable. The Engineer in charge shall in that case direct the Contractor to
undertake and execute the remedial measures. These shall be expeditiously and
effectively implemented by the Contractor. Nothing extra shall become payable to the
Contractor by the Employer for executing the remedial measures.
33.0 Water stops:
➢ The material for the PVC water stops shall be a plastic compound with the basic resin of
polyvinyl chloride and additional resins, plasticizers, inhibitors, which satisfies the
performance characteristics specified below as per IS:12200. Testing shall be in
accordance with IS:8543.
a) Tensile strength : 3.6 N/mm2 minimum
c) Ultimate elongation : 300 % minimum
d) Tear resistance : 4.9 N/mm2 minimum
e) Stiffness in flexure : 2.46 N/mm2 minimum
f) Accelerated extraction
g) Tensile strength : 10.50 N/mm2 minimum
h) Ultimate elongation : 250% minimum
i) Effect of Alkali : 7 days
j) Weight increase : 0.10% maximum
k) Weight decrease : 0.10% maximum
l) Hardness change : ± 5 points
m) Effect of Alkali : 28 days
n) Weight increase : 0.40% maximum
o) Weight decrease : 0.30% maximum
p) Dimension change : ±1%
➢ PVC water stops shall be either of the bar type, serrated with center bulb and end grips
for use within the concrete elements or of the surface (kicker) type for external use.
➢ PVC water stops shall be of approved manufacture. Samples and the test certificate shall
be got approved by the Engineer in charge before procurement for incorporation in the
works. Alternatively, G.I. sheet of 18 gage (1.3mm) thick and 200mm wide can be used
by the contractor as construction joints.
➢ Alternatively, contractors can use G.I sheet 200mm wide and 18 gauge thick as
constructions joints.
34.0 Workmanship:
➢ Water stops shall be cleaned before placing them in position. Oil or grease shall be
removed thoroughly using water and suitable detergents.
➢ Water stops shall be procured in long lengths as manufactured to avoid joints as far as
possible. Standard L or T type of intersection pieces shall be procured for use depending
on their requirement. Any non-standard junctions shall be made by cutting the pieces to
profile for jointing. Lapping of water stops shall not be permitted. All jointing shall be
of fusion welded type as per manufacturer’s instructions.
➢ Water stops shall be placed at the correct location/level and suitably supported at
intervals with the reinforcement to ensure that it does not deviate from its intended
position during concreting and vibrating. Care shall also be taken to ensure that no honey-
combing occurs because of the serrations/end grips, by placing concrete with smaller size
aggregates in this region. Projecting portions of the water stops embedded in concrete
shall be thoroughly cleaned of all mortar/ concrete coating before resuming further
concreting operations. The projecting water stop shall also be suitably supported at
intervals with the reinforcement to maintain its intended position during concreting so as
to ensure that it does not bend leading to formation of pockets. In addition, smaller size
aggregates shall be used for concreting in this region also.
35.0 Preformed Fillers and Joint Sealing Compound:
➢ Preformed filler for expansion/isolation joints shall be non-extruding and resilient type
of bitumen impregnated fibers conforming to IS:1838 (Part I).
➢ Bitumen coat to concrete/masonry surfaces for fixing the preformed bitumen filler strip
shall conform to IS:702. Bitumen primer shall conform to IS:3384.
➢ Sealing compound for filling the joints above the preformed bitumen filler shall conform
to Grade 'A' as per IS:1834.
➢ The thickness of the preformed bitumen filler shall be 25mm for expansion joints and
50mm for isolation joints around foundation supporting rotatory equipment's. Contractor
shall procure the strips of the desired thickness and width in lengths as manufactured.
Assembly of small pieces/thicknesses of strips to make up the specified size shall not be
➢ The concrete/masonry surface shall be cleaned free from dust and any loose particles.
When the surface is dry, one coat of industrial blown type bitumen of grade 85/25
conforming to IS:702 shall be applied hot by brushing at the rate of 1.20 kg/m2. When
the bitumen is still hot the preformed bitumen filler shall be pressed and held in position
till it completely adheres. The surface of the filler against which further
concreting/masonry work is to be done shall similarly be applied with one coat of hot
bitumen at the rate of 1.20 kg/m2.
➢ Sealing compound shall be heated to a pouring consistency for enabling it to run molten
in a uniform manner into the joint. Before pouring the sealing compound, the vertical
faces of the concrete joint shall be applied hot with a coat of bitumen primer conforming
to IS: 3384 in order to improve the adhesive quality of the sealing compound.
➢ Expansion joints between beams/slabs shall be provided with 100mm wide x 4mm thick
mild steel plate at the soffit of RCC beams/slabs to support and prevent the preformed
joint filler from dislodging. This plate shall be welded to an edge angle of ISA 50 x 50 x
6mm provided at the bottom corner, adjacent to the expansion joint of one of the
beams/slabs, by intermittent fillet welding. Steel surfaces shall be provided with 2 coats
of red oxide zinc chrome primer and 3 coats of synthetic enamel paint finish.
CONCRETE POUR CARD
POUR NO.: DATE:
DRG. NO.: STRUCTURE:
CONCRETE GRADE/QUANTITY/: MAX. AGGREGATE SIZE /
SLUMP: START / COMPLETION TIME:
1 CONCRETIN YES/NO
STAGING CHECKED
STRENGTH & FINISH
4 REINFORCEMENT YES/NO
5 CERTIFICATE FOR YES/NO
6 MATERIALS / YES/NO
EQUIPMENT FOR POUR
EMBEDDED CIVIL YES/NO
(LOCATIO MECH. YES/NO
PLUMB) ELEC. YES/NO
SOFFIT(S) & POUR TOP(T) LEVELS T(B)
8 CHECKED BEFORE (B) & AFTER (A)
FORM REMOVAL S(A)
CONSTRUCTION JOINTS LOCATION &
EXPANSION JOINTS – LOCATION AND
10 CEMENT CONSUMPTION IN KGS.
REINFORCEMENT CONSUMPTION
NUMBER OF CUBES AND
IDENTIFICATION MARKS
TEST CUBE RESULTS (7 DAYS /
CONCRETE CONDITION ON FORM V.GOOD/GOOD/FAIR
Contractor's Representative Engineer- in-charge's Representative
➢ EACH POUR TO HAVE SEPARATE CARDS, IN TRIPLICATE ONE EACH FOR CLIENT,
CONTRACTOR & SITE OFFICE.
➢ UNDER REMARKS, INDICATE DEVIATIONS FROM DWGS. & SPECIFICATIONS, CONGESTION IN
REINFORCEMENT IF ANY, UNUSUAL OCCURRENCES SUCH AS FAILURE OF EQUIPMENTS,
SINKING OF SUPPORTS / PROPS. HEAVY RAINS AFFECTING CONCRETING, POOR
COMPACTION, IMPROPER CURING, OTHER DEFICIENCIES, OBSERVATIONS ETC.
SECTION -4 BUILDING ITEMS
BUILDING ITEMS.
Applicable Codes and Specifications
➢ The following codes and standards are included in this section, as part of these specifications.
However, respective IS codes for the works not mentioned here shall also be applicable for
those particular items of work.
IS:110 - Ready mixed paint, brushing, gray filler, for Enamels for use over primers
IS:269 - Specification for 33 grade ordinary Portland cement
IS:280 - Specification for mild steel wire for general Engineering purposes
IS:287 - Recommendations for maximum permissible Moisture content of timber used for
different purposes
IS:383 - Specif. for coarse &fine aggregates from natural sources for concrete
IS:412 - Expanded metal steel sheets for general purposes
IS:419 - Specification for putty for use on window frames
IS:428 - Distemper, oil emulsion, color as required
IS:459 - Specification for unreinforced corrugated and semi-corrugated asbestos cement
IS:702 - Specification for industrial bitumen
IS:710 - Specification for marine plywood
IS:712 - Specification for building limes
IS:730 - Specification for hook bolts for corrugated sheet Roofing
IS:733 - Wrought aluminum and aluminum alloys, bars, Rods and sections for general
engineering purposes
IS:777 - Specification for glazed earthenware tiles
IS:1003 - Specification for timber paneled and glazed shutters (Parts 1 & 2)
IS:1038 - Specification for steel doors, windows and ventilators
IS:1077 - Specification for common burnt clay building bricks
IS:1081 - Code of practice for fixing and glazing of metal (steel &aluminum) doors,
windows and ventilators.
IS:1124 - Method of test for determination of water absorption, apparent specific
gravity and porosity of natural building stones
IS:1237 - Specification for cement concrete flooring tiles
IS:1322 - Bitumen felts for water proofing and damp proofing
IS:1346 - Code of practice for water proofing of roofs with bitumen felts
IS:1361 - Specification for steel windows for industrial buildings
IS:1443 - Code of practice for laying and finishing of cement concrete flooring tiles
IS:1477 - Code of practice for painting of ferrous metals in buildings (Parts 1 & 2)
IS:1542 - Specification for sand for plaster
IS:1580- Specification for bituminous compounds for water-proofing and caulking purposes.
IS:1597- Code of practice for construction of stone masonry: Part 1 Rubble stone masonry
IS:1661 - Code of practice for application of cement and cement-lime plaster finishes
IS:1834 - Specification for hot applied sealing compound for joint in concrete
IS:1838- Specification for preformed fillers for expansion joint in concrete Pavements and
structures (none extruding and resilient type): Part 1 Bitumen impregnated fiber.
IS:1948 - Specification for aluminum doors, windows and ventilators
IS:1949 - Specification for aluminum windows for industrial buildings
IS:2074 - Ready mixed paint, air drying, red oxide- zinc chrome, priming
IS:2114 - Code of practice for laying in-situ terrazzo floor finish
IS:2116 - Specification for sand for masonry mortars
IS:2185 - Specification for concrete masonry units (Parts 1,2& 3)
IS:2202 - Specification for wooden flush door shutters (Solid core type): Parts 1&2
IS:2212 - Code of practice for brickwork
IS:2250 - Code of practice for preparation and use of masonry mortars
IS:2338 - Code of practice for finishing of wood and wood-based materials (Parts 1 & 2)
IS: 2395- Code of practice for painting concrete, masonry and plaster surfaces (Parts 1 & 2)
IS:2402 - Code of practice for external rendered finishes
IS:2571 - Code of practice for laying in-situ cement concrete flooring
IS:2572 - Code of practice for construction of hollow concrete block masonry
IS:2645 - Specification of integral cement waterproofing compounds
IS:2690 - Specification for burnt clay flat terracing tiles: Part 1 Machine made
IS:2691 - Specification for burnt clay facing bricks
IS:2750 - Specification for steel scaffoldings
IS:2835 - Flat transparent sheet glass
IS:2932 - Specification for enamel, synthetic, exterior type (a) undercoating,(b) finishing
IS:3007- Code of practice for laying of asbestos cement sheets - corrugated and
(Part 1 & 2) semi-corrugated sheets
IS:3067 - Code of practice of general design details and preparatory work for
Damp-proofing and water- proofing of buildings
IS:3068- Specification for broken brick (burnt clay) coarse aggregates for use in Lime concrete.
IS:3384 - Specification for bitumen primer for use in water-proofing and damp-proofing
IS:3462 - Specification for unbaked flexible PVC flooring
IS:3495 - Method of test for burnt clay building bricks: Part 1 to
IS:3536 - Specification for ready mixed paint, brushing, and wood primer, pink
IS:3696 - Safety code of scaffolds and ladders (Parts 1 & 2)
IS:4020 - Methods of test for wooden flush door: Type test
IS:4021 - Specification for timber door, window and ventilator frames
IS:4351 - Specification for steel door frames
IS:4443 - Code of practice for use of resin type chemical resistant mortars
IS:4457 - Specification for ceramic unglazed vitreous acid resisting tile
IS:4631 - Code of practice for laying epoxy resin floor toppings
IS:4832 - Specification for chemical resistant mortars (Part II)
IS:4860 - Specification for acid resistant bricks
IS:4948 - Specification for welded steel wire fabric for general use
IS:5318 - Code of practice for laying of flexible PVC sheet and tile flooring
IS:5410 - Cement paint, color as required
IS:5411 - Specification for plastic emulsion paint (Parts 1 & 2)
IS:5437 - Wired and figured glass
IS:5491 - Code of practice for laying of in-situ granolithic concrete floor topping
IS:6042 - Code of practice for construction of light weight concrete block masonry
IS:6248 - Specification for metal rolling shutters and rolling grilles
IS:7193 - Specification for glass fiber base coal tar pitch and bitumen felts
IS:7452 - Specification for hot rolled steel sections for doors, windows and Ventilators
IS:8042 - Specification for white Portland cement
IS:9197- Specification for epoxy resin, hardeners and epoxy resin composites for floor topping
IS:9862 Specification for ready mixed paint, brushing, bituminous, black, lead-free, acid,
alkali, water and chlorine resisting
IS:12200- Code of practice for provision of water stops at transverse contraction
joints in masonry and concrete dams
➢ Bricks used in the works shall conform to the requirements laid down in IS: 1077. The class of
the bricks shall be as specifically indicated in the respective items of work.
➢ The nominal size of the modular brick shall be 200 mm x 100 mm x 100 mm with the
permissible tolerances over the actual size of 190mm x90 mm x 90 mm as per IS: 1077. The
nominal thickness of one brick and half brick walls using modular bricks shall be considered
as 200 mm and 100 mm respectively. In the event of use of traditional bricks of nominal size
230 mmx115mmx75mm with tolerance up to ±3 mm in each dimension, one brick and half
brick walls shall be considered as 230 mm and 115 mm respectively.
➢ Bricks shall be sound, hard, and homogenous in texture, well burnt in kiln without being
vitrified, hand/machine mounded, deep red, cherry or copper colored, of regular shape and
size & shall have sharp and square edges with smooth rectangular faces. The bricks shall be
tested from approved laboratory and free from pores, cracks, flaws and nodules of free lime.
Hand moulded bricks shall be moulded with a frog and those made by extrusion process may
not be provided with a frog. Bricks shall give a clear ringing sound when struck and shall have
a minimum crushing strength of 3N/sq.mm unless otherwise specified in the Items of work
prepared by the Contractor.
➢ The average water absorption shall not be more than 20 percent by weight up to class
and 15 percent by weight for higher classes. Bricks which do not conform to this requirement
shall be rejected. Over or under burnt bricks are not acceptable for use in the works. Sample
bricks shall be submitted to the GWIL for approval and bricks supplied shall conform to
approved samples. If demanded by GWIL, brick samples shall be got tested as per IS: 3495 by
Contractor. Bricks rejected by GWIL shall be removed from the site of works within 24 hours.
➢ Mortar for brick masonry shall consist of cement and sand and shall be prepared as per IS:
2250. Mix shall be in the proportion of 1:5 for brickwork of thickness one brick or above and
1:4 for brickwork of thickness half brick or below, unless otherwise specified in the respective
items of work prepared by the Contractor. Sand for masonry mortar shall conform to IS:218.
The sand shall be free from clay, shale, loam, alkali and organic matter and shall be of sound,
hard, clean and durable particles. Sand shall be approved by GWIL. If so directed by the GWIL,
sand shall be screened and washed till it satisfies the limits of deleterious materials.
➢ For preparing cement mortar, the ingredients shall first be mixed thoroughly in dry condition.
Water shall then be added and mixing continued to give a uniform mix of required consistency.
Mixing shall be done thoroughly in a mechanical mixer, unless hand mixing is specifically
permitted by the GWIL. The mortar thus mixed shall be used as soon as possible, preferably
within 30 minutes from the time water is added to cement. In case, the mortar has stiffened
due to evaporation of water, this may be re-tempered by adding water as required to restore
consistency, but this will be permitted only up to 30 minutes from the time of initial mixing
of water to cement. Any mortar which is partially set shall be rejected and shall be removed
from the site. Droppings of mortar shall not be re-used under any circumstances. The
Contractor shall arrange for test on mortar samples if so directed by the GWIL.
➢ Workmanship of brick work shall conform to IS: 2212. All bricks shall be thoroughly soaked in
clean water for at least one hour immediately before being laid. The cement mortar for brick
masonry work shall be as specified in the respective item of work prepared by the Contractor.
Brick work 200mm/230mm thick and over shall be laid in English Bond unless otherwise
specified. 100mm/115mm thick brickwork shall be laid with stretchers. For laying bricks, a
layer of mortar shall be spread over the full width of suitable length of the lower course. Each
brick shall be slightly pressed into the mortar and shoved into final position so as to embed
the brick fully in mortar. Only full-size bricks shall be used for the works and cut bricks utilized
only as closers to make up required wall length or for bonding. Bricks shall be laid with frogs
➢ All brickwork shall be plumb, square and true to dimensions shown. Vertical joints in alternate
courses shall come directly one over the other and be in line. Horizontal courses shall be
leveled. The thickness of brick courses shall be kept uniform. In case of one brick thick or half
brick thick wall, at least one face should be kept smooth and plane, even if the other is slightly
rough due to variation in size of bricks. For walls of thickness greater than one brick both
faces shall be kept smooth and plane. All interconnected brickwork shall be carried out at
nearly one level so that there is uniform distribution of pressure on the supporting structure
and no portion of the work shall be left more than one course lower than the adjacent work.
Where this is not possible, the work shall be raked back according to bond (and not saw
toothed) at an angle not exceeding 45 deg. But in no case the level difference between
adjoining walls shall exceed one meter. Brickwork shall not be raised more than one meter
➢ Bricks shall be so laid that all joints are well filled with mortar. The thickness of joints shall
not be less than 6 mm and not more than 10 mm. The face joints shall be raked to a minimum
depth of 10mm/15mm by raking tools during the progress of work when the mortar is still
green, so as to provide a proper key for the plastering/ pointing respectively to be done later.
When plastering or pointing is not required to be done, the joints shall be uniform in thickness
and be struck flush and finished at the time of laying. The face of brickwork shall be cleaned
daily and all mortar droppings removed. The surface of each course shall be thoroughly
cleaned of all dirt before another course is laid on top. During inclement weather conditions,
newly built brick masonry works shall be protected by tarpaulin or other suitable covering to
prevent mortar being washed away by rain.
➢ Brickwork shall be kept constantly moist on all the faces for at least seven days after 24 hrs
of laying. The arrangement for curing shall be got approved from the E.I.C.
➢ Double scaffolding having two sets of vertical supports shall be provided to facilitate execution
of the masonry works. The scaffolding shall be designed adequately considering all the dead,
live and possible impact loads to ensure safety of the workmen, in accordance with the
requirements stipulated in IS:2750 and IS:3696(Part I).
➢ Scaffolding shall be properly maintained during the entire period of construction. Single
scaffolding shall not be used on important works and will be permitted only in certain cases
as decided by the GWIL. Where single scaffolding is adopted, only minimum number of holes,
by omitting a header shall be left in the masonry for supporting horizontal scaffolding poles.
All holes in the masonry shall be carefully made good before plastering/pointing.
➢ In the event of usage of traditional bricks of size 230 mm x115mm x75mm, the courses at the
top of the plinth and sills as well as at the top of the wall just below the roof/floor slabs and
at the top of the parapet shall be laid with bricks on edge. All brickwork shall be built tightly
against columns, floor slabs or other structural members.
➢ To overcome the possibility of development of cracks in the brick masonry following measures
shall be adopted. For resting RCC slabs, the bearing surface of masonry wall shall be finished
on top with 12 mm thick cement mortar 1:3 and provided with 2 layers of Kraft paper Grade
1 as per IS:1397 or 2 layers of 50-micron thick polyethylene sheets.
➢ RCC/ steel beams resting on masonry wall shall be provided with reinforced concrete bed
blocks of 50 mm thickness, projecting 50mm on either side of the beam, duly finished on top
with 2 layers of Kraft paper Grade 1 as per IS:1397 or 2 layers of 50-micron thick polyethylene
➢ Steel wire fabric shall be provided at the junction of brick masonry and concrete before taking
up plastering work. Bricks for partition walls shall be stacked adjacent to the structural
member to pre-deflect the structural member before the wall is taken up for execution.
Further, the top most course of half or full brick walls abutting against either a de-shuttered
slab or beam shall be built only after any proposed masonry wall above the structural member
is executed to cater for the deflection of the structural element.
➢ Reinforced cement concrete transoms and mullions of dimensions as indicated in the
construction Drawings to be prepared by the Contractor are generally required to be provided
in the half brick partition walls.
➢ Where the drawings prepared by the Contractor indicate that structural steel sections are to
be encased in brickwork, the brickwork masonry shall be built closely against the steel section,
ensuring a minimum of 20mm thick cement-sand mortar 1:4 over all the steel surfaces. Steel
sections partly embedded in brickwork shall be provided with bituminous protective coating
to the surfaces at the point of entry into the brick masonry.
➢ Facing bricks of the type specified conforming to IS: 2691 shall be laid in the positions
indicated on the Drawings prepared by the Contractor and all facing brickwork shall be well
bonded to the backing bricks/RCC surfaces. The level of execution of the facing brickwork
shall at any time be lower by at least 600 mm below the level of the backing brickwork. Facing
bricks shall be laid over 10 mm thick backing of cement mortar. The mortar mix, thickness of
joint and the type of pointing to be carried out shall be as specified in the item of works
prepared by the Contractor. The pattern of laying the bricks shall be as specifically indicated
in the Drawings prepared by the Contractor. For facing brickwork, double scaffolding shall be
used. Faced works shall be kept clean and free from damage, discoloration etc., at all times.
Uncoursed Random Rubble Masonry, in Foundation, Plinth and Superstructure.
➢ Stones for the works shall be of the specified variety, which are hard, durable, fine grained
and uniform in color (for superstructure work) free from veins, flaws and other defects.
Quality and work shall conform to the requirements specified in IS: 1597 (Part-I). The
percentage of water absorption shall not exceed 5 percent as per test conducted in
accordance with IS: 1124. The Contractor shall supply sample stones to the GWIL for approval.
Stones shall be laid with its grains horizontal so that the load transmitted is always
perpendicular to the natural bed.
➢ Cement-sand mortar for stone masonry works shall be in the proportion of 1:6.
➢ Materials and preparation of mortar shall be as specified above.
➢ For All Works below ground level the masonry shall be random rubble uncoursed with ordinary
quarry dressed stones for the hearting and selected quarry dressed stones for the facing.
➢ For all works above ground level and in superstructure the masonry shall be random rubble
uncoursed, well bonded, faced with hammer dressed stones with squared quoins at corners.
The bushings on the face shall not be more than 40 mm on an exposed face and on the face
to be plastered it shall not project by more than 12 mm nor shall it have depressions more
than 10 mm from the average wall surface.
➢ Face stones shall extend back sufficiently and bond well with the masonry. The depth of
stone from the face of the wall inwards shall not be less than the height or breadth at the
face. The length of the stone shall not exceed three times the height and the breadth on
base shall not be greater than three-fourths the thickness of wall nor less than 150 mm. The
height of stone may be up to a maximum of 300 mm. Face stones or hearting stones shall
not be less than 150 mm in any direction. Chips and spalls shall be used wherever necessary
to avoid thick mortar joints and to ensure that no hollow spaces are left in the masonry. The
use of chips and spalls in the hearting shall not exceed 20 percent of the quantity of stone
masonry. Spalls and chips shall not be used on the face of the wall and below hearting stones
to bring them to the level of face stones.
➢ The maximum thickness of joints shall not exceed 20 mm. All joints shall be completely filled
with mortar. When plastering or pointing is not required to be done, the joints shall be struck
flush and finished as the work proceeds. Otherwise, the joints shall be raked to a minimum
depth of 20 mm by a raking tool during the progress of the work while the mortar is still
➢ Through or bond stones shall be provided in walls up to 600 mm thick and in case of walls
above 600 mm thickness, a set of two or more bond stones overlapping each other by at least
150 mm shall be provided in a line from face to back. In case of highly absorbent types of
stones (porous lime stone and sand stone, etc.) the bond stone shall extend about two-thirds
into the wall and a set of two or more bond stones overlapping each other by at least
mm shall be provided. Each bond stone or a set of bond stones shall be provided for every
0.5 sq.m of wall surface.
➢ All stones shall be sufficiently wetted before laying to prevent absorption of water from the
mortar. All connected walls in a structure shall be normally raised uniformly and regularly.
However, if any part of the masonry is required to be left behind, the wall shall be raked
back (and not saw toothed) at an angle not exceeding 45deg. Masonry work shall not be
raised by more than one meter per day. Green work shall be protected from rain by suitable
covering. Masonry work shall be kept constantly moist on all the faces for a minimum period
of seven days for proper curing of the joints.
Coursed Rubble Masonry (First Sort) for Superstructure:
The Material specification for the work shall be as specified above.
➢ All Courses shall be laid truly horizontal and shall be of the same height in any course. The
height of course shall not be less than 150 mm and not more than 300 mm. The width of
stone shall not be less than its height.
➢ Face stones shall tail into the work for not less than their height and at least 1/3rd the
number of stones shall tail into the work for a length not less than twice their height but not
more than three-fourths the thickness of the wall whichever is smaller. These should be laid
as headers and stretchers alternately to break joints by at least 75 mm.
➢ The face stones shall be squared on all joints and beds; the bed joints being hammer or
chisel dressed true and square for at least 80 mm back from the face and the side joints for
at least 40 mm. The face of the stone shall be hammer dressed so that the bushing shall not
be more than 40 mm on an exposed face and 10 mm on a face to be plastered. No portion
of the dressed surface shall show a depth of gap more than 6 mm from a straight edge placed
on it. The remaining unexposed portion of the stone shall not project beyond the surface of
bed and side joints. No spalls or pinning shall be allowed on the face.
➢ All bed joints shall be horizontal and side joints shall be vertical and no joints shall be more
than 10 mm in thickness. When plastering or pointing is not required to be done, the joints
shall be struck flush and finished as the work proceeds. Otherwise, the joints shall be raked
to a minimum depth of 20 mm by a raking tool, during the progress of the work while the
mortar is still green.
➢ Hearting shall consist of flat bedded stones carefully laid on their proper beds and solidly
bedded in mortar. The use of chips shall be restricted to the filling of interstices between
the adjacent stones in hearting and these shall not exceed 10 percent of the quantity of the
stone masonry. Care shall be taken so that no hollow spaces are left anywhere in the
➢ The requirement regarding through or bond stones shall be as specified in clause 7.3.2 with
the further stipulation that these shall be provided at 1.5 m to 1.8m apart clear in every
course but staggered at alternate courses.
➢ The quoins which shall be of the same height as the course, in which they occur, shall not
be less than 450 mm in any direction. Quoin stones shall be laid as stretchers and headers
alternately. They shall be laid square on their beds, which shall be rough chisel dressed to a
depth of at least 100 mm from the face. These stones shall have a minimum uniform chisel
draft of 25mm width at four edges, all the edges being in the same plane.
Concrete Block Masonry:
➢ Masonry units of hollow and solid concrete blocks shall conform to the requirements of IS:
2185 (Part I). Masonry units of hollow and solid light-weight concrete blocks shall conform
to the requirements of IS: 2185 (Part 3). Masonry units of autoclaved cellular concrete blocks
shall conform to the requirements of IS:2185 (Part 3). The height of the concrete masonry
units shall not exceed either its length or six times its width.
➢ The nominal dimensions of concrete block shall be as under.
Length 400, 500 or 600 mm
Height 100 or 200 mm
Width 100 to 300 mm in 50 mm increments
➢ Half blocks shall be in lengths of 200, 250 or 300mm to correspond to the full-length
➢ blocks. Actual dimensions shall be 10mm short of the nominal dimensions.
➢ The maximum variation in the length of the units shall not be more than ±5 mm and maximum
variation in height or width of the units shall not be more than ± 3mm.
➢ Concrete blocks shall be either hollow blocks with open or closed cavities or solid blocks.
Concrete blocks shall be sound, free of cracks, chipping or other defects which impair the
strength or performance of the construction. Surface texture shall as specify. The faces of
the units shall be flat and rectangular, opposite faces shall be parallel and all arises shall be
➢ The bedding surfaces shall be at right angles to the faces of the block.
➢ The concrete mix for the hollow and solid concrete blocks/light weight concrete blocks shall
not be richer than one part of cement to six parts of combined aggregates by volume.
Concrete blocks shall be of approved manufacture, which satisfy the limitations in the values
of water absorption, drying shrinkage and moisture movement, as specified for the type of
block as per relevant IS code. Contractor shall furnish the test certificates and also supply
the samples for the approval of GWIL.
➢ The type of the concrete block, thickness and grade based on the compressive strength for
use in load bearing and/or non-load bearing walls shall be as specified. The minimum nominal
thickness of non-load bearing internal walls shall be 100mm. The minimum nominal thickness
of external panel walls in framed construction shall be 200 mm.
➢ The workmanship shall generally conform to the requirements of IS:2572 for concrete block
masonry, IS:6042 for light weight concrete block masonry and IS:6041 for autoclaved cellular
concrete block masonry works.
➢ From considerations of durability, generally concrete block masonry shall be used in
superstructure works above the damp-proof course level.
➢ Concrete blocks shall be embedded with a mortar which is relatively weaker than the mix of
the blocks in order to avoid the formation of cracks. Cement mortar of proportion 1:6 shall
be used for the works. Preparation of mortar shall be as specified above.
➢ Thickness of both horizontal and vertical joints shall be 10mm. The first course shall be laid
with greater care, ensuring that it is properly aligned, leveled and plumb since this will
facilitate in laying succeeding courses to obtain a straight and truly vertical wall. For the
horizontal (bedding) joint, mortar shall be spread over the entire top surface of the block
including front and rear shells as well as the webs to a uniform layer of 10mm. For vertical
joints, the mortar shall be applied on the vertical edges of the front and rear shells of the
blocks. The mortar may be applied either to the unit already placed on the wall or on the
edges of the succeeding unit when it is standing vertically and then placing it horizontally,
well pressed against the previously laid unit to produce a compacted vertical joint. In case
of two cell blocks with slight depression on the vertical sides these shall also be filled up
with mortar to secure greater lateral rigidity. To assure satisfactory bond, mortar shall not
be spread too far ahead of actual laying of the block as the mortar will stiffen and lose its
plasticity Mortar while hardening shrinks slightly and thus pulls away from the edges of the
block. The mortar shall be pressed against the units with a jointing tool after it has stiffened
to effect intimate contact between the mortar and the unit to obtain a weather tight joint.
The mortar shall be raked to a depth of 10mm as each course is laid to ensure good bond for
➢ Dimensional stability of hollow concrete blocks is greatly affected by variations of moisture
content in the units. Only well dried blocks should be used for the construction. Blocks with
moisture content more than 25% of maximum water absorption permissible shall not be used.
The blocks should not be wetted before or during laying in the walls. Blocks should be laid
dry except slightly moistening their surfaces on which mortar is to be applied to obviate
absorption of water from the mortar.
➢ As per the design requirements and to effectively control cracks in the masonry, RCC bound
beams/studs, joint reinforcement shall be provided at suitable locations. Joint
reinforcement shall be fabricated either from mild steel wires conforming to IS:280 or
welded wire fabric/high strength deformed basis.
➢ For jambs of doors, windows and openings, should concrete blocks shall be provided. If
hollow units are used, the hollows shall be filled with concrete of mix 1:3:6. Hold fasts of
doors/windows should be arranged so that they occur at block course level.
➢ At intersection of walls, the courses shall be laid up at the same time with a true masonry
bond between at least 50% of the concrete blocks. The sequence for construction of partition
walls and treatment at the top of load bearing walls for the RCC slab shall be as for the
brick work. Curing of the mortar joints shall be carried out for at least 7 days. The walls
should only be lightly moistened and shall not be allowed to become excessively wet. Double
scaffolding as per clause shall be adopted for execution of block masonry work. Cutting of
the units shall be restricted to a minimum. All horizontal and vertical dimensions shall be in
respectively, adopting modular co-ordination for walls, opening locations for doors, windows
➢ Concrete blocks shall be stored at site suitably to avoid any contact with moisture from the
ground and covered to protect against wetting.
Damp - Proof Course:
Materials and Workmanship:
➢ Where Specified, all the walls in a building shall be provided with damp-proof course cover
at plinth to prevent water from rising up the wall. The damp-proof course shall run without
a break throughout the length of the wall, even under the door or other openings. Damp-
proof course shall consist of 50 mm thick cement concrete of 1:2:4 nominal mix with
approved water-proofing compound admixture conforming to IS: 2645 in proportion as
directed by the manufacturer. Concrete shall be with 10 mm downgraded coarse aggregates.
➢ The surface of brick work/stone masonry work shall be leveled and prepared before laying
the cement concrete. Side shuttering shall be properly fixed to ensure that slurry does not
leak through and is also not disturbed during compaction. The upper and side surface shall
be made rough to afford key to the masonry above and to the plaster.
➢ Damp-proof course shall be cured properly for at least seven days after which it shall be
allowed to dry for taking up further work.
Miscellaneous Inserts, Bolts etc.
➢ All the miscellaneous inserts such as bolts, pipes, plate embedment etc., shall be accurately
installed in the building works at the correct location and levels, all as detailed in the
construction Drawings to be prepared by the Contractor. Contractor shall prepare and use
templates for this purpose, if so directed by the GWSSB. In the event, of any of the inserts
are improperly installed, Contractor shall make necessary arrangements to remove and
reinstall at the correct locations/levels, all as directed by the GWSSB.
Wood Work for Doors, Windows, Ventilators & Partitions
➢ Timber to be used shall be first class Teak wood as per IS:4021. Timber shall be of the best
quality and well seasoned by a suitable process before being planed to the required sizes.
The maximum permissible moisture content shall be from 10 to 16 percent for timber 50mm
and above in thickness and 8 to 14 percent of timber less than 50mm in thickness for different
regions of the country as stipulated in IS:287. Timber shall be close grained, of uniform color
and free from decay, fungal growth, boxed heart, pitch pockets or streaks on the exposed
edges, borer holes, splits and cracks.
➢ Flush door shutters of the solid core type with plywood face panels shall conform to IS:2202
(Part 1) and with particle board/hard board face panels shall conform to IS:2202 (Part 2).
➢ Transparent sheet glass shall conform to the requirements of IS:2835. Wired and figured
glass shall be as per IS:5437.
➢ Builder’s hardware for fittings and fixtures shall be of the best quality from approved
➢ The workmanship and finish of wood work in doors, windows, ventilators and partitions shall
be of a very high order. Contractor shall ensure that work is executed in a professional
manner by skilled carpenters for good appearance, efficient and smooth operation of the
➢ All works shall be executed as per the detailed Drawings prepared by the Contractor and/or
as directed by the GWIL.
➢ All members of the door, window, and ventilator shall be straight without any warp or bow
and shall have smooth well-planned faces. The right angle shall be checked from the inside
surfaces of the respective members of the frame. Frames shall have mortise and tenon joints
which shall be treated with an approved adhesive and provided with metal or wood pins.
The vertical members of the door frame shall project 50 mm below the finished floor level.
The finished dimension of frames shall be rebated on the solid for keying with the plaster
and for receiving the shutters. The depth of rebate for housing the shutter shall be 15 mm.
The size of the frames shall be as specified in the respective items of work prepared by the
Contractor. The workmanship shall generally conform to the requirements specified in
➢ The face of the frames abutting the masonry or concrete shall be provided with a coat of
➢ Three hold fasts using 25 mm x 6 mm mild steel flats 225 mm long with split ends shall be
fixed on each side of door and window frames, one at the center and the other two at
mm from the top and bottom of the frame. For window and ventilator frames less than 1 m
in height, two hold fasts on each side shall be fixed at quarter points.
➢ Timber paneled shutters for doors, windows and ventilators shall be constructed in the form
of framework of stiles and rails with panel insertion. The panels shall be fixed by either
providing grooves in the stiles and rails or by beading. Glazing bars shall be as detailed in
the Drawings prepared by the Contractor. The stiles and rails shall be joined by mortise and
tenon joints at right angles. All members of the shutter shall be straight without any warp
or bow and shall have smooth, well planed faces at right angles to each other. The right
angle for the shutter shall be checked by measuring the diagonals and the difference shall
not be more than ±3 mm. Timber panels made from more than one piece shall be jointed
with a continuous tongued and grooved joint, glued together and reinforced with metal
➢ The workmanship shall generally conform to the requirements specified in IS: 1003 (Parts
& 2). The thickness of the shutter, width/thickness of the stiles/rails/panel type shall be as
specified. Marine plywood panels conforming to IS:710 shall be used for doors where
➢ Details of the wooden flush door shutters, solid core type with specific requirement of the
thickness, core, face panels, viewing glazed panel, Venetian louver opening, teak wood
lapping etc. shall be as specified. Panels of shutter shall be of marine plywood conforming
to IS:710. Flush door shutters shall be from reputed manufacturers and Contractor shall
submit test results as per IS:4020, if so desired by the GWIL.
➢ Glazing of door, window, ventilator and partitions shall be with either flat transparent sheet
glass, wired or figured glass. Transparent sheet glass shall be of 'B' quality as per IS: 2835.The
thickness and type of glazing to be provided shall be as specified.
➢ The material of the fittings and fixtures either of chromium plated steel, cast brass, copper
oxidized or anodized aluminum shall be as specified. The number, size and type of the
fittings and fixtures shall be as specified.
➢ Woodwork shall not be provided with the finishes of painting/varnishing etc. unless it has
been approved by the GWIL. The type of finish and the number of coats shall be as stipulated
in the respective items of work prepared by the Contractor. Preparation of the wood surfaces
and application of the finishes shall be in accordance with clause 7.32.
➢ Wooden hand railing and architraves shall be of the size and shape with the fixing
arrangement as indicated in the Drawings prepared by the Contractor.
➢ The framework of the partitions with mullions and transoms shall be with the sections of
dimensions as specified. Panels of double/single glazing/plywood shall be fixed as per details
specified. Partitions shall be fixed rigidly between the floor and structural columns/beams
including provision of necessary shims for wedging etc. Finished work shall be of rigid
construction, erected truly plumb to the lines and levels, at locations as per the construction
Drawings prepared by the Contractor.
➢ Any carpentry work which shows defects due to inadequate seasoning of the timber or bad
workmanship shall be removed and replaced by Contractor with work as per Specifications.
Steel Doors, Windows and Ventilators:
➢ Hot rolled steel sections for the fabrication of steel doors, windows and ventilators shall
conform to IS: 7452, which are suitable for, single glazing.
➢ Pressed steel door frames for steel flush doors shall be out of 1.25mm thick mild steel sheets
of profiles as per IS:
➢ Transparent sheet glass shall conform to the requirements of IS:
➢ Wired and figured glass shall be as per IS:
➢ Builder’s hardware of fittings and fixtures shall be of the best quality from the approved
➢ All steel doors, windows and ventilators shall be of the type as specified in the respective
items of work prepared by the Contractor and of sizes as indicated in the Drawings prepared
by the Contractor prepared by the Contractor. Steel doors, windows and ventilators shall
conform to the requirements as stipulated in IS: 1038. Steel windows shall conform to IS:
1361, if so specified.
➢ Doors, windows and ventilators shall be of an approved manufacture. Fabrication of the unit
shall be with rolled section, cut to correct lengths and metered. Corners shall be welded to
form a solid fused welded joint conforming to the requirements of IS: 1038. Tolerance in
overall dimensions shall be within ±1.5mm. The frames and shutters shall be free from wrap
or buckle and shall be square and truly plain. All welds shall be dressed flush on exposed and
contact surfaces. Punching of holes, slots and other provisions to install fittings and fixtures
later shall be made at the correct locations as per the requirements. Samples of the units
shall be got approved by the GWIL before further manufacture/purchase by the Contractor.
➢ Type and details of shutters, hinges, glazing bar requirement, couplings, locking
arrangement, fittings and fixtures shall be as described in the respective items of work and
/ or as shown in the Drawings prepared by the Contractor for single or composite units.
➢ For windows with fly proof mesh as per the item of work prepared by the Contractor, rotor
operator arrangement, for the operation of the glazed shutters from the inside shall be
➢ Pressed steel door frames shall be provided with fixing lugs at each jamb, hinges, lock-strike
plate, mortar guards, angle threshold, shock-absorbers of rubber or similar material as per
the requirements of IS: 4351. Pressed steel doorframes shall be fixed as `built-in’ as the
masonry work proceeds. After placing it plumb at the specified location, masonry walls shall
be built up solid on either side or each course grouted with mortar to ensure solid contact
with the doorframe, without leaving any voids. Temporary struts across the width shall be
fixed, during erection to prevent bow/sag of the frame. Door shutters of flush welded
construction shall be 45 mm thick, fabricated with two outer skills of 1.25mm thick steel
sheets, 1mm thick steel sheet stiffeners and steel channels on all four edges. Double shutters
shall have meeting stile edge beveled or rebated. Provision of glazed viewing panel, louvers
shall be made as per the items of works and/or Drawings prepared by the Contractor.
Shutters shall be suitably reinforced for lock and other surface hardware and to prevent
sagging/twisting. Single sheet steel door shutters shall be fabricated out of 1.25mm thick
steel sheets, mild steel angles and stiffeners as per the Drawings prepared by the Contractor.
➢ Doors, windows and ventilators shall be fixed into the prepared openings. They shall not be
‘built-in’ as the masonry work proceeds, to avoid distortion and damage of the units. The
dimensions of the masonry opening shall have 10mm clearance around the overall dimensions
of the frame for this purpose. Any support of scaffolding members on the frames/glazing
bars is prohibited.
➢ Glazing of the units shall be either with flat transparent glass or wired / figured glass of the
thickness as specified in the items of works prepared by the Contractor. All glass panels shall
have properly squared corner and straight edges. Glazing shall be provided on the outside of
➢ Fixing of the glazing shall be either with spring glazing clips and putty conforming to IS:419
or with metal beads. Pre-formed PVC or rubber gaskets shall be provided for fixing the beads
with the concealed screws. The type of fixing the glazing shall be as indicated in the items
of work and/or in Drawings prepared by the Contractor.
➢ Steel doors, windows and ventilators shall be provided with finish of either painting as
specified or shall be hot dip galvanized with thickness of the zinc coating as stipulated all as
described in the respective items of works prepared by the Contractor.
➢ The material of the Builders hardware of fittings and fixtures of chromium plated steel, cast
brass, brass copper oxidized or anodized aluminum shall be as specified in the items of works
prepared by the Contractor. The number, size and type of fittings and fixtures shall be as in
the Drawings /items of works prepared by the Contractor.
➢ Installation of the units with fixing lugs, screws, mastic caulking compound at the specified
locations shall generally conform to the requirements of IS:1081. Necessary holes etc
required for fixing shall be made by the Contractor and made good after installation.
Workmanship expected is of a high order for efficient and smooth operation of the units.
Aluminum Doors, Windows, Ventilators & Partitions:
➢ Aluminum alloy used in the manufacture of extruded sections for the fabrication of doors,
windows, ventilators shall conform to designation HE9-WP of IS:733.
➢ Transparent sheet glass shall conform to the requirements of IS:2835. Wired and figured
glass shall be as per IS:5437.
➢ Builder's hardware of fittings & fixtures shall be of the best quality from approved
➢ All aluminum doors, windows, ventilators and partitions shall be of the type and size as
specified. The doors, windows, ventilators shall conform to the requirements of IS:1948.
Aluminum windows shall conform to IS:1949, if so specified.
➢ All aluminum units shall be supplied with anodized finish. The minimum anodic film thickness
shall be 0.015 mm. Doors, windows and ventilators shall be of an approved manufacture.
Fabrication of the units shall be with the extruded sections, cut to correct lengths, mitered
and welded at the corners to a true right angle conforming to the requirements of IS:1948.
Tolerance in overall dimensions shall be within ± 1.5mm. The frames and shutters shall be
free from warp or buckle and shall be square and truly plane. Punching of holes, slots and
other provisions to install fittings or fixtures later shall be made at the correct locations, as
per the requirements. Aluminum swing type doors, aluminum sliding windows, partitions
shall be as specified.
➢ IS:1948 and IS:1949 referred to incorporates the sizes, shapes, thicknesses and weight per
running meter of extruded sections for the various components of the units. However, new
sizes, shapes, thicknesses with modifications to suit snap-fit glazing clips etc. are being
continuously being added by various leading manufacturers of extruded sections, which are
available in the market. As such, the sections of the various components of the unit proposed
by the Contractor will be reviewed by the GWIL and will be accepted only if they are equal
to or marginally more than that given in the codes/as specified.
➢ The framework of the partitions with mullions and transom shall be with anodized aluminum
box sections. Anodized aluminum box sections shall be in-filled with timber of class 3 (silver
oak or any other equivalent) as per IS:4021. Panels of double/single glazing/plywood shall
be fixed as per details indicated in the Drawings to be prepared by the Contractor. Partitions
shall be fixed rigidly between the floor and the structural columns/beams including provision
of necessary shims for wedging etc. Finished work shall be of rigid construction, erected
truly plumb to the lines and levels, at locations as per the construction Drawings to be
prepared by the Contractor.
➢ Specific provisions as stipulated for steel doors, windows, ventilators under clause 7.9.2 shall
also be applicable for this item work. Glazing beads shall be of the snap-fit type suitable for
the thickness of glazing proposed as indicated in the items of works prepared by the
Contractor. A layer of clear transparent lacquer shall be applied on aluminum sections to
protect them from damage during installation. This lacquer coating shall be removed after
the installation is completed.
Steel Rolling Shutters:
Materials and Workmanship:
➢ Rolling shutters shall be of an approved manufacture, conforming to the requirements
specified in IS:6248.
➢ The type of rolling shutter shall be self-coiling type (manual) for clear areas up to 12 m2,
gear operated type (mechanical) for clear areas up to 35 m2 and electrically operated type
for areas up to 50 sq.m. Mechanical type of rolling shutters shall be suitable for operation
from both inside and outside with the crank handle or chain gear operating mechanism duly
considering the size of wall/column. Electrical type of rolling shutter shall also be provided
with a facility for emergency mechanical operation.
➢ Rolling shutters shall be supplied duly considering the type, specified clear width/height of
the opening and the location of fixing as indicated in the Drawings prepared by the
Contractor. Shutters shall be built up of interlocking laths 75 mm width between rolling
centers formed from cold rolled steel strips. The thickness of the steel strip shall not be less
than 0.90 mm for shutters up to 3.50m width and not less than 1.20 mm for shutters above
3.50 m width. Each lath section shall be continuous single piece without any welded joint.
The guide channels out of mild steel sheets of thickness not less than 3.15 mm shall be of
either rolled, pressed or built up construction. The channel shall be of size as stipulated in
IS:6248 for various clear widths of the shutters.
➢ Hood covers shall be of mild steel sheets not less than 0.90 mm thick and of approved shape.
Rolling shutters shall be provided with a central hasp and staple safety device in addition to
one pair of lever locks and sliding locks at the ends.
➢ All component parts of the steel rolling shutter (excepting springs and insides of guide
channels) shall be provided with one coat of zinc chrome primer conformity to IS:2074 at
the shop before supply. These surfaces shall be given an additional coat of primer after
erection at the site along with the number of coats and type of finish paint as specified in
the respective items of works prepared by the Contractor. Painting shall be carried out as
specified in specifications or as per engineer in charge direction.
➢ In case of galvanized rolling shutter, the lath sections, guides, lock plate, bracket plates,
suspension shaft and the hood cover shall be hot dip galvanized with a zinc coating containing
not less than 97.5 percent pure zinc. The weight of the zinc coating shall be at least
➢ Guide channels shall be installed truly plumb at the specified location. Bracket plate shall
be rigidly fixed with necessary bolts and holdfasts. Workmanship of erection shall ensure
strength and rigidity of rolling shutter for trouble free and smooth operation.
Rubble Sub-Base:
➢ Stones used for rubble packing under floors on grade, foundations etc., shall be clean, hard,
durable rock free from veins, flaws, laminations, weathering and other defects. Stones shall
generally conform to the requirements stipulated in IS: 1597 (Part I).
➢ Stones shall be as regular as can be obtained from quarries. Stones shall be of height equal
to the thickness of the packing proposed with a tolerance of 10 mm. Stones shall not have
a base area less than 250 sq cm nor more than 500 sq.cm, and the smallest dimension of any
stone shall not be less than half the largest dimension. The quality and size of stones shall
be subject to the approval of the GWSSB.
➢ Stones shall be hand packed carefully and laid with their largest base downwards resting flat
on the prepared sub-grade and with their height equal to the thickness of the packing. Stones
shall be laid breaking joints and in close contact with each other. All interstices between
the stones shall be wedged-in by small stones of suitable size, well driven in by crow bars
and hammers to ensure tight packing and complete filling-in of the interstices. The wedging
shall be carried out simultaneously with the placing in position of rubble packing and shall
not lag behind. After this, any interstices between the smaller wedged stones shall be
unfilled with clean hard sand by brooming so as to fill the joints completely.
➢ The laid rubble packing shall be sprinkled with water and compacted by using suitable
➢ The thickness and grade of concrete and reinforcement shall be as specified in items of
works prepared by the contractor.
➢ Before placing the blinding concrete, the sub-base of rubble packing shall be properly wetted
and rammed. Concrete for the base shall then be deposited between the forms, thoroughly
tamped and the surface finished level with the top edges of the forms. Two or three hours
after the concrete has been laid in position, the surface shall be roughened using steel wire
brush to remove any scum or laitance and swept clean so that the coarse aggregates are
exposed. The surface of the base concrete shall be left rough to provide adequate bond for
the floor finish to be provided later.
Terrazzo and Plain Cement Tiling Work:
➢ Terrazzo tiles and cement tiles shall generally conform in all respects to standards stipulated
in IS:1237. Tiles shall be of the best quality manufactured adopting hydraulic pressure of not
less than 14N/mm2.
➢ The type, quality, size, thickness color etc, of the tiles for flooring/dado/skirting shall be as
➢ The aggregates for terrazzo topping shall consist of marble chips which are hard, sound and
dense. Cement to be used shall be either ordinary Portland cement or white cement with or
without coloring pigment. The binder mix shall be with 3 parts of cement to 1 part of marble
powder by weight. The proportion of cement shall be inclusive of any pigments. For every
one part of cement-marble powder binder mix, the proportion of aggregates shall be
parts by volume, if the chips are between 1mm to 6mm and 1.50 parts by volume if the chips
are between 6mm to 25mm.
➢ The minimum thickness of wearing layer of terrazzo tiles shall be 5mm for tiles with chips
of size varying from 1mm up to 6mm or from 1mm up to 12mm. This shall be 6mm for tiles
with chips varying from 1mm up to 25mm. The minimum thickness of wearing layer of
cement/colored cement tiles shall be 5mm. This shall be 6mm for heavy duty tiles. Pigment
used in the wearing layer shall not exceed 10 percent of the weight of cement used in the
➢ Laying and finishing of tiles shall conform to the requirements of workmanship stipulated in
➢ Tiling work shall be commenced only after the door and window frames are fixed and
plastering of the walls/ ceiling is completed. Wall plastering shall not be carried out up to
about 50 mm above the level of proposed skirting/dado.
➢ The base concrete shall be finished to a reasonably plane surface about 40 to 45mm below
the level of finished floor. Before the tiling work is taken up, the base concrete or structural
slab shall be cleaned of all loose materials, mortar droppings, dirt, laitance etc. using steel
wire brush and well wetted without allowing any water pools on the surface. A layer of 25mm
average thickness of cement mortar consisting of one part of cement to 6 parts of sand shall
be provided as bedding for the tiles over the base concrete.
➢ The thickness of bedding mortar shall not be less than 10mm at any place. The quantity of
water to be added for the mortar shall be just adequate to obtain the workability for laying.
Sand for the mortar shall conform to IS:2116 and shall have minimum fineness modulus of
1.5. The surface shall be left rough to provide a good bond for the tiles.
➢ The bedding shall be allowed to harden for a day before laying of the tiles. Neat cement
slurry using 4.4 kg of cement per m2of floor area shall be spread over the hardened mortar
bedding over such an area at a time as would accommodate about 20 tiles.
➢ Tiles shall be fixed in this slurry one after the other, each tile being gently tapped with a
wooden mallet till it is properly bedded and in level with the adjoining tiles. The joints shall
be in straight lines and shall normally be 1.5mm wide.
➢ On completion of laying of the tiles in a room, all the joints shall be cleaned and washed
fairly deep with a stiff broom/wire brush to a minimum depth of 5mm. The day after the
tiles have been laid, the joints shall be filled with cement grout of the same shade as the
color of the matrix of the tile. For this purpose, white cement or grey cement with or without
pigments shall be used.
➢ The flooring should be kept moist and left undisturbed for 7 days for the bedding/joints to
set properly. Heavy traffic shall not be allowed on the floor for at least 14 days after fixing
➢ About a week after laying the tiles, each and every tile shall be lightly tapped with a small
wooden mallet to find out if it gives a hollow sound; if it does, such tiles along with any
other cracked or broken tiles shall be removed and replaced with new tiles to proper line
➢ The same procedure shall be followed again after grinding the tiles and all damaged tiles
replaced, properly jointed and finished to match. For the purpose of ensuring that such
replaced tiles match with those laid earlier, it is necessary that the Contractor shall procure
sufficient quantity of extra tiles to meet this contingency.
➢ Wherever a full tile cannot be provided, tiles shall be cut to size and fixed. Floor tiles
adjoining the wall shall go about 10mm under the plaster, skirting or dado.
➢ Tile skirting and dado work shall be executed only after laying tiles on the floor. For dado
and skirting work, the vertical wall surface shall be thoroughly cleaned and wetted.
Thereafter it shall be evenly and uniformly covered with 10mm thick backing of 1:4 cement
➢ For this work the tiles as obtained from the factory shall be of the size required and
practically full polished. The back of each tile to be fixed shall be covered with a thin layer
of neat cement paste and the tile shall then be gently tapped against the wall with a wooden
mallet. Fixing shall be done from the bottom of the wall upwards. The joints shall be in
straight lines and shall normally be 1.5mm wide. Any difference in the thickness of the tiles
shall be evened out in the backing mortar or cement paste so that the tile faces are in
conformity & truly plumb. Tiles for use at the corners shall be suitably cut with beveled
edges to obtain a neat and true joint. After the work has set, hand polishing with carbonado
stones shall be done so that the surface matches with the floor finish.
➢ Wall plastering of the strip left out above the level of skirting/dado shall be taken up after
the tiles are fixed.
➢ Chequered terrazzo tiles for flooring and for stair treads shall be delivered to site after the
first machine grinding.
➢ Machine grinding and polishing shall be commenced only after a lapse of 14 days of laying.
The sequence and three numbers of machine grinding operations, usage of the type of
carborundum stones, filling up of pin holes, watering etc. shall be carried out all as specified
➢ Tiles shall be laid to the levels specified. Where large areas are to be tiled the level of the
central portion shall be kept 10mm higher than that at the walls to overcome optical illusion
of a depression in the central portion. Localized deviation of ±3mm in any 3m length is
acceptable in a nominally flat floor.
In-Situ Terrazzo Work:
➢ The requirements of marble aggregates for terrazzo topping shall be as mentioned above.
➢ Cement shall first be mixed with the marble powder in dry state. The mix thus obtained shall
be mixed with the aggregates in the specified proportions. Care shall be taken not to get the
materials into a heap which results in the coarsest chips falling to the edges and cement
working to the center at the bottom.
➢ Materials shall be kept, as far as possible, in an even layer during mixing. After the materials
have been thoroughly mixed in the dry state, water shall be added, just adequate to obtain
plastic consistency for the desired workability for laying. The mix shall be used in the works
within 30 minutes of the addition of water to the cement.
➢ The thickness, type, quality, size and color of chips etc. for the in-situ terrazzo finish for
flooring/dado/ skirting shall be as specified in the respective items of works prepared by the
Contractor. Laying and finishing of in-situ work shall conform to the requirements of
workmanship stipulated in IS:
➢ In-situ terrazzo finish shall be laid over hardened concrete base. The finish layer consists of
an under layer and terrazzo topping. The under layer shall be of cement concrete of mix
1:2:4 using 10mm downgraded coarse aggregates. The combined thickness of under layer
and topping shall not be less than 30 mm for flooring and 20mm for dado/skirting work.
➢ The minimum thickness of topping shall be 6mm if chips used are between 1mm to 4mm,
9mm if chips are between 4mm to 7mm and 12mm if chips are between 7mm to 10mm. If
chips larger than 10mm size are used, the minimum thickness shall be one and one third the
maximum size of chips.
➢ Both the under layer and later the topping shall be divided into panels not exceeding 2 m2for
laying so as to reduce the possibility of development of cracks. The longer dimension of any
panel shall not exceed 2m. Dividing strips shall be used to separate the panels. When the
dividing strips are not provided, the bays shall be laid alternately, allowing an interval of at
least 24 hours between laying adjacent bays.
➢ Dividing strips shall be either of aluminum, brass or other material as indicated in the items
of works prepared by the Contractor. Aluminum strips should have a protective coating of
bitumen. The thickness of the strips shall not be less than 1.5mm and width not less than
25mm for flooring work.
➢ Concrete base shall be finished to a reasonably plane surface to a level below the finished
floor elevation equal to the specified thickness of terrazzo finish. Before spreading the under
layer, the base concrete surface shall be cleaned of all loose materials, mortar droppings,
dirt, laitance etc. and well wetted without allowing any water pools on the surface. Dividing
strips or screed strips, if dividing strips are not provided shall be fixed on the base and
leveled to the correct height to suit the thickness of the finish.
➢ Just before spreading the under layer the surface shall be smeared with cement slurry at
2.75 Kg/m2. Over this slurry, the under layer shall be spread and leveled with a screening
board. The top surface shall be left rough to provide a good bond for the terrazzo topping.
➢ Terrazzo topping shall be laid while the under layer is still plastic and normally between
to 24 hours after the under layer is laid. Cement slurry of the same color as the topping shall
be brushed on the surface immediately before laying is commenced.
➢ The terrazzo mix shall be laid to a uniform thickness and compacted thoroughly by tamping
and with a minimum of toweling. Straight edge and steel floats shall be used to bring the
surface true to the required level in such a manner that the maximum amount of marble
chips come up and spread uniformly all over the surface.
➢ The surface shall be left dry for air-curing for a period of 12 to 18 hours. Thereafter it shall
be cured by allowing water to stand in pools for a period of not less than 4 days.
➢ Machine grinding and polishing shall be commenced only after a lapse of 7 days from the
time of completion of laying. The sequence and four numbers of machine grinding
operations, usage of the type of carborundum stones, filling up of pinholes, wet curing,
watering etc. shall be carried out all as specified in IS:
Shahabad / Tandur/ Kota Stone Slab work:
➢ The slabs shall be of approved selected quality, hard, sound, dense and homogenous in
texture, free from cracks, decay, weathering and flaws. The percentage of water absorption
shall not exceed 5 percent as per test conducted in accordance with IS:
➢ The slabs shall be hand or machine cut to the required thickness. Tolerance in thickness for
dimensions of tile more than 100mm shall be ±5mm. This shall be ±2mm on dimensions less
than 100mm. Slabs shall be supplied to the specified size with machine cut edges or fine
chisel dressed to the full depth. All angles and edges of the slabs shall be true and square,
free from any chipping giving a plane surface. Slabs shall have the top surface machine
polished (first grinding) before being brought to site. The slabs shall be washed clean before
➢ The type, size, thickness and color/shade etc. of the slabs for flooring/dado/skirting shall
be as specified in the respective items of works prepared by the Contractor.
➢ Preparation of the concrete base, laying and curing shall be as mentioned above.
➢ Dado / skirting work shall be as per mentioned above. The thickness of the slabs for
dado/skirting work shall not be more than 25mm. Slabs shall be so placed that the back
surface is at a distance of 12mm. If necessary, slabs shall be held in position temporarily by
suitable method. After checking for verticality, the gap shall be filled and packed with
cement sand mortar of proportion 1:3. After the mortar has acquired sufficient strength, the
temporary arrangement holding the slab shall be removed.
➢ Grinding and polishing shall be as per mentioned above, except that first grinding with coarse
grade carborundum shall not be done and cement slurry with or without pigment shall not
applied before polishing.
Carborundum Tile Finish:
➢ Carborundum tiles shall generally conform in all respects to the standards stipulated in
IS:1237 for heavy duty tiles. Tiles shall be of the best quality manufactured adopting
hydraulic pressure of not less than 14 N/mm2.
➢ The topping shall be uniform and of thickness not less than 6mm. The quantity of
Carborundum grit shall be not less than 1.35 kg/sq.m used with cement with or without
pigment. The Carborundum grit shall pass through 1.18mm mesh and shall be retained on
➢ Requirements as detailed for terrazzo/cement tile finish as mentioned above shall be
applicable for Carborundum tile flooring.
Glazed Tile Finish:
➢ Glazed earthenware tiles shall conform to the requirements of IS: 777. Tiles shall be of the
best quality from an approved manufacturer. The tiles shall be flat, true to shape and free
from flaws such as crazing, blisters, pinholes, specks or welts. Edges and underside of the
tiles shall be free from glaze and shall have ribs or indentations for a better anchorage with
the bedding mortar. Dimensional tolerances shall be as specified in IS:
➢ The total thickness of glazed tile finish including the bedding mortar shall be 20 mm in
flooring/dado/skirting. The minimum thickness of bedding mortar shall be 12mm for flooring
and 10mm for dado/skirting work.
➢ The bedding mortar shall consist of 1 part of cement to 3 parts of sand mixed with just
sufficient water to obtain proper consistency for laying. Sand for the mortar shall conform
to IS: 2116 and shall have minimum fineness modulus of 1.5.
➢ Tiles shall be soaked in water for about 10 minutes just before laying. Where full size tiles
cannot be fixed, tiles shall be cut to the required size using special cutting device and the
edges rubbed smooth to ensure straight and true joints.
➢ Colored tiles with or without designs shall be uniform and shall be preferably procured from
the same batch of manufacture to avoid any differences in the shade.
➢ Tiles for the flooring shall be laid over hardened concrete base. The surface of the concrete
base shall be cleaned of all loose materials, mortar droppings etc well wetted without
allowing any water pools on the surface. The bedding mortar shall then be laid evenly over
the surface, tamped to the desired level and allowed to harden for a day. The top surface
shall be left rough to provide a good bond for the tiles. For skirting and dado work, the
backing mortar shall be roughened using a wire brush.
➢ Neat cement slurry using 3.3 kg cement per m2of floor area shall be spread over the hardened
mortar bed over such an area as would accommodate about 20 tiles. Tiles shall be fixed in
this slurry one after the other, each tile being gently tapped with a wooden mallet till it is
properly bedded and in level with the adjoining tiles. For skirting and dado work, the back
of the tiles shall be smeared with cement slurry for setting on the backing mortar. Fixing of
tiles shall be done from the bottom of the wall upwards.
➢ The joints shall be in perfect straight lines and as thin as possible but shall not be more than
1mm wide. The surface shall be checked frequently to ensure correct level/required slope.
Floor tiles near the walls shall enter skirting/dado to a minimum depth of 10mm. Tiles shall
not sound hollow when tapped. All the joints shall be cleaned of grey cement with wire brush
to a depth of at least 3mm and all dust, loose mortar etc. shall be removed.
➢ White cement with or without pigment shall then be used for flush pointing the joints. Curing
shall then be carried out for a minimum period of 7 days for the bedding and joints to set
properly. The surface shall then be cleaned using a suitable detergent, fully washed and
➢ Specials consisting of coves, internal and external angles, cornices, beads and their corner
pieces shall be of thickness not less than the tiles with which they are used.
In-Situ Cement Concrete Floor Topping:
➢ The mix proportion for the in-situ concrete floor topping shall be 1:2.5:3.5 (one-part cement:
two and half parts sand: three and half parts coarse aggregates) by volume unless otherwise
➢ The aggregates shall conform for the requirements of IS:383.
➢ Coarse aggregates shall have high hardness surface texture and shall consist of crushed rock
of granite, basalt, trap or quartzite. The aggregate crushing valve shall not exceed
percent. The grading of the aggregates of size 12.5mm and below shall be as per IS:2571.
➢ Grading of the sand shall be within the limits indicated in IS:2571.
➢ The thickness of the floor topping shall be as specified in the items of work prepared by the
Contractor. The minimum thickness of the floor topping shall be 25mm.
➢ Preparation of base concrete/structural slab before laying the topping shall be as mentioned
above. The surface shall be rough to provide adequate bond for the topping.
➢ Mixing of concrete shall be done thoroughly in a mechanical mixer unless hand mixing is
specifically permitted by the GWIL. The concrete shall be as stiff as possible and the amount
of water added shall be the minimum necessary to give just sufficient plasticity for laying
and compacting. The mix shall be used in the work within 30 minutes of the addition of
water for its preparation.
➢ Floor finish shall be laid in suitable panels to reduce the risk of cracking. No dimension of a
panel shall exceed 2 meters and the length of a panel shall not exceed one and a half times
its breadth. Topping shall be laid in alternate panels, the intermediate panels being cast
after a gap of at least one day. Construction joints shall be plain vertical butt joints.
➢ Screed strips shall be fixed dividing the area into suitable panels. Immediately before
depositing the concrete topping, neat cement slurry at 2.75 kg/m2of area shall be thoroughly
brushed into the prepared surface. Topping shall then be laid, very thoroughly tamped,
struck off level and floated with wooden float. The surface shall then be tested with a
straight edge and mason's spirit level to detect any inequalities and these shall be made good
➢ Finishing of the surface by Trowelling shall be spread over a period of one to six hours
depending upon the temperature and atmospheric conditions. The surface shall be trowelled
3 times at intervals so as to produce a smooth uniform and hard surface. Immediately after
laying, the first Trowelling just sufficient to give a level surface shall be carried out avoiding
excessive Troweling at this stage.
➢ The surface shall be re- trowelled after sometime to close any pores and to scrap off excess
water or laitance, which shall not be trowelled back into the topping. Final Trowelling shall
be done well before the concrete has become too hard but at a time when considerable
pressure is required to make any impression on the surface. Sprinkling of dry cement or
cement-sand mixture for absorbing moisture shall not be permitted.
➢ Immediately after the surface is finished, it shall be protected suitably from rapid drying
due to wind/ sunlight. After the surface has hardened sufficiently to prevent any damage to
it, the topping shall be kept continuously moist for a minimum period of 10 days.
➢ It is preferable to lay the topping on hardened base concrete, as against being laid
monolithically with a lesser thickness, since proper levels and slopes with close surface
tolerances is achievable in practice, owing to its greater thickness. Further, as this would be
laid after all other building operations are over, there will be no risk of any damages or
discolorations to the floor finish which are difficult to repair satisfactorily.
In-Situ Granolithic Concrete Floor Topping:
Materials and Workmanship:
➢ The Requirements of materials and workmanship shall be all as mentioned above for in-situ
cement concrete floor topping except that the mix proportion of the concrete shall be 1:1:2
(cement: sand: coarse aggregates) by volume.
➢ The minimum thickness of granolithic floor topping on hardened concrete base shall be
Floor Hardener Topping:
Materials & Workmanship:
➢ Floor Hardener topping shall be provided either as integrally finished over the structural
slab/grade slab or lay monolithically with the concrete/granolithic floor finish on top of
hardened concrete base.
➢ Floor hardener of the metallic or non-metallic type suitable for the performance of normal
/ medium/ heavy duty function of the floor, the quantum of ingredients and the thickness
of topping shall be as specified in the respective items of work prepared by the Contractor.
For monolithic application with the floor finish/slab the thickness of the layer shall be 15mm.
The topping shall be laid within 2 to 3 hours after concrete is laid when it is still plastic but
stiffened enough for the workmen to tread over it by placing planks.
➢ The surface of the concrete layer shall be kept rough for providing adequate bond for the
topping. Laitance shall be removed before placing the topping. The topping shall be screened
and thoroughly compacted to the finished level. Trowelling to a smooth finish shall be carried
out. After the surface has hardened sufficiently, it shall be kept continuously moist for at
least 10 days. The procedure for mixing the floor hardener topping shall be as per
manufacturer's instructions.
➢ Surface shall be prevented from any damages due to subsequent building operations by
covering with 75 mm thick layer of sand.
PVC Sheet/Tile Flooring:
➢ PVC floor covering shall be of either unbaked homogeneous flexible type in the form of
sheets/tiles conforming to IS:3462 or homogeneous PVC asbestos tiles conforming to IS:3461.
Surface of the sheets/tiles shall be free from any physical defects such as pores, blisters,
cracks etc. which affects the appearance and serviceability. Tiles/ sheets shall meet with
the tolerance limits in dimensions specified in the IS. Contractor shall submit the test
certificates, if so desired by the GWIL.
➢ Each tile/sheet shall be legibly and indelibly marked with the name of the manufacturer or
his trade mark, IS certificate mark, and batch number.
➢ The adhesive to be used for laying the PVC flooring shall be rubber based and of the make
as recommended and approved by the manufacturer of PVC sheets/tiles.
➢ The type, size, colour, plain or mottled and the pattern shall be as specified in the respective
items of work prepared by the Contractor.
➢ PVC Floor covering shall be provided over an under bed of cement concrete floor finish over
the base concrete or structural slab. It is essential that the sub-floor and the under bed are
perfectly dry before laying the PVC flooring. This shall be ensured by methods of testing as
stipulated in Appendix-A of IS:5318.
➢ The surface of the underbed shall have trowelled finish without any irregularities, which
creates poor adhesion. Surface shall be free of oil or grease and thoroughly cleaned of all
dust, dirt and wiped with a dry cloth.
➢ PVC sheets/tiles shall be brought to the temperature of the area in which they are to be laid
by stacking in a suitable manner within or near the laying area for a period of about 24 hours.
Where air-conditioning is installed, the flooring shall not be laid on the underbed until the
A/C units have been in operation for at least 7 days. During this period, the temperature
range shall be between 20deg.C and 30deg.C and this shall be maintained during the laying
operations and also for 48 hours thereafter.
➢ Layout of the PVC flooring shall be marked with guidelines on the underbed and PVC
tiles/sheets shall be first laid for trial, without using the adhesive, according to the layout.
➢ The adhesive shall be applied by using a notched trowel to the surface of the underbed and
to the backside of PVC sheets/tiles. When the adhesive has set sufficiently for laying, it will
be tacky to the touch, which generally takes about 30 minutes. The time period need be
carefully monitored since a longer interval will affect the adhesive properties. Adhesive shall
be uniformly spread over only as much surface area at one time which can be covered with
PVC flooring within the stipulated time.
➢ PVC sheet shall be carefully taken and placed in position from one end onwards slowly so
that the air will be completely squeezed out between the sheet and the background surface
and no air pockets are formed. It shall then be pressed with a suitable roller to develop
proper contact. The next sheet shall be laid edge to edge with the sheet already laid, so
that there is minimum gap between joints. The alignment shall be checked after each row
of sheet is completed and trimmed if considered necessary.
➢ Tiles shall be laid in the same manner as sheets and preferably, commencing from the center
of the area. Tiles should be lowered in position and pressed firmly on to the adhesive with
minimum gap between the joints. Tiles shall not be slide on the surface. Tiles shall be rolled
with a light wooden roller of about 5kg to ensure full contact with the underlay. Work should
be constantly checked to ensure that all four edges of adjacent tiles meet accurately.
➢ Any excess adhesive which may squeeze up between sheets/tiles shall be wiped off
immediately with a wet cloth. Suitable solvents shall be used to remove hardened adhesive.
➢ A minimum period of 24 hours shall be given after laying for the development of proper bond
of the adhesive. When the flooring is thus completed, it shall be cleaned with a wet cloth
soaked in warm soap solution.
➢ Metallic edge strips shall be used to protect the edges of PVC sheets/tiles which are exposed
as in doorways/ stair treads.
➢ Hot sealing of joints between adjacent PVC sheet flooring to prevent creeping of water
through the joints shall be carried out, using special equipment as per manufacturer's
Acid Resisting Brick/Tiling Work:
➢ The ceramic unglazed vitreous acid resisting tiles shall conform to the requirements of
IS:4457. Acid resistant bricks shall conform to the requirements of IS:4860.
➢ The finished tile/brick when fractured shall appear fine grained in texture, dense and
homogeneous. Tile/brick shall be sound, true to shape, flat, free from flaws and any
manufacturing defects affecting their utility. Tolerance in dimensions shall be within the
limits specified in the respective IS.
➢ The tiles/bricks shall be bedded and jointed using chemical resistant mortar of the resin
type conforming to IS:4832 (Part II). Method of usage shall generally be as per the
requirements of IS:4443.
➢ The resin shall have viscosity for readily mixing with the filler by manual methods.
➢ The filler shall have graded particles which permit joint thickness of 1.5 mm.
➢ The base concrete surface shall be free from dirt and thoroughly dried. The surface shall be
applied with a coat of bitumen primer conforming to IS:3384. The primed surface shall then
be applied with a uniform coat of bitumen conforming to IS:1580. Tiles or bricks shall be laid
directly without the application of bitumen, if epoxy or polyester resin is used for the
mortar. Just adequate quantity of mortar which can be applied within the pot life as
specified by the manufacturer shall be prepared at one time for bedding and jointing. Rigid
PVC/Stainless steel/chromium plated tools shall be used for mixing and laying. For laying
the floor 6 to 8 mm thick mortar shall be spread on the back of the tile/brick. Two adjacent
sides of the tile/brick shall be smeared with 4 to 6 mm thick mortar. Tile/brick shall be
pressed into the bed and pushed against the floor and with the adjacent tile/ brick, until
the joint in each case is 2 to 3 mm thick. Excess mortar shall then be trimmed off and allowed
to harden fully. Similar procedure shall be adopted for the work on walls by pressing the
tile/brick against the prepared wall surfaces and only one course shall be laid at a time until
the initial setting period.
➢ The mortar joints shall be cured for a minimum period of 72 hours with 20 to 25% hydrochloric
acid or 30 to 40% sulphuric acid. After acid curing, the joints shall be washed with water and
allowed to thoroughly dry. The joints shall then be filled with mortar to make them smooth
and plane. Acid curing is not required to be carried out if epoxy or polyester resin is used
for the mortar.
➢ Resin mortars are normally self-curing. The area tiled shall not be put to use before 48 hours
in case epoxy, polyester and furan type of resin is used for the mortar. If phenolic or cashew
nut shell liquid resin is used for the mortar, the area tiled shall not be put to use for 7 to
days respectively, without heat treatment. This period shall be 2 to 6 days respectively, if
heat treatment is given with infrared lamp.
Epoxy Lining Work:
➢ The epoxy resin and hardener formulation for laying of joint less lining work in floors and
walls of concrete tanks/trenches etc shall be as per the requirements of IS:9197.
➢ The epoxy composition shall have the chemical resistance to withstand the following
conditions of exposure:
➢ Hydrochloric acid up to 30% concentration
➢ Sodium hydroxide up to 50% concentration
➢ Liquid temperature up to 60deg.C
➢ Ultraviolet radiation
➢ Alternate wetting and drying
➢ Sand shall conform to grading zone III or IV of IS:383.
➢ The hardener shall be of the liquid type such as Aliphatic Amine or an Aliphatic/Aromatic
Amine Adduct for the epoxy resin. The hardener shall react with epoxy resin at normal
ambient temperature.
➢ Contractor shall furnish test certificates for satisfying the requirements of the epoxy
formulation if so directed by the GWIL.
➢ The minimum thickness of epoxy lining shall be 4 mm. It is essential that the concrete
elements are adequately designed to ensure that water is excluded to permeate to the
surface, over which the epoxy lining is proposed. The epoxy lining shall be of the trowel type
to facilitate execution of the required thickness for satisfactory performance.
➢ The concrete surfaces over which epoxy lining is to be provided shall be thoroughly cleaned
of oil or grease by suitable solvents, wire brushed to remove any dirt/dust and laitance. The
surfaces shall then be washed with dilute hydrochloric acid and rinsed thoroughly with plenty
of water or dilute ammonia solution. The surfaces shall then be allowed to dry. It is essential
to ensure that the surfaces are perfectly dry before the commencement of epoxy
application. Just adequate quantity of epoxy resin which can be applied within the pot life
as specified by the manufacturer shall be prepared at one time for laying and jointing. Rigid
PVC/stainless steel/chromium plated tools shall be used for laying. Trowelling shall be
carried out to obtain uniformly the specified thickness of lining.
➢ Lining shall be allowed to set without disturbance for a minimum period of 24 hours. The
facility shall be put to use only after a minimum period of 7 days of laying of the lining.
Water-Proofing:
➢ The work shall include waterproofing for the building roofs, terraces, toilets, floor slabs,
walls, planters, chhajjas, sills and any other areas and at any other locations and situations
as directed by the Employers Representative.
➢ The waterproofing treatment shall be carried out on top of lime concrete (brick bat coba)
laid to slope on roof surfaces. The brick bat-coba shall be covered as specified below.
➢ The work shall be carried out by an experienced specialist Sub-Contractor who shall be
appointed only after prior approval of the GWIL.
Modified Bituminous Membrane:
➢ Modified Bituminous Membrane shall be “SUPER THERMOLAY” 4 mm thick weighing
Kg/sq.m, manufactured using APP Polymer modified bitumen with a central core of non-
woven polyester reinforcement (200 gms/sqm) and with top and bottom layers of thermo
fusible film (top layer could also be sand finished) made by STP Limited in collaboration with
Bitumen Company Limited. “PLYFLEX” of Bitumen Company Limited, Saudi Arabia supplied
by STP Limited shall also be acceptable or other equivalent specification.
Waterproofing of Roofs with Lime Concrete:
➢ Broken brick coarse aggregates prepared from well/over burnt bricks shall be well graded
having a maximum size of 25mm and shall generally conform to IS:3068.
➢ Lime shall be class C lime (fat lime) or factory-made hydrated lime conforming to IS:712.
➢ Lime concrete shall be prepared by thoroughly mixing the brick aggregates inclusive of brick
dust obtained during breaking with the slaked lime in the proportions of 2 1/2 (two and a
half) parts of brick aggregates to 1 part of slaked lime by volume. Water shall be added just
adequate to obtain the desired workability for laying. Washing soap and alum shall be
dissolved in the water to be used. The quantity of these materials required per cum of lime
concrete shall be 12kg of washing soap and 4kg of alum. Brick aggregates shall be soaked
thoroughly in water for a period of not less than six hours before use in the concrete mix.
Lime concrete shall be used in the works within 24 hours after mixing.
➢ The roof surface over which the water-proof treatment is to be carried out shall be cleaned
of all foreign matter by wire brushing, dusting and made thoroughly dry. Preparation of
surfaces shall be as stipulated in IS:3067.
➢ The slope of the finished waterproofing treatment shall be not less than 1 in 60 for efficient
drainage. This shall be achieved either wholly in the lime concrete layer.
➢ The average thickness of lime concrete, slope and the finish on top of machine-made burnt
clay flat terracing tiles conforming to IS:2690 (part I) shall be as specified in the items of
work to be prepared by the Contractor. Cement concrete flooring tiles in lieu of clay
terracing tiles shall be provided if so specified in the items of work prepared by the
Contractor, duly considering the traffic the terrace will be subjected to.
➢ The minimum compacted thickness of lime concrete layer shall be 75mm and average
thickness shall not be less than 100mm. In case, the thickness is more than 100mm, it shall
be laid in layers not exceeding 100mm to 125mm. Laying of lime concrete shall be
commenced from a corner of the roof and proceeded diagonally towards center and other
sides duly considering the slopes specified for effectively draining the rain-water towards
the downtake points. Lime concrete fillet for a minimum height of 150mm shall be provided
all along the junction of the roof surface with the brick masonry wall/parapet/column
projections. These shall then be finished on top with provision of clay terracing tiles/cement
concrete tiles.
➢ After the lime concrete is laid it shall be initially rammed with a rammer weighing not more
than 2 Kg and the finish brought to the required evenness and slope. Alternatively, bamboo
strips may be used for the initial ramming. Further consolidation shall be done using wooden
THAPIES with rounded edges. The beating will normally have to be carried on for at least
seven days until the THAPI makes no impression on the surface and rebounds readily from it
when struck. Special care shall be taken to properly compact the lime concrete at its
junction with parapet walls or column projections. During compaction by hand-beating, the
surface shall be sprinkled liberally with lime water (1 part of lime putty and 3 to 4 parts of
water) and a small proportion of sugar solution for obtaining improved water-proofing quality
of the lime concrete.
➢ On completion of beating, the mortar that comes on the top shall be smoothened with a
trowel or float, if necessary, with the addition of sugar solution and lime putty.
➢ The sugar solution may be prepared in any one of the following ways as directed by the
➢ By mixing about 3 Kg of Jaggery and 1.5 Kg of BAEL fruit to 100 liters of water.
➢ By mixing about 600 gm of KADUKAI (the dry nuts shall be broken to small pieces and allowed
to soak in water), 200 gm of jaggery and 40 liters of water for 10 sq.m of work. This solution
shall be brewed for about 12 to 24 hours and the resulting liquor decanted and used for the
➢ The lime concrete after compaction shall be cured for a minimum period of seven days or
until it hardens by covering with a thin layer of straw or hessian which shall be kept wet
continuously. Machine made flat terracing tiles shall be of the size and thickness as specified.
Tiles shall be soaked in water for at least one hour before laying. Bedding for the tiles shall
be 12mm thick in cement mortar 1:3. Tiles shall be laid, open jointed with 4 to 6 mm wide
joints, flat on the mortar and lightly pressed and set to plane surface true to slope, using a
trowel and wooden straight edge. They shall be laid with their longitudinal lines of joints
truly parallel and generally at right angles to the direction of run-off gradient. Transverse
joints in alternate rows shall come directly in line with each other. Transverse joints in
adjacent courses shall break joints by at least 50 mm. The joints shall be completely filled
and flush pointed with cement mortar 1:2 mixed with water proofing compound as per
manufacturer's instructions. Curing shall be carried out for a minimum period of seven days.
Finishing on top with cement concrete tiles or in-situ cement concrete floor topping shall be
carried out in similar fashion as described for clay tiles in above paragraph. Tiles to be used
shall be supplied after the first machine grinding of the surface.
Waterproofing of Roofs/Terraces etc.:
(A) Water proofing of Horizontal Surfaces:
The waterproofing shall be applied as follows:
➢ A coat of Blown Bitumen 85/25 shall be applied at the rate of 1.45 kg/sq.km
➢ A roll of Modified Bituminous Membrane shall be unrolled over the primed surface and
completely bonded to the substrate by pressing down evenly for the full width of the roll
using a wooden roller. Torching shall be done, where recommended by the manufacturer
and where directed by the GWIL, as the unrolling progresses.
➢ The side overlaps shall be minimum 100 mm whereas the end overlaps shall be minimum
mm; both shall be bonded and sealed by flame torching. Care shall be taken that the
membrane is lapped with the treatment along the vertical surface and roof gutter treatment
for at least 500 mm. The membrane shall be properly overlapped/terminated at all openings,
rainwater down takes etc. to ensure that such junctions do not become sources of leakage.
➢ Top of membrane finally shall be painted with anti-glare reflective paint.
(B) Waterproofing of Vertical Surfaces at Roof Level and Gutters:
The Water proofing shall be applied as described in (a) above.
➢ Modified Bituminous membrane shall be unrolled and bonded to the substrate after applying
a coat of bitumen and by pressing down evenly for the full width of the roll. Light torching
shall be done to ensure complete bonding.
➢ The membrane shall be overlapped with treatment for the horizontal surface by at least
➢ The membrane shall be taken up to a pre-cut chase anchored and sealed.
Khurras and Rainwater down Pipes:
➢ Down pipes shall be isolated from RCC work with 6 mm polyethylene foam fixed with
adhesive (Araldite) and sealed with silicone sealant prior to laying membrane. A water
proofing flashing composed of one layer of Hessian based self-finished felt Type 3 Grade
and two layers of aluminum foil of 0.075 mm thickness shall be provided. This flashing shall
be carried into the down take pipes for at least 150 mm and sealed with hot bitumen. The
Contractor shall closely coordinate the work with the agency providing and fixing the
rainwater down take pipes.
➢ The treated area (flat and horizontal only) shall be tested by allowed water to stand on the
treated areas to a depth of 150 mm for a minimum period of 72 hours.
➢ The treated area (flat and horizontal) shall have continuous slope towards the rainwater
outlets and no water shall pond anywhere on the surface.
Cement Plastering Work:
➢ The proportions of the cement mortar for plastering shall be 1:3 (one part of cement to
three parts of sand). Cement and sand shall be mixed thoroughly in dry condition and then
just enough water added to obtain a workable consistency. The quality of water and cement
shall be as per relevant IS standards. The quality and grading of sand for plastering shall
conform to IS:1542. The mixing shall be done thoroughly in a mechanical mixer unless hand
mixing is specifically permitted by the GWIL. If so desired by the GWIL sand shall be screened
and washed to meet the Specifications. The mortar thus mixed shall be used as soon as
possible preferably within 30 minutes from the time water is added to cement. In case the
mortar has stiffened due to evaporation of water this may be re- tempered by adding water
as required to restore consistency but this will be permitted only up to 30 minutes from the
time of initial mixing of water to cement. Any mortar which is partially set shall be rejected
and removed forthwith from the site. Droppings of plaster shall not be re-used under any
➢ Preparation of surfaces and application of plaster finishes shall generally conform to the
requirements specified in IS:1661 and IS:2402.
➢ Plastering operations shall not be commenced until installation of all fittings and fixtures
such as door/window panels, pipes, conduits etc. are completed.
➢ All joints in masonry shall be raked as the work proceeds to a depth of 10mm/20mm for
brick/stone masonry respectively with a tool made for the purpose when the mortar is still
green. The masonry surface to be rendered shall be washed with clean water to remove all
dirt, loose materials, etc., Concrete surfaces to be rendered shall be roughened suitably by
hacking or bush hammering for proper adhesion of plaster and the surface shall be evenly
wetted to provide the correct suction. The masonry surfaces should not be too wet but only
damp at the time of plastering. The dampness shall be uniform to get uniform bond between
the plaster and the masonry surface.
Interior plain faced plaster - This plaster shall be laid in a single coat of 13mm thickness.
The mortar shall be dashed against the prepared surface with a trowel. The dashing of the
coat shall be done using a strong whipping motion at right angles to the face of the wall or
it may be applied with a plaster machine. The coat shall be trowelled hard and tight forcing
it to surface depressions to obtain a permanent bond and finished to smooth surface. Interior
plaster shall be carried out on jambs, lintel and sill faces etc. as shown in the drawing and
as directed by the GWIL.
Plain Faced Ceiling plaster - This plaster shall be applied in a single coat of 6mm thickness.
Application of mortar shall be as stipulated in above paragraph.
Exterior plain faced plaster - This plaster shall be applied in 2 coats. The first coat or the
rendering coat shall be approximately 14mm thick. The rendering coat shall be applied as
stipulated above except finishing it to a true and even surface and then lightly roughened
by cross scratch lines to provide bond for the finishing coat. The rendering coat shall be
cured for at least two days and then allowed to dry. The second coat or finishing coat shall
be 6 mm thick. Before application of the second coat, the rendering coat shall be evenly
damped. The second coat shall be applied from top to bottom in one operation without joints
and shall be finished leaving an even and uniform surface. The mortar proportions for the
coats shall be as specified in the respective item of work. The finished plastering work shall
be cured for at least 7 days.
➢ Interior plain faced plaster 20mm thick if specified for uneven faces of brick walls or for
random/coursed rubble masonry walls shall be executed in 2 coats similar to the procedure
stipulated in above paragraph.
Exterior Sand Faced Plaster - This plaster shall be applied in 2 coats. The first coat shall be
approximately 14mm thick and the second coat shall be 6mm thick. These coats shall be
applied as stipulated above. However, only approved quality white sand shall be used for
the second coat and for the finishing work. Sand for the finishing work shall be coarse and
of even size and shall be dashed against the surface and sponged. The mortar proportions
for the first and second coats shall be as specified in the respective items of work.
➢ Wherever more than 20mm thick plaster has been specified, which is intended for purposes
of providing beading, bands, etc. this work shall be carried out in two or three coats as
directed by the GWIL duly satisfying the requirements of curing each coat
(rendering/floating) for a minimum period of 2 days and curing the finished work for at least
➢ In the case of pebble faced finish plaster, pebbles of approved size and quality shall be
dashed against the final coat while it is still green to obtain as far as possible a uniform
pattern all as directed by the GWIL.
➢ Where specified in the Drawings to be prepared by the Contractor prepared by the
Contractor, rectangular grooves of the dimensions indicated shall be provided in external
plaster by means of timber battens when the plaster is still in green condition. Battens shall
be carefully removed after the initial set of plaster and the broken edges and corners made
good. All grooves shall be uniform in width and depth and shall be true to the lines and levels
as per the Drawings to be prepared by the Contractor prepared by the Contractor.
➢ Curing of plaster shall be started as soon as the applied plaster has hardened sufficiently so
as not to be damaged when watered. Curing shall be done by continuously applying water in
a fine spray and shall be carried out for at least 7 days.
➢ For waterproofing plaster, the Contractor shall provide the water-proofing admixture as
specified in manufacturer’s instruction while preparing the cement mortar.
➢ For external plaster, the plastering operations shall be commenced from the top floor and
carried downwards. For internal plaster, the plastering operations for the walls shall
commence at the top and carried downwards. Plastering shall be carried out to the full
length of the wall or to natural breaking points like doors/windows etc. Ceiling plaster shall
be completed first before commencing wall plastering.
➢ Double scaffolding to be used shall be as specified.
➢ The finished plaster surface shall not show any deviation more than 4mm when checked with
a straight edge of 2m length placed against the surface.
➢ To overcome the possibility of development of cracks in the plastering work following
measures shall be adopted.
➢ Plastering work shall be deferred as much as possible so that fairly complete drying shrinkage
in concrete and masonry works takes place.
➢ Steel wire fabric shall be provided at the junction of brick masonry and concrete to overcome
reasonably the differential drying shrinkage/thermal movement.
➢ Ceiling plaster shall be done, with a trowel cut at its junction with wall plaster. Similarly
trowel cut shall be adopted between adjacent surfaces where discontinuity of the
background exists.
Cement Pointing:
➢ The cement mortar for pointing shall be in the proportion of 1:3 (one part of cement to three
parts of fine sand). Sand shall conform to IS: 1542 and shall be free from clay, shale, loam,
alkali and organic matter and shall be of sound, hard, clean and durable particles. Sand shall
be approved by GWIL and if so directed it shall be washed/screened to meet specification
➢ Where pointing of joints in masonry work is specified, the joints shall be raked at least
15mm/20mm deep in brick/stone masonry respectively as the work proceeds when the
mortar is still green.
➢ Any dust/dirt in the raked joints shall be brushed out clean and the joints shall be washed
with water. The joints shall be damp at the time of pointing. Mortar shall be filled into joints
and well pressed with special steel trowels. The joints shall not be disturbed after it has
once begun to set. The joints of the pointed work shall be neat. The lines shall be regular
and uniform in breadth and the joints shall be raised, flat, sunk or 'V' as may be specified in
the respective items of work. No false joints shall be allowed.
➢ The work shall be kept moist for at least 7 days after the pointing is completed. Whenever
colored pointing has to be done, the coloring pigment of the color required shall be added
to cement in such proportions as recommended by the manufacturer and as approved by the
Water-Proofing Admixtures;
➢ Water-proofing admixture shall conform to the requirements of IS:2645 and shall be of
approved manufacture. The admixture shall not contain calcium chloride. The quantity of
the admixture to be used for the works and method of mixing etc. shall be as per
manufacturer's instructions and as directed by the GWIL.
Painting of Concrete, Masonry & Plastered Surfaces:
➢ Oil bound distemper shall conform to IS:428. The primer shall be alkali resistant primer of
the same manufacture as that of the distemper.
➢ Cement paint shall conform to IS:5410. The primer shall be a thinned coat of cement paint.
Lead free acid, alkali and chlorine resisting paint shall conform to IS:9862.
➢ Color wash shall be made by addition of a suitable quantity of mineral pigment, not affected
by lime, to the prepared white wash to obtain the shade/tint as approved by the GWIL.
➢ All the materials shall be of the best quality from an approved manufacturer. Contractor
shall obtain prior approval of the GWIL for the brand of manufacture and the color/shade.
All materials shall be brought to the site of works in sealed containers.
➢ Contractor shall obtain the approval of the GWIL regarding the readiness of the surfaces to
receive the specified finish, before commencing the work on painting. Painting of new
surfaces shall be deferred as much as possible to allow for thorough drying of the sub- strata.
➢ The surfaces to be treated shall be prepared by thoroughly brushing them free from dirt,
mortar droppings and any loose foreign materials. Surfaces shall be free from oil, grease and
efflorescence. Efflorescence shall be removed only by dry brushing of the growth. Cracks
shall be filled with Gypsum. Workmanship of painting shall generally conform to IS:2395.
Surfaces of doors, windows etc. shall be protected suitably to prevent paint finishes from
splashing on them.
➢ The prepared surfaces shall be wetted and the finish applied by brushing. The operation for
each coat shall consist of a stroke of the brush first given horizontally from the right and the
other from the left and similarly, the subsequent stroke from bottom upwards and the other
from top downwards, before the first coat dries. Each coat shall be allowed to dry before
the next coat is applied. Minimum of 2 coats shall be applied unless otherwise specified. The
dry surface shall present a uniform finish without any brush marks.
➢ Color wash shall be applied in the same way as for white wash. A minimum of 2 coats shall
be applied unless otherwise specified. The surface shall present a smooth and uniform finish
without any streaks. The finished dry surface shall not show any signs of peeling/powdery
and come off readily on the hand when rubbed.
➢ The prepared surfaces shall be wetted to control surface suction and to provide moisture to
aid in proper curing of the paint. Cement paint shall be applied with a brush with stiff
bristles. The primer coat shall be a thinned coat of cement paint. The quantity of thinner
shall be as per manufacturer's instructions. The coats shall be vigorously scrubbed to work
the paint into any voids for providing a continuous paint film free from pinholes for effective
water proofing in addition to decoration. Cement paint shall be brushed in uniform thickness
and the covering capacity for two coats on plastered surfaces shall be 3 to 4 kg/m2. A
minimum of 2 coats of the same color shall be applied. At least 24 hours shall be left after
the first coat to become sufficiently hard before the second coat is applied. The painted
surfaces shall be thoroughly cured by sprinkling with water using a fog spray at least 2 to
times a day. Curing shall commence after about 12 hours when the paint hardens. Curing
shall be continued for at least 2 days after the application of final coat. The operations for
brushing each coat shall be as detailed above.
Oil bound Distemper:
➢ The prepared surfaces shall be dry and provided with one coat of alkali resistant primer by
brushing. The surface shall be finished uniformly without leaving any brush marks and
allowed to dry for at least 48 hours.
➢ A minimum of two coats of oil bound distemper shall be applied, unless otherwise specified.
The first coat shall be of a lighter tint. At least 24 hours shall be left after the first coat to
become completely dry before the application of the second coat. Broad, stiff, double
bristled distemper brushes shall be used for the work. The operations for brushing each coat
shall be as detailed above.
Acid, Alkali Resisting Paint:
➢ A minimum of 2 coats of acid/alkali resisting paint shall be applied over the prepared dry
surfaces by brushing. Primer coat shall be as per manufacturer's instructions.
Plastic Emulsion Paint:
➢ The prepared surface shall be dry and provided with one coat of primer which shall be a
thinned coat of emulsion paint. The quantity of thinner shall be as per manufacturer's
instructions. The paint shall be laid on evenly and smoothly by means of crossing and laying
off. The crossing and laying off consists of covering the area with paint, brushing the surface
hard for the first time over and then brushing alternately in opposite directions two or three
times and then finally brushing lightly in a direction at right angles. In this process, no brush
marks shall be left after the laying off is finished. The full process of crossing and laying off
constitutes one coat. The next coat shall be applied only after the first coat has dried and
sufficiently become hard which normally takes about 2 to 3 hours. A minimum of 2 finishing
coats of the same color shall be applied unless otherwise specified. Paint may also be applied
using rollers. The surface on finishing shall present a flat velvety smooth finish and uniform
in shade without any patches.
Acrylic Emulsion Paint:
➢ Acrylic emulsion paint shall be applied in the same way as for plastic emulsion paint. A
minimum of 2 finishing coats over one coat of primer shall be provided unless otherwise
Painting & Polishing of Wood Work:
➢ Wood primer shall conform to IS:3536.
➢ Filler shall conform to IS:110.
➢ Varnish shall conform to IS:337.
➢ French polish shall conform to IS:348.
➢ Synthetic enamel paint shall conform to IS:2932.
➢ All the materials shall be of the best quality from an approved manufacturer. Contractor
shall obtain prior approval of the GWIL for the brand of manufacture and the color/shade.
All materials shall be brought to the site of works in sealed containers.
➢ The type of finish to be provided for woodwork of painting or polishing, the number of coats,
etc. shall be as specified in the respective items of work to be prepared by the Contractor.
Primer and finish paint shall be compatible with each other to avoid cracking and wrinkling.
Primer and finish paint shall be from the same manufacturer. Painting shall be either by
brushing or spraying. Contractor shall procure the appropriate quality of paint for this
purpose as recommended by the manufacturer.
➢ The workmanship shall generally conform to the requirements of IS:2338 (Part I). All the
wood surfaces to be painted shall be thoroughly dry and free from any foreign matter.
Surfaces shall be smoothened with abrasive paper using it across the grains and dusted off.
Wood primer coat shall then be applied uniformly by brushing. The number of primer coats
shall be as specified in the item of work to be prepared by the Contractor. Any slight
irregularities of the surface shall then be made- up by applying an optimum coat of filler
conforming to IS:110 and rubbed down with an abrasive paper for obtaining a smooth surface
for the undercoat of synthetic enamel paint conforming to IS:2932. Paint shall be applied by
brushing evenly and smoothly by means of crossing and laying off in the direction of the grain
of wood. After drying, the coat shall be carefully rubbed down using very fine grade of sand
paper and wiped clean before the next coat is applied. At least 24 hours shall elapse between
the applications of successive coats. Each coat shall vary slightly in shade and this shall be
got approved by the GWIL. The number of coats of paint to be applied shall be as specified
in the item of work to be prepared by the Contractor. All the wood surfaces to be provided
with clear finishes shall be thoroughly dry and free from any foreign matter. Surfaces shall
be smoothened with abrasive paper using it in the direction of the grains and dusted off. Any
slight irregularities of the surface shall be made up by applying an optimum coat of
transparent liquid filler and rubbed down with an abrasive paper for obtaining a smooth
surface. All dust and dirt shall be thoroughly removed. Over this prepared surface, varnish
conforming to IS:337 shall be applied by brushing. Varnish should not be retouched once it
has begun to set. Staining if required shall be provided as directed by the GWIL. When two
coats of varnish are specified, the first coat should be a hard-drying undercoat or flatting
varnish which shall be allowed to dry hard before applying the finishing coat. The number of
coats to be applied shall be as specified. For works where clear finish of French polish is
specified the prepared surfaces of wood shall be applied with the polish using a pad of
woolen cloth covered by a fine cloth. The pad shall be moistened with polish and rubbed
hard on the surface in a series of overlapping circles to give an even finish over the entire
area. The surface shall be allowed to dry before applying the next coat. Finishing shall be
carried out using a fresh clean cloth over the pad, slight dampening with methylated spirit
and rubbing lightly and quickly in circular motions. The finished surface shall have a uniform
texture and high gloss. The number of coats to be applied shall be as specified.
Painting of Steel Work:
➢ Red-oxide – zinc chrome primer shall conform to IS:2074.
➢ Synthetic enamel paint shall conform to IS:
➢ Aluminum paint shall conform to IS:2339.
➢ All the materials shall be of the best quality from an approved manufacturer. Contractor
shall obtain prior approval of the GWIL for the brand of manufacture and the color/shade.
All the materials shall be brought to the site in sealed containers.
➢ Painting work shall be carried out only on thoroughly dry surfaces. Painting shall be applied
either by brushing or by spraying. Contractor shall procure the appropriate quality of paint
for this purpose as recommended by the manufacturer. The workmanship shall generally
conform to the requirement of IS:1477 (Part 2).
➢ The type of paint, number of costs etc. shall be as specified in the respective items of work.
Primer and finish paint shall be compatible with each other to avoid cracking and wrinkling.
Primer and finish paint shall be from the same manufacturer. All the surfaces shall be
thoroughly cleaned of oil, grease, dirt, rust and scale. The methods to be adopted using
solvents, wire brushing, power tool cleaning etc., shall be as per IS:1477 (Part – I) and as
indicated in the item of work. It is essential to ensure that immediately after preparation of
the surfaces; the first coat of red oxide-zinc chrome primer shall be applied by brushing and
working it well to ensure a continuous film without holidays. After the first coat becomes
hard dry, a second coat of primer shall be applied by brushing to obtain a film free from
`holidays. After the second coat of primer is hard dry, the entire surface shall be wet rubbed
cutting down to a smooth uniform surface. When the surface becomes dry, the undercoat of
synthetic enamel paint of optimum thickness shall be applied by brushing with minimum of
brush marks. The coat shall be allowed to hard-dry. The under coat shall then be wet rubbed
cutting down to a smooth finish, taking adequate care to ensure that at no place the
undercoat is completely removed. The surface shall then be allowed to dry. The first
finishing coat of paint shall be applied by brushing and allowed to hard-dry. The gloss from
the entire surface shall then be gently removed and the surface dusted off. The second
finishing coat shall then be applied by brushing. At least 24 hours shall elapse between the
applications of successive coats. Each coat shall vary slightly in shade and this shall be got
approved by the GWIL.
➢ Anodized Aluminum sheets shall be 1.00mm thick with anodic film thickness of 0.025 mm.
➢ Galvanized mild steel sheets shall be 1.00mm thick with zinc coating of 800 gms/sq.m.
➢ Bitumen felt shall be either Hessian base self finished bitumen felt Type-3 Grade I
conforming to IS:1322 or glass fiber base self finished felt Type-2 Grade 1 conforming to
➢ The type of the flashing and method of fixing shall be as specified.
➢ Flashing shall be of the correct shape and size as indicated in the construction Drawings to
be prepared by the Contractor and they shall be properly fixed to ensure their effectiveness.
➢ Flashing shall be of long lengths so as to provide minimum number of joints. The minimum
overlap at joints shall be 100mm.
➢ Fixing of the flashing shall be either by bolting with bitumen washers or by tucking into the
groove 75 mm wide x 65 mm deep in masonry/concrete along with cement mortar 1:4
filleting as indicated in the Drawings to be prepared by the Contractor. Curing of the mortar
shall be carried out for a minimum period of 4 days.
➢ Bitumen felt flashing of the type as specified shall be provided with 2 coats of bituminous
paint at the rate of 0.10 liter/m2after the installation.
Thermal Insulation for Ceiling
➢ Thermal insulation shall be “Thermocole” TF type or similar approved or Resin bonded fiber
“Thermocole” Boards:
➢ Soffit of RCC Slab shall be thoroughly cleaned with wire brush and 85/25 industrial grade hot
bitumen conforming to IS:702 shall be applied uniformly over the surface at the rate of
➢ Thermocole boards (T.F. variety) of 50mm thickness shall be stuck by means of the same
grade of hot bitumen. The boards shall be further secured with screws, washers and plugs.
The joints of the boards shall be sealed with bitumen.
Fiber Glass Boards:
➢ Timber pegs 50mm x 50mm x 50mm shall be fixed to the slab at 600mm centers with 6mm x
65mm long wood screws. 20-gauge G.I. lacing wire shall be tied to the pegs `Crown’
fiberglass boards 50mm thick shall be stuck to the pegs with CPRX compound or any other
suitable adhesive and be held in position by the 20-gauge G.I. lacing wires. The insulation
boards shall be covered with 20mm – 24-gauge hexagonal G.I. chicken wire mesh, nailed to
the timber pegs and 30-gauge aluminum sheets shall be fixed over the chicken wire mesh
with 50mm overlap and secured to the timer pegs by screws. If the insulation is specified to
rest on top of the false ceiling, it shall be properly installed and anchored to the framework.
In case additional battens are required for proper installation, Contractor shall include its
cost in the rate for insulation.
Plaster of Paris Board for False Ceiling:
Plaster of Paris Boards:
➢ The plaster of Paris boards to be used in the false ceiling shall be of an approved manufacture
or manufactured at site by methods and materials approved by GWIL.
➢ The plaster of Paris shall be of the calcium-sulphate hemi-hydrate variety and shall contain
not less than 35 percent Sulphur trioxide and other requirements as per IS:2547 (Part I)
However, its fineness shall be such that the residue, after drying, and sieving on I.S. sieve
designation 3.35mm for 5 minutes shall not be more than 1 percent by weight. Initial setting
time shall not be less than 13 minutes. The average compressive strength of plaster
determined by testing 5 cm cubes 24 hours after removal from moulds and drying in an oven
at 40 Deg. C till the weight of the cubes is constant, shall not be less than 84 Kg per sq.cm.
➢ The plaster of Paris boards reinforced with hessian cloth or coir shall be prepared in suitable
sizes as shown on the drawings or as directed by GWSSB. Wooden forms of height equal to
the thickness of boards shall be placed on truly level and smooth surface such as a glass
sheet. The edges of the boards shall be truly square. The glass sheet or surface on which
form is kept and the form sides shall be given a thin coat of non-staining oil to facilitate the
easy removal of the board. Plaster of Paris shall be evenly spread into the form up to about
half the depth and hessian cloth or coir shall be pressed over the plaster of Paris layer. The
weight of hessian cloth or coir in the board shall be 250 gm per sq.m. The ends of the
hessian/coir reinforcement shall be turned over at all edges to form a double layer for a
width of 50mm. The hessian cloth shall be of an open web texture so as to allow the plaster
below and above to intermix with each other and form an integral board. The form shall
then be filled with plaster of Paris which shall be uniform pressed and then wire cut to an
even and smooth surface. The board shall then be allowed to set initially for an hour or so
and then removed from the form and allowed to dry and harden for about a week. The board
after drying and hardening shall give a ringing sound when struck. The boards shall be true
and exact to shape and size and the exposed face shall be truly plane and smooth.
➢ The size of boards shall generally be 600mm x 600 mm x 12 mm thick. Boards shall be kept
dry in transit and stored flat in a clean dry place and shall not be exposed to moisture. The
boards shall always be carried on edges.
Timber Frame Work:
➢ Timber for frame work of false ceiling grid and hangers shall be of good quality and well
seasoned. It shall have uniform color, reasonably straight and close grains and shall be free
from knots, cracks and sapwood. It shall be treated with approved anti-termite preservative
as directed by the GWIL. Extreme care shall be taken so that the preservative treatment
does not stain the ceiling boards. In case metal hangers are used, these shall be M.S. flats
or bars, having two coats of red oxide zinc chromate paint primer, as shown on drawings or
as approved by GWIL.
Metal Framework:
➢ The metal frame work may be made of sections of light metal, such as anodized aluminum,
mild steel or as shown on the drawings. The shape of cross-section shall be such as to
facilitate proper suspension and proper fixing of the ceiling boards covering them and shall
be structurally sound and rigid.
➢ The false ceiling grid work shall be carried out as per the approved drawings or as directed
by GWIL. In case of timber grid work, the grid work shall consist of teak wood runners of
minimum size 60mm deep x 40mm wide along one direction at 1.2m centre to centre and
secondary runners of size 50mm deep x 40 mm wide at 60mm centre to centre perpendicular
to the main runners.
➢ The timber grid work shall be suspended with the help of wooden hangers or metal hangers
at 1.2m centre to centre in both the directions. Wooden hangers shall be adopted for flat
R.C. roof slab structures whereas metal hangers for flat R.C. roof or structural steel floors /
tresses. Metal hangers shall be fabricated from mild steel / galvanized flats of 35mm x 6mm
size or bars of 10mm dia. Threaded at the lower end and anchored securely in the roof
concrete or welded to inserts provided on the underside of slabs, beams etc. All M.S. hangers
shall be given two coats of red oxide zinc chromate paint primer. In case the roof work is of
A.C. sheeting supported on purlins and trusses, hangers shall be suspended from roof steel
work. The arrangement of metal hangers shall be such that the level of false ceiling can be
adjusted during fixing of the ceiling frame work. The ceiling frame work shall be secured to
hangers by means of washers and nuts. The ends of main runners shall preferably be
embedded into the masonry work.
➢ The metal frame work when it is anodized aluminum false ceiling grid system shall consist
of aluminum main member of special T-Profile of 38mm x 38mm x 1.5mm thick, interlocking
with each other to form frames of various sizes, 600mm x 600 mm or as shown on the
drawing. The main members shall be suspended from the roof structures by means of steel
hangers as described for timber frame work and supported at the walls by means of anodized
aluminum wall angles.
➢ In the case of timber frame work, all the edges of the plaster of Paris board shall be fixed
to frame members by means of counter sunk and rust less screws of 2.74 mm size, 40mm
long at a spacing of 100mm to 150 mm c/c and 12mm from the edge of the board. Holes for
screws shall be drilled and screws slightly countersunk into the boards. The boards shall be
fixed to wooden framework with a joint clearance of about 3mm. The joints shall always be
in perfect line and plane.
➢ In case of aluminum grid system, boards shall be just placed into the frames formed by the
main `T’ members and the cross members fitted with the clips for locking boards. Contractor
shall take utmost care so as not to force the boards in position and a slight gap shall be
provided so as not to make a tight joint. The boards shall be cut with a saw, if required, to
any shape and size.
➢ As the work of false ceiling may be inter-connected with the work of air-conditioning ducts
and lighting, Contractor shall fully co-operate with the other agencies entrusted with the
above work, who may be working simultaneously. Contractor shall provide necessary
openings in the false ceiling work for air-conditioning, lighting and other fixtures. Additional
framing, if required, for the above opening shall also be provided at no extra cost to
Employer. Removable or hinged type inspection or access trap doors shall be provided at
locations specified by GWIL.
➢ It is essential that false ceiling work should be firm and in perfect line and level and all
boards free from distortion, bulge, and other defects. All defective boards and other
material shall be removed from site immediately and replaced, and ceiling restored to
original finish to the satisfaction of GWIL. The workmanship shall be of highest order and all
joinery work for timber work shall be in the best workmanship manner. The joints for
aluminum frame work shall be of inter-locking type so that when the cross member is in
place, it cannot be lifted out. The countersunk heads of screws and all joints shall be filled
with plaster of Paris and finished smooth. After filling the joints, a thick skin of the finishing
material shall be spread about 50mm wide on either side of the joint and on to it shall be
trowelled dry a reinforcing scrim cloth about 10mm wide. If metal scrim is used, a stiffer
plaster will be necessary to enable the Troweling the scrim down to the board.
➢ In case of fire protective ceilings, fire resisting barriers at suitable intervals shall be
provided. These shall completely close the gap between the false ceiling and soffit of the
structural slab. The material of the barrier shall be as indicated by GWSSB (Reference may
be made to the British Standards Institutions CP 290: Code of Practice for suspended ceiling
and lining of dry construction using metal fixing system, `for guidance).
False or Cavity Floor;
➢ The false floor shall consist of a framework of suitable structural member designed to carry
the loads specified. This frame work shall be supported on suitably designed stools placed
at 600mm centre to centre in both directions. The stools shall consist of a mild steel base
plate with a mild steel stud having adjustable lock nut and coupling at the centre and another
mild steel plate at top serving as a prop head.
➢ The above framework shall be suitably designed to accommodate 35mm thick, 600mm square
panels. The base plate shall be fixed to the reinforced concrete floor with an approved
adhesive compound or with 4 Nos. 6mm dia. Anchor fasteners. Bedding of 1:2 or richer
cement sand mortar shall be provided locally under the base plates of stools to provide a
➢ The prop head shall be provided with mild steel lugs welded on top and each placed
perpendicular to the other for proper positioning and supporting the main and cross
members. The stools shall be capable of adjustment to accommodate concrete floor level
irregularities up to plus or minus 15mm. The framing members shall be completely removable
and shall remain in position without screwing or bolting to the prop heads. All steel
framework including steel stools shall be given a coat of zinc chromate primer and two coats
of enamel paint of approved color and shade.
➢ The floor panels shall be made of 600mm x 600mm x 35 mm thick medium density
unvinegared/ non-prelaminated teak wood particle boards having a density of not more than
800 kg/cu.m bonded with boiling water proof phenol formaldehyde synthetic resin and shall
be of fire resistant, termite resistant and moisture proof quality, generally conforming to
IS:3087-specification for wood particle boards (Medium Density) for general purposes.
➢ The thermal conductivity of the boards shall not exceed 0.12 kCal/hr./sq.m/deg./C/m. The
panel size given above may be suitably modified near electrical panel/equipment and also
to suit room dimensions with panel size not more than 600mm under any circumstances.
Exposed 2mm thick vinyl edging shall be provided on all edges of individual panels. Each
panel shall be given a coat or primer and two coats of approved fire-resistant paint from
underside. The particle boards shall be faced with 600mm x 600 mm x 2mm thick approved
make flooring tiles conforming to IS:3462 – “Specification for unbaked flexible PVC flooring”
and of approved color and shade. The completed panel shall be completely removable and
shall remain in position without screwing or bolting to the on the inner side with stickers for
easy identification and reassembly whenever required. Suitable backing material shall be
provided on the underside of the particle board to prevent warping and / or to cater to
specified loading. Suitable removable covers shall be provided to serve as outlets for the
Imposed Loading:
➢ The finished floor shall be capable of supporting uniformly distributed loads of 500 to
Kg. per m2of floor area as specified in data sheet. A point load of 450 Kg on 600 sq.mm on
any part of the panel or a line load of 725 Kg on 100mm strip across the panel length shall
not result in a deflection greater than 2.5mm.
➢ The finished floor shall be true to lines and levels and present a neat flush surface.
Vendor Drawing:
➢ Vendor shall prepare and submit a layout drawing for false floor giving all details including
supporting system for approval. If so called for, vendor shall also submit his calculations for
the supporting system with all relevant data assumed, to the GWIL for his approval. Work
shall be carried out on approved drawings only.
Fire Proof Doors:
Material and Workmanship:
➢ The design of fire proof doors and the materials to be used in their fabrication have to be
such that they shall be capable of providing the effective barrier to the spread of fire. The
materials, fabrication and erection of fire proof doors shall confirm to IS:3614 (Part – I). The
fire proof doors shall be obtained from an approved manufacturer. Specific approval for such
purchase shall be obtained beforehand. Sample approval shall also be obtained from testing
authority as per the standard IS: 3614 (Part – 2) for the specified degree of fire rating in
hours. All fire proof doors shall have specified sizes and confirm to the description in the
respective items of work.
➢ Fire proof door shutters shall be of zinc coated weldable steel (confirming to BS:6687) or
stainless steel (conforming to IS:304) sheet (18G minimum) fixed in a frame work of rolled
channel. The shutter shall consist of an insulating material like mineral wool in required
thickness to satisfy the specified fire rating. Normally the thickness of door shutter shall not
be less than 35mm for two-hour fire rating and 46mm for four-hour fire rating. The shutter
with the required insulating material shall be mounted on angle iron frame or the special
made frame from zinc coated (16G minimum) weldable steel sheet. The shutter shall be
fixed to frame by means of suitable hinges and shall have a three-way latching system. All
the doors shall be provided with a coat of primer and one coat of synthetic enamel paint to
attain the specified fire rating. All other accessories like hinges, door lock, hold fasts, etc.
shall be provided as approved by TAC (Tariff Advisory Committee). All these accessories shall
be compatible with the material used for door and shutter.
SECTION – 5 STRUCTURAL STEEL WORK
STRUCTURAL STEEL WORK
Applicable Codes and Specifications:
The supply, fabrication, erection and painting of structural steel works shall comply with
the following specifications, standards and codes unless otherwise specified herein. All
standards, specifications and codes of practices referred to herein shall be the latest
editions including all applicable official amendments and revisions.
IS: 808 Dimensions for Hot Rolled Steel sections
Covered Electrodes for Manual Metal Arc Welding of Carbon and Carbon
Manganese Steel
IS: 800 Code of Practice for General Construction in Steel
Code of Practice for Use of Cold Formed Light Gauge Steel Structural
Members in General Building Construction
IS: 806 Code of Practice for Use of Steel Tubes in General Building Construction
IS: 7205 Safety Code for Erection of Structural Steel Work
IS: 7215 Tolerances for Fabrication of Steel Structures
IS: 4000 High Strength Bolts in Steel Structure – Code of Practice
AISC Specifications for Design, Fabrication and Erection of Buildings
IS: 1161 Steel Tubes for structural purposes
Ready Mixed paint, Brushing, Red Lead, Non-setting, Priming.
IS:110 Ready Mixed paint, brushing, grey filler for enamels for use over primers.
Ready Mixed paint, Brushing, Finishing, and Exterior Semigloss for general
purposes, to Indian Standard colors.
Ready Mixed paint, Brushing, Bituminous, Black, Lead free, Acid, Alkali and
heat resisting.
Ready Mixed paint, Brushing, Acid resisting for protection against acid
fumes, color as required.
IS:341 Black Japan, Types A, B and C
IS:2339 Aluminum paint for general purposes, in Dual container
Specification for enamel, synthetic, exterior, type 1, (a) Undercoating, (b)
IS:2933 Specification for enamel, exterior, type 2, (a) Undercoating, (b) finishing.
IS:5905 Sprayed aluminum and zinc coatings on Iron and Steel.
IS:6005 Code of practice for phosphating of Iron and Steel.
Specification for ready mixed paint, brushing, bituminous, black, lead free,
acid, alkali, water & chlorine resisting.
IS:13183 Aluminum paint, Heat resistant.
SIS-05-5900 (Swedish Standard)
Mild steel tubes, tubulars and other Wrought steel fittings
IS: 1239 Part 1 – Mild steel tubes
Part 2 – Mild steel tubulars and other wrought steel pipe fittings
IS: 1363 Hexagon Head Bolts, Screws and Nuts of product Grade C (Size range M5 to
(Parts 1 to 3) M64)
Technical Supply Conditions for Threaded Fasteners
IS: 1852 Rolling and Cutting Tolerances for Hot Rolled Steel Products
IS: 1977 Structural Steel (Ordinary Quality)
IS: 2062 Steel for General Structural Purposes
IS: 2074 Ready Mixed Paint, Air drying, Red Oxide Zinc Chrome and Priming
IS: 3502 Steel Chequered Plate
IS: 3757 High Strength Structural Bolts
IS: 5369 General Requirements for Plain Washers and Lock Washers
IS: 5372 Taper Washers for Channels
IS: 5374 Taper Washer for 1 Beams
IS: 6610 Heavy Washers for Steel Structures
IS: 8500 Structural Steel-micro alloyed (medium and high strength qualities)
Code of practice for design, fabrication and erection of vertical mild steel
cylindrical welded storage tanks
Code of Practice for use of Metal Arc Welding for General construction in
IS: 822 Code of Procedure for Inspection of Welds
Recommended Practice for Radiographic examination of Fusion – Welded
Butt Joints in Steel Plates
IS: 1200 Method of Measurement in Building Civil Works
IS: 1477 Code of Practice for Painting of (Parts 1&2) Ferrous Metals in Buildings
IS: 2595 Code of Practice for Radiographic Testing
IS: 3658 Code of Practice for Liquid Penetrate Flaw Detection
IS: 5334 Code of Practice for Magnetic Particle Flaw Detection of Welds
Recommendations for Metal Arc Welding of Carbon and Carbon Manganese
Steel Materials:
All materials used shall be new, unused and free from defects.
Steel conforming to IS: 1977 shall be used only for the following:
Fe310-0 For general purposes such as door/window frames, grills, steel
handrails, fence posts, tee bars and other non-structural use.
Fe410-0 For structures not subjected to dynamic loading other than wind loads such
(St 42-0) as: Platform roofs, foot over bridges, building, factory sheds etc.
Fe510-0 Grade steel shall not be used
a) If welding is to be employed for fabrication
b) If site is in severe earthquake zone
c) If plastic theory of design is used
Drawings prepared by the VENDOR/CONTRACTOR:
➢ The VENDOR/CONTRACTOR shall prepare all fabrication and erection drawings for the
entire work. All the drawings for the entire work shall be prepared in metric units. The
drawings shall preferably be of one standard size and the details shown there in shall be
clear and legible.
➢ All fabrication drawings shall be submitted to the Engineer-In-Charge for approval.
➢ No fabrication drawings will be accepted for Engineer In charge’s approval unless
checked and approved by the VENDOR/Contractor’s qualified structural engineer and
accompanied by an erection plan showing the location of all pieces detailed. The
VENDOR/CONTRACTOR shall ensure that connections are detailed to obtain ease in
erection of structures and in making field connections.
➢ Fabrication shall be started by the VENDOR/CONTRACTOR only after Engineer In charge’s
approval of fabrication drawings. Approval by the Engineer-In-Charge of any of the
drawings shall not relieve the VENDOR/CONTRACTOR from the responsibility for
correctness of engineering and design of connections, workmanship, fit of parts, details,
material, errors or omissions or any and all work shown thereon. The Engineer In
charge’s approval shall constitute approval of the size of members, dimensions and
general arrangement but shall not constitute approval of the connections between
members and other details.
➢ The drawings prepared by the VENDOR/CONTRACTOR and all subsequent revisions etc.
shall be at the cost of the VENDOR/CONTRACTOR for which no separate payment will be
➢ All workmanship and finish shall be of the best quality and shall conform to the best-
approved method of fabrication. All materials shall be finished straight and shall be
machined/ground smooth true and square where so specified. All holes and edges shall
be free of burrs. Shearing and chipping shall be neatly and accurately done and all
portions of work exposed to view shall be neatly finished. Unless otherwise approved by
the Engineer-In-Charge, reference may be made to relevant IS codes for providing
standard fabrication tolerance. Material at the shops shall be kept clean and protected
➢ Shop/field connections shall be as per approved fabrication drawings. In case of bolted
connections, taper washers or flat washers or spring washers shall be used with bolts as
necessary. In case of high strength friction grip bolts, hardened washers to be used under
the nuts or the bolt heads whichever are turned to tighten the bolts. The length of the
bolt shall be such that at least one thread of the bolt projects beyond the nut, except
in case of high strength friction grip bolts where this projection shall be at least three
times the pitch of the thread.
➢ In all cases where bearing is critical, the unthreaded portion of bolt shall bear on the
members assembled. A washer of adequate thickness may be provided to exclude the
threads from the bearing thickness, if a longer grip bolt has to be used for this purpose.
➢ All connections and splices shall be designed for full strength of members or loads.
Column splices shall be designed for the full tensile strength of the minimum cross
section at the splice.
➢ All bolts, nuts, washers, electrodes, screws etc., shall be supplied/brought to site 10%
in excess of the requirement in each category and size. Rates shall cover the cost of this
extra quantity.
➢ All members likely to collect rainwater shall have drain holes provided.
➢ All materials shall be straight and, if necessary, before being worked shall be
straightened and/or flattened by pressure and shall be free from twists. Heating or
forging shall not be resorted to without the prior approval of the Engineer-In-Charge in
Rolling and Forming:
➢ Plates, channels, R.S.J. etc., for circular bins, bunkers, hoppers, gantry girders, etc.,
shall be accurately laid off and rolled or formed to required profile/shape as called for
on the drawings. Adjacent sections shall be match-marked to facilitate accurate
assembly, welding and erection in the field.
High Strength Friction Grip Bolting:
➢ Inspection after tightening of bolts shall be carried out as stipulated in the appropriate
standards depending upon the method of tightening and the type of bolt used.
➢ Welding procedure shall be submitted to the Engineer-In-Charge for approval. Welding
shall be entrusted to qualified and experienced welders who shall be tested
periodically and graded as per IS 817, IS: 7310 (Part 1) and IS: 7318 (Part 1).
➢ While fabricating plated beams and built up members, all shop splices in each
component part shall be made before such component part is welded to other parts of
the members. Wherever weld reinforcement interferes with proper fit-up between
components to be assembled off welding, these welds shall be ground flush prior to
➢ Approval of the welding procedure by the Engineer-In-Charge shall not relieve the
Contractor of his responsibility for correct and sound welding without undue distortion
in the finished structure.
➢ No welding shall be done when the surface of the members is wet nor during periods of
➢ Each layer of a multiple layer weld except root and surfaces runs may be moderately
penned with light blows from a blunt tool. Care shall be exercised to prevent scaling or
flaking of weld and base metal from overweening.
➢ No welding shall be done on base metal at a temperature below –50 C. Base metal shall
be preheated to the temperature as per relevant IS codes.
➢ Electrodes other than low-hydrogen electrodes shall not be permitted for thickness of
32 mm and above.
➢ All welds shall be inspected for flaws by any of the methods described under Sub-clause
4.6.3. The choice of the method adopted shall be agreed with the Engineer-In-Charge.
➢ The correction of defective welds shall be carried out in a manner approved by the
Engineer-In-Charge without damaging the parent metal. When a crack in the weld is
removed, magnetic particle inspection or any other equally positive means approved by
the Engineer-In-Charge shall be used to ensure that the whole of the crack and material
up to 25 mm beyond each end of the crack has been removed. The cost of all such tests
and operations incidental to correction shall be borne by the Contractor.
➢ The dimensional and weight tolerances for rolled shapes shall be in accordance with
ARE: 1852 for indigenous steel and equivalent applicable codes for imported steel. The
tolerances for fabrication of structural steel shall be as per ARE:
➢ Cutting, punching, drilling, welding and fabrication tolerances shall be generally as per
relevant IS codes.
➢ Where compression joints are specified to be designed for bearing, the bearing surfaces
shall be milled true and square to ensure proper bearing and alignment.
➢ The Contractor shall give due notice to the Engineer-In-Charge in advance of the works
being made ready for inspection. All rejected material shall be promptly removed from
the shop and replaced with new material for the Engineer In charge’s inspection. The
fact that certain material has been accepted at the Contractor’s shop shall not
invalidate final rejection at site by the Engineer-In-Charge if it fails to conform to the
requirements of these specifications, to be in proper condition or has fabrication
inaccuracies which prevent proper assembly nor shall it invalidate any claim which the
Employer may make because of defective or unsatisfactory materials and/or
➢ No materials shall be painted or dispatched to site without inspection and approval by
the ENGINEER INCHARGE unless such inspection is waived in writing by the ENGINEER-
➢ The Contractor shall provide all the testing and inspection services and facilities for shop
work except where otherwise specified.
➢ For fabrication work carried out in the field the same standard of supervision and quality
control shall be maintained as in shop fabricated work. Inspection and testing shall be
conducted in a manner satisfactory to the Engineer-In-Charge.
➢ Inspection and tests on structural steel members shall be as set forth below.
Material Testing:
➢ If mill test reports are not available for any steel materials the same shall be tested by
the Contractor to the Employer’s Representative’s satisfaction to demonstrate
conformity with the relevant specification.
Tests on Welds:
(a) Magnetic Particle Test:
➢ Where welds are examined by magnetic particle testing, such testing shall be carried
out in accordance with relevant IS codes. If heat treatment is performed, the completed
weld shall be examined after the heat treatment. All defects shall be repaired and
retested. Magnetic particle tests shall be carried out using alternating current. Direct
current may be used with the permission of the Engineer-In-Charge.
(b) Liquid Penetrate Inspection:
➢ In the case of welds examined by Liquid Penetrate Inspection, such tests shall be carried
out in accordance with relevant IS Code. All defects shown shall be repaired and
(c) Radiographic Inspection:
➢ All full-strength butt welds shall be radio graphed in accordance with the recommended
practice for radiographic testing as per relevant IS code.
Dimensions, Workmanship & Cleanliness:
➢ Members shall be inspected at all stages of fabrication and assembly to verify that
dimensions, tolerances, alignment, surface finish and painting are in accordance with
the requirements shown in the Contractor’s approved fabrication drawings.
➢ In the event of failure of any member to satisfy inspection or test requirement, the
Contractor shall notify the Engineer-In-Charge. The Contractor must obtain permission
from the Engineer-In-Charge before any repair `is undertaken. The quality control
procedures to be followed to ensure satisfactory repair shall be subject to approval by
the Engineer-In-Charge.
➢ The Engineer-In-Charge has the right to specify additional testing as he deems necessary,
and the additional cost of such testing shall be borne by the Employer, only in case of
successful testing.
➢ The Contractor shall maintain records of all inspection and testing which shall be made
available to the Engineer-In-Charge.
➢ For structures like bunkers, tanks, etc. Shop assembly is essential. For other steel work,
such as columns along with the tie beams/bracings may have to be shop assembled to
ensure satisfactory fabrication, obtaining of adequate bearing areas etc., if so desired
by the Engineer-In-Charge. All these shop assemblies shall be carried out by the
Drilling Holes for other works:
➢ As a part of this Contract, holes in members required for installing equipment or steel
furnished by other manufacturers or other contractors shall be drilled by the
VENDOR/CONTRACTOR at no extra cost of the EMPLOYER. The information for such extra
holes will be supplied by the EMPLOYER/ENGINEER-IN-CHARGE.
Marking of Members:
➢ After checking and inspection, all members shall be marked for identification during
erection. This mark shall correspond to distinguishing marks on approved erection
drawings and shall be legibly painted and stamped on it. The erection mark shall be
stamped with a metal dye with figures at least 20 mm high and to such optimum depth
as to be clearly visible.
➢ All erection marks shall be on the outer surface of all sections and near one end, but
clear of bolt holes. The marking shall be so stamped that they are easily discernible
when sorting out members. The stamped marking shall be encircled boldly by a
distinguishable paint to facilitate easy location.
➢ Erection marks on like pieces shall be in identical locations. Members having lengths of
7.0 m or more shall have the erection mark at both ends.
➢ Any error in shop fabrication which prevents proper assembling and fitting up of parts
in the field by moderate use of drift pins or moderate amount of reaming will be
classified by the Engineer-In-Charge as defective workmanship. Where the Engineer-In-
Charge rejects such material or defective workmanship, the same shall be replaced by
materials and workmanship conforming to the Specifications by the Contractor, at no
cost to the Employer.
Painting of Steel Work:
➢ All fabricated steel material, except those galvanized shall receive protective paint
coating as specified in specification, which is described below.
➢ Red-oxide – zinc chrome primer shall conform to IS:
➢ Synthetic enamel paint shall conform to IS:
➢ Aluminum paint shall conform to IS:
➢ All the materials shall be of the best quality from an approved manufacturer. Contractor
shall obtain prior approval of the Engineer-In-Charge for the brand of manufacture and
the color/shade. All the materials shall be brought to the site in sealed containers.
➢ Painting work shall be carried out only on thoroughly dry surfaces. Painting shall be
applied either by brushing or by spraying. Contractor shall procure the appropriate
quality of paint for this purpose as recommended by the manufacturer. The
workmanship shall generally conform to the requirement of IS: 1477 (Part 2).
➢ The type of paint, number of costs etc. shall be as specified in the respective items of
work. Primer and finish paint shall be compatible with each other to avoid cracking and
wrinkling. Primer and finish paint shall be from the same manufacturer. All the surfaces
shall be thoroughly cleaned of oil, grease, dirt, rust and scale. The methods to be
adopted using solvents, wire brushing, power tool cleaning etc., shall be as per IS:
(Part – I) and as indicated in the item of work. It is essential to ensure that immediately
after preparation of the surfaces; the first coat of red oxide-zinc chrome primer shall
be applied by brushing and working it well to ensure a continuous film without holidays.
After the first coat becomes hard dry, a second coat of primer shall be applied by
brushing to obtain a film free from `holidays.
➢ After the second coat of primer is hard dry, the entire surface shall be wet rubbed
cutting down to a smooth uniform surface. When the surface becomes dry, the
undercoat of synthetic enamel paint of optimum thickness shall be applied by brushing
with minimum of brush marks. The coat shall be allowed to hard dry. The under coat
shall then be wet rubbed cutting down to a smooth finish, taking adequate care to ensure
that at no place the undercoat is completely removed. The surface shall then be allowed
➢ The first finishing coat of paint shall be applied by brushing and allowed to hard dry.
The gloss from the entire surface shall then be gently removed and the surface dusted
off. The second finishing coat shall then be applied by brushing.
➢ At least 24 hours shall elapse between the applications of successive coats. Each coat
shall vary slightly in shade and this shall be got approved by the Engineer-In-Charge.
Acceptance of Steel, its Handling & Storage:
➢ The Contractor shall carefully check the steel to be erected at the time of acceptance.
Any fabrication defects observed should be brought to the notice of the Engineer-In-
➢ No dragging of steel shall be permitted. All steel shall be stored 300mm above ground
on suitable packing to avoid damage. It shall be stored in the order required for erection,
with erection marks visible. All storage areas shall be prepared and maintained by the
Contractor. Steel shall not be stored in the vicinity of areas where excavation or grading
will be done and, if so stored temporarily, this shall be removed by the Contractor well
before such excavation and/or grading commences to a safe distance to avoid burial
under debris. Scratched or abraded steel shall be given a coat of primer in accordance
with the Specifications for protection after unloading and handling prior to erection. All
milled and machined surfaces shall be properly protected from rust/corrosion by suit
able coating and also from damage.
Anchor Bolts & Foundations:
➢ The Contractor shall carefully check the location and layout of anchor bolts embedded
in foundations constructed, to ensure that the structures can be properly erected as
shown on the drawings. Any discrepancy in the anchor bolts/foundation shall be reported
to the Engineer-In-Charge.
➢ Leveling of column bases to the required elevation may be done either by providing
shims or three nuts on the upper threaded portion of the anchor bolt. All shim stock
required for keeping the specified thickness of grout and in connection with erection of
structures on foundations, crane brackets or at any other locations shall be of good M.S.
plates and shall be supplied by the Contractor at his cost.
➢ A certain amount of cleaning of foundations and preparing the area is considered normal
and shall be carried out by the Contractor at no extra cost. Here beams bear in pockets
or on walls; bearing plates shall be set and leveled as part of the work. All grouting
under column base plates or beam bearing plates will be carried out by the Contractor.
Assembly & connections:
➢ Field connections may be affected by riveting, bolting, welding or by use of high strength
friction grip bolts as shown on the design and erection drawings.
➢ All field connection work shall be carried as per the drawings. All bolts, nuts, washers,
rivets, electrodes required for field connections shall be supplied by the Contractor free
of cost. All assembling shall be carried on a level platform. Drifts shall be used only for
drawing the work to proper position and must not be used to such an extent as to damage
the holes. Size of drifts larger than the normal diameter of hole shall not be used. Any
damaged holes or burrs must be rectified to the satisfaction of the Engineer-In-Charge.
➢ Corrections of minor misfits and reasonable amount of reaming and cutting of excess
stock from rivets shall be considered as a part of erection. Any error in the shop, which
prevents proper fit on a moderate amount of reaming and slight chipping or cutting,
shall be immediately reported to the Engineer-In-Charge.
➢ All structural steel shall be erected as shown on the drawings prepared by the
Contractor. Proper size steel cable slings, etc., shall be used for hoisting. Guys shall not
be anchored to existing structures, foundations, etc., unless so permitted by the
Engineer-In-Charge in writing. Care shall be taken to see that ropes in use are always in
good condition.
➢ Steel columns in the basement, if any, are to be lowered and erected carefully with the
help of a crane and/or derrick without damaging the basement walls or floor.
➢ Structural steel frames shall be erected plumb and true. Frames shall be lifted at points
such that they are not liable to buckle and deform. Trusses shall be lifted only at node
points. In the case of trusses, roof girders, all of the purlins and wind bracing shall be
placed simultaneously and the columns shall be erected truly plumb on screed bars over
the pedestals. All steel columns and beams shall be checked for plumb and level
individually before and after connections are made. Temporary bracings shall be
introduced wherever necessary to take care of all loads to which the structure may be
subjected, including erection equipment and the operation thereof. Such bracings shall
be left in place as long as may be required for safety and stability.
➢ Chequered plates shall be fixed to supporting members by tack welding or by
countersunk bolts as shown/specified in relevant drawings and/or as approved by the
Engineer-In-Charge. The edges shall be made smooth and no burrs or jagged ends shall
be left. While splicing, care should be taken so that there is continuity in pattern
between the two portions. Care should also be taken to avoid distortion of the plate
The erection of chequered plates shall include:
➢ Welding of stiffening angles/vertical stiffening ribs Cutting to size and making holes to
required shape wherever necessary to allow service piping and/or cables to pass through
Splicing as shown in relevant drawings.
➢ Smoothening of edges
➢ Fixing of chequered plates by tack welding or by countersunk bolts
➢ Providing lifting hooks for ease of lifting.
➢ As erection progresses, the work shall be securely bolted to take care of all dead load,
wind, seismic and erection stresses. No riveting or welding or final bolting shall be done until
the structure has been properly aligned and approved by the Engineer-In-Charge. No cutting,
heating or enlarging of the holes shall be carried out without the prior written approval of
the Engineer-In-Charge. The Contractor shall furnish test certificates.
➢ The Engineer-In-Charge shall have free access to all parts of the job during erection and
all erection shall be subjected to his approval. In case of faulty erection, all dismantling and
re-erecting required will be at the Contractor’s cost. No paint shall be applied to rivet heads
or field welds or bolts until these have been approved by the Engineer-In-Charge.
➢ Tolerances mentioned below shall be achieved after the entire structure or part thereof
is in line, level and plumb.
Deviation of column axes at foundation top level with respect to true axes:
(a) In longitudinal direction ±5 mm
(b) In lateral direction ±5 mm
Deviation in the level of bearing surface of columns at foundation top with respect to true
Out of plumb ness (verticality) of column axis from true vertical axis, as measured at
(a) For columns up to and including 15 meters ±1/1000 of column height in mm
or ±15 mm whichever is less
(b) For columns exceeding ±1/1000 of column height in mm
or ±20 mm whichever is less
Deviation in straightness in longitudinal transverse ±1/1000 of column height in mm
planes of column at any height or ±10 mm whichever is less
Point along the height
Difference in erected position of adjacent Pairs of ±10 mm
columns along length or across width of building prior to
connecting trusses/beams with respect to true distance
Width of building prior to connecting trusses/beams with ±10 mm
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. VOL 1A Tech Bid Navda.pdf
2. VOL -1B _GCC_Navda.pdf
3. VOL 1B PART - 2 Navda.pdf
4. VOL 1B PART -3 Navda.pdf
5. VOL 1B PART-4 EMD GR 2025.pdf
6. VOL 1B PART-5 GST circular.pdf
7. VOL II A Extent of work Tech Specification Navda.pdf
8.Detail Specification of Schedule C for OM of Navda all PS (1).pdf
9. VOL II C Technical Specification Electromechanical works Navda.pdf
10. Volume III Price Bid -Navda.pdf
11. ONM Colour work related.pdf
12. VOL IV General Condition of OM Contract Navda.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .